Loading...
Frontier-PT230519 (2)A copy of the approved permit must be on the job site at all times Page 1 of 5RIGHT-OF-WAY USE PERMIT APPLICATION Rev.08/2020 Permit Valid for 120 Days From Date of Approval All activity authorized by this permit shall be in accordance with CHAPTER 283 of the Texas Local Government Code and the City of Coppell Public Rights-of-Way Management ordinance No. 2001-944 Date of Submittal:__________________ Applicant’s Job # / Work Order #_____________________ Project Name / Location and Address:__________________________________________________ Permit Fee: $100.00 (No fee for applications submitted on behalf of Utility Companies with a current Public Rights-of-Way Management Ordinance Registration). S.P.C.O.A. Certificate # ____________________ Utility Company Information: Oncor Electric Delivery Atmos Energy Frontier Spectrum Level 3 Other:________________________________________________________ Utility Company Representative:____________________________________________________ E-mail Address:__________________________________Telephone:______________________ Contractor Information: General Contractor:______________________________________________________________ General Contractor Representative:_________________________________________________ E-mail Address:__________________________________Telephone:______________________ Project Information: General Description of Proposed Construction (Attach Plan & Profile, See Page 5 for Example): Estimated Start Date:_______________ Estimated Completion Date:_________________ Has 811 and/or utility companies been contacted 48 hours prior to locate existing utilities? Yes No If No, state reason:_________________________________________________ Is removal of existing streets, alleys or sidewalks necessary? Yes No If YES, repair must have a City inspection prior to completion. Call 972-304-3679. Is closure of any traffic lanes or driveway approaches necessary? Yes No If YES, a traffic control plan in accordance with TMUTCD standards must be submitted, and the following departments must be notified of the location and duration of the closure: Police Department, 972-304-3600 Fire Department, 972-304-3512 Street Department, 972-462-5150 Engineering Department, 972-304-3679 Traffic lane closures are allowed from 9:30 a.m until 3:30 p.m. ONLY unless otherwise approved by the City Engineer. --Work activity is permitted from 7:00 a.m. until 7:00 p.m., Monday through Friday only.-- Right of Way Use Permit Application Page 2 of 5 This application, with signatures of Utility and Contractor representatives, must be submitted to the Engineering Department for approval prior to commencing work. Printing your name and date on this form indicates your acceptance of the terms and conditions of this application. Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand, or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. ________________________________________ ___________________________________ Signature of Utility Company Representative Date ________________________________________ ___________________________________ Signature of Contractor Representative Date ________________________________________ ___________________________________ APPROVED City Representative Date DENIED Comments: E-mail address to return completed permit:__________________________________________________ Submit permit application by e-mail to engineer@coppelltx.gov, or deliver application to the Engineering Department, Town Center Business Park, 265 E Parkway Blvd, Coppell, TX 75019 SUMMARY OF REQUIREMENTS FOR WORK WITHIN THE CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS 1.A copy of the valid approved City of Coppell permit is required on the project site at all times. 2.Property owners (commercial and residential) adjacent to the project must be notified of the project timeline and provided contractor names and phone numbers. No access to private property without prior coordination with property owner. 3.Proper erosion control measures must be taken, in accordance with the Coppell Erosion Control Ordinance No. 91-514. 4.Follow Texas MUTCD standards for work in traffic zones. Lane closures require the use of a flashing arrow board for advance warning. 5.Grading shall be restored or improved, and sod replaced when necessary. 05/19/2023Scott Latta X Right of Way Use Permit Application Page 3 of 5 6.Irrigation repairs must be performed in a timely manner. 7.Follow OSHA trench safety guidelines at all times. 8.Repair existing utilities that are damaged, including but not limited to: Clean-outs, water valves, wastewater manholes, water lines, wastewater lines and storm sewer lines. 9. Density tests may be required, at applicant’s expense, in trench lines (ASTM). 10.Protection and repair of traffic control devices and signage is the responsibility of the contractor. 11.No work is to be done in collector roadways before 9:30 a.m. or after 3:30 p.m. 12.Prior request of work activity on weekends and holidays must be submitted in writing. 13.Utility line locates must be performed in advance of construction by calling 811 or logging on to the Texas811 Portal at: http://www.texas811.org. Additional utility contacts are as follows: COPPELL PUBLIC WORKS - OPERATIONS COPPELL PUBLIC WORKS - ENGINEERING 972-304-3679 DENTON COUNTY LEVEE DISTRICT 972-315-5019 T.C.E.Q. Region 4 817-588-5800 IRVING WATER UTILITIES 972-721-2281 ATMOS ENERGY 888-286-6700 EXPLORER PIPELINE 918-493-5100 ONCOR ELECTRIC DELIVERY 888-313-6862 972-462-5150 HOMEOWNER ASSOCIATIONS Planning Department: H.O.A. List F.E.M.A. 940-898-5399 DALLAS WATER UTILITIES 214-670-5111 AT&T 800-924-9420 COSERV Gas & Electric 940-321-7800 FRONTIER COMMUNICATIONS 800-584-3384 SPECTRUM CABLE 833-780-1880 14. Debris must be removed from work area daily and disposed of properly outside the City. 15.Streets, sidewalks and alleys must be kept clear of construction materials and debris. 16.“Clean-up” requires returning work area to pre-construction condition or better. Right of Way Use Permit Application Page 4 of 5 Contact Coppell Public Works Operations at 972/462-5150 to schedule an inspection with Utility and Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule verification inspection may delay future projects. Franchise Utility Name:___________________________________________________________ Project Location or Address:_______________________________________________________ Sub-contractor Company Name:____________________________________________________ 24 hr. Contact Number:____________________________________________________________ Date of Verification Appointment:_________________________ Time:____________________ -INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORKS PERSONNEL- Inspected by:_________________ of Utilities Maintenance Division on _______________ and found to be acceptable, not acceptable because:___________________________ Follow-up needed? No Yes, follow-up scheduled for:__________________________ Inspected by:__________________ of Streets Maintenance Division on _______________ and found to be acceptable, not acceptable because:___________________________ Follow-up needed? No Yes, follow-up scheduled for:__________________________ A copy of this completed notice can be e-mailed to the Coppell Public Works Operations Division, or delivered to the address below: City of Coppell Public Works Department, Operations Division 816 S. Coppell Road Coppell, TX 75019 COMPLETION VERIFICATION NOTICE EXAMPLE 710 GATEWAY BLVD750 GATEWAY BLVD770 GATEWAY BLVDMH653WWWWWWWWWW16" WATERLINEWWWW W W W W W W W W WWWWWW6" WATERLINESSSSSSSSSS SSSSSSS10" SEWERLINESSSSSSSSSSSSSSSSSEWER MHW W W WW W W W W W W WWSSSSSSSS S S S S SSSSSSSSSSS21" SEWER LINE33" SEWER LINEWWWWWWWWWWW12" WATERLINE10' UTILITYEASEMENT20' UTILITYEASEMENTPROPOSED NEW BORE PLACING 1 12"HDPE CONDUIT TO PLACE FIBERR.O.W. R.O.W.70'S S S S S S PROPOSED NEW BORE TO BE PLACED 8' FROMBACK OF CURB IN THE 70' UTILITY EASEMENTR.O.W. B.O.C.EXCHANGE CIR 70' ROW36"PROPOSED 1 12" HDPE CONDUITCITY SEWER LINE 33" DEPTH UNKNOWNMAINTAIN MIN 24"SEPARATIONEXCHANGE CIR BORE PROFILEGATEWAY DR 70' ROWPROPOSED 1 12" HDPE CONDUIT (48F)36"36"10" CITYSEWER LINEMAINTAIN MIN 24"SEPARATIONMAINTAIN MIN 24"SEPARATION36" SEWERLINE36" CITYSEWER LINE16" WATER LINEDEPTH TOBE FIELDVERIFIEDDEPTH TOBE FIELDVERIFIEDPLACINGCORE DRILL MH/HH WALL TOPLACE NEW CONDUIT/FIBERBORE DETAILS: PLACED 6' FROM BOCBORE DEPTH: 36"BORE LOCATION: EXCHANGEROW/GATEWAY ROW PARTIALEASEMENTPLACINGBORE FROM MH/HH653 ACROSS GATEWAYDOWN THE ROW OF EXCHANGE 1000' TO MEETTHE CUSTOMERS ENTRANCE CONDUITPLACINGPLACE NEW 2'X3' HANDHOLE 5' FROM BACK OFCURB, LEAVE SLACK IN HHSEE WORK PRINT #2DEPTH TOBE FIELDVERIFIED910 Exc h an g e C i r , C o pp e l l , T X 7 5 01 9 , U SA F0041 400F02 F02 F02 F01 F02 1 1 1 1 150 710 GAT E WA Y B L VD750 GATE W AY B LV D 770 GA T EW AY B LV D MH653 MH652 16" WAT E R LINE 6" WATE R LINE10" SEWE RLINE SEWER M H 21" SEW ER L IN E 33" SEW ER L IN E 12" WA T E R LINE 10' UTIL I T Y EASEM E NT 20' UT I L I TY EASEM E NT PROPOS E D N EW BO R E P L AC I NG 1 12" HDPE C O ND U I T T O P L AC E FI B ER R.O.W. R.O.W.70'70' EASEM EN T PROPOS E D N EW 2'X3'HH P L AC E D A T CUSTOM E RS CO N DU I T PROPOS E D N EW BO R E T O B E PL A CE D 8 ' F RO M BACK O F CU R B I N TH E 7 0 ' UT I L I TY EA S EM E NT R.O.W.B.O.C.EXCHANG E C I R 70 ' RO W36"PROPOSED 1 12" HDPE C O ND U I T CITY SE W E R L I N E 3 3 " DE P T H U N K NO W N MAINTAIN MIN 2 4 " SEPARA T I ON EXCHA N GE C IR B OR E P R OF I L E GATEW A Y D R 7 0 ' R O W PROPOSED 1 12" HDPE C O ND U I T (4 8 F ) 36" 36" 10" CITYSEWER L I N E MAINTAIN M I N 24 " SEPARATIO N MAINTAIN M I N 24 " SEPARATIO N 36" SEWE RLINE 36" CITYSEWER LIN E 16" WAT E R LI N E DEPTH T O BE FIELDVERIFIED DEPTH TOBE FIELDVERIFIED PLACI N G CORE D R IL L M H / HH WA L L T O PLACE NE W C O ND U I T/ F I BE R BORE D E TA I L S: P LA C ED 6 ' F R OM BO C BORE D E PT H : 3 6 " BORE L O CA T IO N : E X CH A NG E ROW/G A TE W AY RO W PA R TI A L EASEM E NT PLACINGBORE FR O M M H /H H 65 3 AC RO S S G A TE W AY DOWN TH E R O W O F E X CH A NG E 1 0 0 0 ' T O M E ET THE CUS T OM E RS EN T R AN CE C ON D UI T PLACI N G PLACE NE W 2' X 3 ' H A ND HOLE 5 ' FR OM B AC K O F CURB , L EA V E S LA C K IN HH SEE WO R K P R IN T # 2 SEE WO R K P R IN T #1 EXCHAN G E C I R 7 0 ' RO W 36"PROPOSE D 1 12" HDPE CON D U I T EXCHA NG E C IR BO R E P RO F I LE BORE DE T A IL S : P L AC E D 6 ' FR O M B OC BORE DE P TH : 36 " BORE LO C AT I ON : EX C HA N GE ROW/GA T EW A Y R OW P AR T IA L EASEME N T PLACIN G MOUNT MD U IN M PO E R O OM PU L L TERMI N AL T A IL F RO M T H E B U IL D I NG 600' TO TH E SE R V IN G H A ND HO L E PLACINGPLACE N E W 2 X 3 H H A T CUSTOM E RS E NT R AN C E CONDUIT / NE W B O RE L OC A TI O N BORE T O E N D A T C U ST O ME R S C ON D U IT LOCAT I O N A T T H E B A SE OF T HE PO W ER P OL E 770 GA T EW A Y B L VDDEPTH TO BE FIEL D VERIFIE DENGR:PHONE:DRAWN DATE:SCALE:TAX DISTRICT:PROJECTNUMBER:C.O. AREA:EXCH. CODE:DWGOFCNTY:TWNSHP:RNG:SEC:FILE:910 EXCHANGE CIR. COPPELLPLACING/PERMIT5329873COPPELL7044303-24-23CASTONGUE9723185279DALLAS1=10012COPPELL UNITS / ACCT CODESPLACING2423.201 P58B2 EA2423.201 P59A1,150 FT2423.201 P43C1,800 FT2423.201 P77A1 EA2423.201 S72A1EAADDRESS:SERVICE TYPE:ASSIGNMENT:TEST:SPECIAL NOTES:dB @kHzCUSTOMER:ORDER #:ISSUED:DUE:STERLING TRANSPORTATIONPSR386112203-24-2305-09-23901 EXCHANGE CIRCOPPELL, TX. 75019500M ETHERNETF0046,59 910 Exchange Cir, Coppell, TX 75019, USAWWWWWWWWWWWWWWW70' EASEMENTPROPOSED NEW2'X3'HH PLACED ATCUSTOMERS CONDUITSEE WORK PRINT #1EXCHANGE CIR 70' ROW36"PROPOSED 1 12" HDPE CONDUITEXCHANGE CIR BORE PROFILEBORE DETAILS: PLACED 6' FROM BOCBORE DEPTH: 36"BORE LOCATION: EXCHANGEROW/GATEWAY ROW PARTIALEASEMENTPLACINGMOUNT MDU IN MPOE ROOM PULLTERMINAL TAIL FROM THE BUILDING600' TO THE SERVING HAND HOLEPLACINGPLACE NEW 2X3 HH ATCUSTOMERS ENTRANCECONDUIT/ NEW BORE LOCATIONBORE TO END AT CUSTOMERS CONDUITLOCATION AT THE BASE OF THE POWER POLE770 GATEWAY BLVD910 Exc h a ng e C i r , C o pp e l l , T X 7 5 01 9 , U S A F0041 400F02 F02 F02 F01 F02 1 1 1 1 1 50 710 GAT E WA Y B L V D 750 GA T EW AY B LV D 770 GA T EW A Y B LV D MH653 MH652 16" WATE R LINE 6" WATERLINE 10" SE W ER LINE SEWE R MH 21" SEW E R L I NE 33" SEW E R L I NE 12" WAT E R LINE 10' UTIL I T Y EASEM E NT 20' UTI L I TY EASEM E NT PROPOS E D N EW B OR E P L AC I N G 1 12" HDPE CO ND U I T T O P L AC E F IB E R R.O.W. R.O.W.70'70' EASEM E NT PROPOS E D N EW 2'X3'HH P L AC E D A T CUSTOM E RS C ON DU I T PROPOS E D N EW B OR E T O BE P LA C ED 8 ' F R OM BACK OF CU R B I N TH E 70 ' UT I L I TY E AS EM E N T R.O.W.B.O.C.EXCHANG E CI R 70 ' RO W36"PROPOSED 1 12" HDPE C O ND U I T CITY SEW E R L I N E 33 " D EP T H UN K NO W N MAINTAI N M IN 2 4 " SEPARA T I O N EXCHAN G E C I R B OR E PR O FI L E GATEW A Y D R 7 0 ' RO WPROPOSED 1 12" HDPE C O N DU I T ( 48 F ) 36" 36"10" CITYSEWER L I N E MAINTAIN M I N 24 " SEPARATIO N MAINTAIN M I N 24 " SEPARATIO N 36" SEWE RLINE 36" CITYSEWER LINE 16" WAT E R L IN E DEPTH TOBE FIELDVERIFIED DEPTH TOBE FIELDVERIFIED PLACIN G CORE D R IL L MH / HH WA L L T O PLACE N EW CO N DU I T /F I B ER BORE D E TA I L S: P LA C ED 6 ' F R OM BO C BORE D E PT H : 36 " BORE L O CA T I ON : EX C HA NG E ROW/GA T EW AY R OW PA R T IA L EASEME N T PLACINGBORE FR O M M H /H H 65 3 AC R OS S G A TE W AYDOWN TH E RO W O F E X CH A NG E 10 0 0 ' T O M E ETTHE CUS T OM E RS E NT R AN C E C ON D U IT PLACIN G PLACE N EW 2 'X 3 ' H A ND HOLE 5 ' FR O M B AC K OF CURB, L EA V E S L AC K IN HH SEE WOR K P R I NT # 2 SEE WO R K P R IN T #1EXCHANG E C I R 70 ' RO W36"PROPOSED 1 12" HDPE C O ND U I T EXCHA N GE C IR BO R E P R OF I L E BORE DE T A IL S : P L AC E D 6 ' FR O M B OCBORE DE P TH : 3 6"BORE LO C AT I O N: E XC H AN G EROW/GAT E WA Y R O W P AR T I ALEASEMEN T PLACIN G MOUNT M DU I N M PO E RO OM P UL L TERMIN A L T A IL F RO M T H E B U IL D I NG 600' TO T HE S ER V IN G H A ND H OL EPLACINGPLACE N E W 2 X 3 H H A TCUSTOME R S E NT R AN C ECONDUIT / NE W BO RE L OC A T IO N BORE T O E N D A T CU S TO ME R S C O ND U IT LOCATI O N A T T H E B A SE O F T HE P OW ER P OL E 770 GAT E WA Y B L VD DEPTH T O BE FIELDVERIFIE DENGR:PHONE:DRAWN DATE:SCALE:TAX DISTRICT:PROJECTNUMBER:C.O. AREA:EXCH. CODE:DWGOFCNTY:TWNSHP:RNG:SEC:FILE:910 EXCHANGE CIR. COPPELLPLACING/PERMIT5329873COPPELL7044303-24-23CASTONGUE9723185279DALLAS1=10022COPPELL UNITS / ACCT CODESPLACING2423.201 P58B2 EA2423.201 P59A1,150 FT2423.201 P43C1,800 FT2423.201 P77A1 EA2423.201 S72A1EAADDRESS:SERVICE TYPE:ASSIGNMENT:TEST:SPECIAL NOTES:dB @kHzCUSTOMER:ORDER #:ISSUED:DUE:STERLING TRANSPORTATIONPSR386112203-24-2305-09-23901 EXCHANGE CIRCOPPELL, TX. 75019500M ETHERNETF0046,59