Loading...
Zayo-PT230418R LEGENDUNDERGROUNDAERIALEXIST. ZAYO NETWORKPULL-THRU EXIST.TO BE PLACED BY OTHERSISO-0644299870 S DENTON TAP RDCOPPELL, TEXASR001PROPOSEDROUTEDENTON TAP RD DENTON TAP RDSOUTHWESTERN BLVDE BELT LINE RDE BELT L INE RD S BELT LINE RD BEGINPROJECT RCONTACT 48 HOURS PRIOR TO CONSTRUCTION R R00'100'100'100'0+000+000+000+00PROP. (000') RISER000 FT.OHGEXIST. MKR100'U/G UTILITIESCAUTION ! ! !IN AREAWWCITY/STATE/COUNTY/SECTIONCITY/STATE/COUNTY/SECTIONCITY/STATE/COUNTY/SECTIONCITY/STATE/COUNTY/SECTIONMKRFOREIGN 000SBCMKRUNKMKRCATVMKRTELMKRAT&TMKRSWBMKRTWTMKRGTEMKRABNMKRMFNMKRLV3MKRQWEMKRCCLCMKRLGNMKRGASMKRFP&LMKREQUATIONSTA 0+00 BK=STA 0+00 AHPOINT OF INTERSECTIONSTA 0+00 BK=STA 0+00 AH000 R R ZYXTYPICAL SINGLE DOORPULLBOXDISTRIBUTIONPULL BOX TYPEX"Y"Z"8"24"24"CABLE STORAGE36"36"12"TYPICAL DETAILASUSPENDED EMTCONCRETE DECK OR WALLHDPE'S AS SPECIFIEDINNERDUCTS AND/OR ANY NUMBER OF BOLT (LENGTH AS REQ'D)STANDARD PIPE HANGERGALVANIZED HANGER 3/4 " x NC10 STANDARD FIBER OPTIC PER DRAWINGCONDUIT/SIZED 3/4 EXPANSION& LOCKWASHER CABLESHIELD BOLT 3/4 EXPANSION TYPICAL DETAILBCONCRETE DECK OR WALLCLOSE COUPLED EMTANY NUMBER OF INNERDUCTS AND/OR HDPE'S AS SPECIFIEDSTANDARD PIPE CLAMPFIBER OPTIC CABLECONDUIT/SIZED PER DRAWINGTYPICAL DETAILCRKINDORF SUSPENDED EMTCONCRETE DECK OR WALLTYPICAL DETAIL DDISTRIBUTION6"12"12"CONSULT THE BUILDING SPECIFICATIONSUTILIZE INSIDE PLANT DETAIL ORNOTE: R R R WWWFOCMKR FOCMKRGASMKRDENTON TAP RD SB DRIVEWAYDRIVEWAYDRIVEWAYWWWWW3+00 4+00 5+006+00SEE DETAIL "B"ON THIS SHEET PROP. MKRSTA 6+62 BK = 0+00 AHAT FACE OF BUILDINGCONTRACTOR TO LOCATE, EXPOSEAND INTERCEPT EXIST. CUST.CONDUIT, PLACE SPLIT WYE, BEGINPULL THRU EXIST. 4" CONDUIT E/W1-24ct FIBER OPTIC CABLEU/G UTILITIESCAUTION ! ! !IN AREAU/G UTILITIESCAUTION ! ! !IN AREAU/G UTILITIESCAUTION ! ! !IN AREADENTON TAP RD NB WWW2+00RCAUTION !!!!CONTRACTOR TO LOCATE &VERIFY ALL EXISTING UTILITIESPRIOR TO CONSTRUCTIONCAUTION!!!EXIST. BURIED FIBER, TELEPHONE, CATV, GAS, ELECTRIC, WATER,SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREAAND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACTLOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING.NOTE:FOR LINES CROSSING STATE HIGHWAYS OR ROADS, CROSSING INTERSECTINGSTREETS / COUNTY ROADS, OR PASSING THROUGH THE PROTECTED ROOT AREA OFDESIRABLE TREES, IT IS CLEARLY SHOWN IN THE DESCRIPTION AND ON EACH PAGEOF DRAWINGS THAT THE LINE WILL BE INSTALLED BY CONVENTIONAL DRY AUGERBORE UNLESS OTHERWISE APPROVED BY A TxDOT ENGINEER OR INSPECTOR. INADDITION, CASING SHOULD BE SHOWN UNDER HIGHWAYS AND PAVED CITY STREET /COUNTY ROAD INTERSECTIONS.MAINTAIN 5 FT HORIZONTAL CLEARANCECONTRACTOR:FROM ALL CITY UTILITIESEA1--FTRNOTE:UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. IT IS THE CONTRACTOR RESPONSIBILITY TO FIELD LOCATE ALLUNDERGROUND OBSTRUCTIONS AND UTILITIES PRIOR TO CONSTRUCTION. COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR.SEE PROFILE ONSHEET 1AWARNINGBURIEDGAS LINE10GA TRACER WIRE. STA 2+08 TO STA 4+49DIR. BORE (241') 2-1.25" HDPEE/W 24ct FIBER OPTIC CABLE &48" MIN. DEPTH10GA TRACER WIRE. STA 1+08 TO STA 2+08DIR. BORE (100') 2-1.25" HDPEE/W 24ct FIBER OPTIC CABLE &48" MIN. DEPTHDETAIL"A"AT EXIST. ZAYO HHFACING EASTSTA 1+00SEE DETAIL "A"ON THIS SHEET TIE-IN NEW DUCT TO ABOVENET HHREPLACE WITH NEW ZAYO HHPLACE 100' SLACK COILNOTE:SEE INSIDE PLANTSHEET 002 FOR FIBER ROUTECONTINUATIONSTA 4+49PLACE ZAYO HHPLACE 100' SLACK COIL(25 SF) OF CONCRETE SIDEWALKREMOVE & RESTOREPULL (194') OF 24ct FIBER OPTIC CABLESTA 4+68 TO STA 6+62THRU EXIST. BUILDING CONDUITE/W 24ct FIBER OPTIC CABLE &TRENCH & PLACE (19') 2-1.25" HDPESTA 4+49 TO STA 4+6810GA TRACER WIREEXIST. ZAYONETWORKSTA 1+00EXIST. ZAYO HH TO BEREPLACEDPROP. 2-1.25" HDPEE/W FIBER OPTIC CABLEDETAIL"B"PROP. ZAYO HHFACING NORTHPROP. 2-1.25" HDPEE/W FIBER OPTIC CABLESTA 4+49PROP. ZAYO HHEXIST. 4" BLDGDUCTSEE PROFILE ONSHHET 1BE/W 24ct FIBER OPTIC CABLE &TRENCH & PLACE (8') 2-1.25" HDPESTA 1+00 TO STA 1+0810GA TRACER WIREWL @ 7' DEPTH PROFILEDENTON TAP RD CROSSINGLOOKING NORTHEND TRENCH BEGIN DIR. BORE CROSSING STA 1+08 STA 2+08 END DIR. BORE CROSSING BEG. DIR. BORE NORTHDENTON TAP RDDENTON TAP RD& 10GA TRACER WIREE/W 24ct FIBER OPTIC CABLEDIR. BORE (100') 2-1.25" HDPERNOTE:UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. IT IS THE CONTRACTOR RESPONSIBILITY TO FIELD LOCATE ALLUNDERGROUND OBSTRUCTIONS AND UTILITIES PRIOR TO CONSTRUCTION. COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR.R480490500510520480490500510520 PROFILEDENTON TAP RD CROSSINGLOOKING NORTHPLACE ZAYO HH END DIR. BORE, BEG. TRENCH STA 4+492+003+004+00END DIR. BORE CROSSINGSTA 2+08 BEG. DIR. BORE NORTH & 10GA TRACER WIREE/W 24ct FIBER OPTIC CABLEDIR. BORE (234') 2-1.25" HDPERNOTE:UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. IT IS THE CONTRACTOR RESPONSIBILITY TO FIELD LOCATE ALLUNDERGROUND OBSTRUCTIONS AND UTILITIES PRIOR TO CONSTRUCTION. COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR.R480490500510520480490500510520 870 S DENTON TAP RD, COPPELL, TEXAS 75019BUILDING FLOOR LAYOUTDETAIL"A"BUILDING ELEC./TELECO RMLOOKING EASTDETAIL"A"BUILDING ELEC./TELECO RMLOOKING SOUTHDETAIL"A"BUILDING ELEC./TELECO RMLOOKING SOUTHDETAIL"A"BUILDING ELEC./TELECO RMLOOKING SOUTHDETAIL"B"CUSTOMER'S SUITE 250LOOKING EASTDETAIL"B"CUST. SERVER RACKLOOKING NORTHDETAIL"B"CUST. SERVER RACKLOOKING NORTHSEE DETAIL "A"ON THIS SHEET SEE DETAIL "B"ON THIS SHEET PLACE 1-1.25" PLENUM INDT.E/W 24ct FIBER OPTIC CABLESTA 1+15AT EXISTING CUSTOMERSERVER WALL EQUIPMENTRACK. END CABLEPLACEMENT THRU 1-1.25"PLNM INDT. PROPOSE ZAYORACK MOUNT FIBERDISTRIBUTION PANEL.PLACE 50' SLACK COIL FORFIBER TERMINATION.STA 6+62 BK = 0+00 AHAT BUILDING WALLCONTINUE PULL THRU EXISTINGCUSTOMER 4" CONDUIT TO MPOESTA 0+15PROP. ZAYO PANELPLACE 50' SLACK COILSTA 1+15AT EXISTING CUSTOMERSERVER WALL EQUIPMENTRACK. END CABLEPLACEMENT THRU 1-1.25"PLNM INDT. PROPOSE ZAYORACK MOUNT FIBERDISTRIBUTION PANEL.PLACE 50' SLACK COIL FORFIBER TERMINATION.STA 0+15PROP. ZAYO PANELPLACE 50' SLACK COILEXIST. BUILDING 4"CONDUIT FROM ROWPROP. 24ct FOCCUSTOMER'S SUITE 250FOSTER & FOSTERBUILDING'SELECTRICAL/TELECOMROOMEXISTING CUST. SERVERRACKRCONST. NOTE:SCHEDULE ACCESS TO RIVERCHASE CHIROPRACTORPH: 972-393-3737REA-15100STA 0+15 TO STA 1+15PLACE (100') 1-1.25" PLENUM INDT.E/W 24ct FIBER OPTIC CABLESTA 0+00 TO STA 0+15PULL (15') OF 24ct FIBER OPTIC CABLETHRU EXISTING CUSTOMER CONDUIT