Loading...
WA0101-CS011220BIRKHOFF, HENDRICKS & CONWAY, L.L.P. CONSULTING ENGINEERS 7502 Greenville Ave., Suite 220 Dallas, Texas 75231 Fax (214) 361-0204 Phone (214) 361-7900 MEMORANDUM ,, To: Ms. Suzan C. Taylor, C.I.P. Coordinator City of Coppell Post Office Box 478 Coppell, Texas 75019 From: Gary C. Hendricks, P.E. Date: December 20, 2001 Subject: S.H. 121 Water Line SuzarE As you requested, we are enclosing three additional originals of page 4 of our letter agreement for engineering services on the S.H. 121 Water Line Project. These sets are for your use. You also requested we provide you with a proposed schedule for the design phase of the project: Weeks Task DescriptionI 1 4 5 6 7 8 9 10 11 12 Project Initiation and collection of pertinent data (City of Coppell, TxDOT & Utility Companies)__ l Field Surveys Initial design, preliminary alignment and grades City Review Final alignment determinations Additional field surveys (as required) Final plans, quantities and specifications Final City Review Please note this schedule assumes the water line is located within the rights of way of S.H. 121 and Spur 553. If the project alignment must be relocated into adjacent private property, then additional time will be required for: 1. Coordinating permission to survey on private properties 2. Alignment coordination with property owners 3. Preparation of plats and field notes for easements 4. Acquisition of easements