Coppell Trade Ctr-PT230807Page 1 of 3CONS23-07-028780
CONSTRUCTION DEVELOPMENT PERMIT
Name of Applicant Date SubmittedPuravida Contracting, LLC 7/26/2023
Address of Applicant 101 W Renner Road 290, Richardson, TX 75082
Phone Number Email4696260655 jason@puravidacon.com
Project Name
Description Repair of approach for entrance off of 820 Sandy Lake Road.
Location of Construction 820 W SANDY LAKE RD, Coppell, TX 75019
Subdivision AcreageCOPPELL TRADE CENTER 41
Section Block Lot1 1R3
Location Description 820 W Sandy Lake Road Coppell, Texas 75019 - Western Driveway off of Sandy Lake Rd
1. Type of proposed construction or development:
Non-Residential
2. Description of Construction Permit requested:
: Drive Approach
Provide an attachment containing the name and 24-hr. contact phone number
of supervisor(s) for every contractor working under this general permit.
3. All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision
Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The
contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance.
Amount Due: $665.26 Date Paid: 8/2/2023
> Any work requiring closure of a lane of traffic, street, or alley must be approved in advance by the
Engineering Dept., with notification to the following prior to closure:
Police Department @ 972-304-3600
Fire Department @ 972-304-3512
Street Department @ 972-462-5150
Engineering Dept. @ 972-304-3679
NOTE: Street closures are allowed from 9:00 a.m. until 3:30 p.m. ONLY
unless otherwise approved by City Engineer.
> Provide barricade plan / trench safety plan of a lane or street closure. (Required)
> It is a requirement of this permit that As-Built Drawings be turned in at the end of this project.
As-Builts consist of a .pdf and CD with Autocad .dwg files.
Printing your name indicates your acceptance of the terms and conditions of this form:
Page 2 of 3CONS23-07-028780
Jason Burgess
Signature of Applicant Contact Number
4696260655
Signature of Inspector Contact Number
NoIs the fill area located in an identified flood hazard area?
FOR CITY USE ONLY
If YES, a Floodplan Development Permit is required before any construction can begin.
Has a Floodplain Development Permit been issued?No
City Approval Date
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or
cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking,
excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is
granted.
Page 3 of 3CONS23-07-028780
INSPECTION FEE CALCULATION SHEET
Project Name Date 8/4/2023
As per the City of Coppell Subdivision Regulations, the Developer shall pay 4% of the cost of the items to be permitted and
inspected by the Engineering Department and dedicated to the City. The Developer shall pay 3% of the items to be inspected
by the Engineering Department, but not dedicated to the City such as parking lots, private utilities, private drainage systems
and so forth. Inspection fees are due on or before the date of the Pre-construction Meeting.
The fees shown below have been calculated based on the development contract or cost estimate provided by the
developer.
Paving
Grading
Water
Sanitary Sewer
Storm Sewer
Alleys
Sidewalks
Other
PUBLIC IMPROVEMENTS
CONTRACT AMOUNT
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
X 4% =
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$22,175.21
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
X 3% =
$665.26
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total $0.00 $0.00 $22,175.21 $665.26
PRIVATE IMPROVEMENTS
CONTRACT AMOUNT
Grand Total (total of
both colored fields)$665.26