Cotton Belt-PN230920CITY:
CONTRACTOR:
JOB NAME:
NOTESSALESMAN EXECUTIVE
TCP DESIGNER
LEGEND
SCOPE OF WORK:
LOCATION:
CONTACT NUMBER:
CONTACT:
DATE:Reedie Lea
THIS PLAN IS FOR ILLUSTRATIVE PURPOSES ONLY AND
IS NOT INTENDED TO RELIEVE THE CONTRACTOR FROM
THE REQUIREMENTS SET FORTH BY RELATED CONTRACT
DOCUMENTS, THE TEXAS MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (MUTCD) OR THE OVERALL
RESPONSIBILITY TO TRAFFIC CONTROL SAFETY.
All Traffic Control Plans (TCPs) are the property of Buyers
Barricades, Inc. and are included with Buyers Barricades
rental agreements. Traffic Control Plans issued without a
rental agreement will be charged to the customer.
N
EW
S
DART Silverline
Coppell
Fairway Dr & Belt Line Rd at Crossing
Archer Western Herzog
One Way Closure
469-346-6620
07/25/2023
Bryan Giron MatchlineMatchlineCENTER
LANE
CLOSEDCW20-5CROAD
WORK
AHEADCW20-1DCW20-5RRIGHT
LANE
CLOSED
TURN
LANE
CLOSEDCW20-5TEND
ROAD WORK
G20-2
END
ROAD WORK
G20-2
ROAD
WORK
AHEADCW20-1DTURN
LANE
CLOSEDCW20-5TCW20-5RRIGHT
LANE
CLOSED
DETOUR
AHEADCW20-2DDETOUR
AHEADCW20-2DROAD
WORK
AHEADCW20-1DEND
ROAD WORK
G20-2
ROAD
WORK
AHEADCW20-1DEND
ROAD WORK
G20-2
120ft400ft 90ft
Work
Zone
600ft
Taper
240ft
Buffer
150ft
Work
Zone
400ft400ft400ft
400ft400ft
400ft 400ft
180ft
Buffer
80ft
Buffer
Belt Line Rd
Belt Line Rd
Fairway DrDevices spaced on 40ft centers
Posted speed limit 50MPH
Phase 1Cole Benton
Navigator
Type 3 Barricade
ROAD
CLOSED
TYPE III
R11-2 / CW1-7
Sheet 1
CITY:
CONTRACTOR:
JOB NAME:
NOTESSALESMAN EXECUTIVE
TCP DESIGNER
LEGEND
SCOPE OF WORK:
LOCATION:
CONTACT NUMBER:
CONTACT:
DATE:Reedie Lea
THIS PLAN IS FOR ILLUSTRATIVE PURPOSES ONLY AND
IS NOT INTENDED TO RELIEVE THE CONTRACTOR FROM
THE REQUIREMENTS SET FORTH BY RELATED CONTRACT
DOCUMENTS, THE TEXAS MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (MUTCD) OR THE OVERALL
RESPONSIBILITY TO TRAFFIC CONTROL SAFETY.
All Traffic Control Plans (TCPs) are the property of Buyers
Barricades, Inc. and are included with Buyers Barricades
rental agreements. Traffic Control Plans issued without a
rental agreement will be charged to the customer.
N
EW
S
DART Silverline
Coppell
Fairway Dr & Belt Line Rd at Crossing
Archer Western Herzog
One Way Closure
469-346-6620
07/25/2023
Bryan Giron
Devices spaced on 40ft centers
Posted speed limit 50MPH
Phase 1Cole Benton
Navigator
Type 3 Barricade
Sheet 2M4-9LM4-9L
M4-9LM4-
9
R
M4-9RM4-9
L
M4-9R
CITY:
CONTRACTOR:
JOB NAME:
NOTESSALESMAN EXECUTIVE
TCP DESIGNER
LEGEND
SCOPE OF WORK:
LOCATION:
CONTACT NUMBER:
CONTACT:
DATE:Reedie Lea
THIS PLAN IS FOR ILLUSTRATIVE PURPOSES ONLY AND
IS NOT INTENDED TO RELIEVE THE CONTRACTOR FROM
THE REQUIREMENTS SET FORTH BY RELATED CONTRACT
DOCUMENTS, THE TEXAS MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (MUTCD) OR THE OVERALL
RESPONSIBILITY TO TRAFFIC CONTROL SAFETY.
All Traffic Control Plans (TCPs) are the property of Buyers
Barricades, Inc. and are included with Buyers Barricades
rental agreements. Traffic Control Plans issued without a
rental agreement will be charged to the customer.
N
EW
S
DART Silverline
Coppell
Fairway Dr & Belt Line Rd at Crossing
Archer Western Herzog
One Way Closure
469-346-6620
07/25/2023
Bryan Giron MatchlineMatchlineCW20-5RRIGHT
LANE
CLOSED
END
ROAD WORK
G20-2
END
ROAD WORK
G20-2
ROAD
WORK
AHEADCW20-1DCW20-5RRIGHT
LANE
CLOSED
ROAD
WORK
AHEADCW20-1DEND
ROAD WORK
G20-2 120ft90ft
Work
Zone
600ft
Taper
240ft
Buffer
150ft
Work
Zone
400ft
400ft400ft
400ft
Belt Line Rd
Belt Line Rd
Fairway DrDevices spaced on 40ft centers
Posted speed limit 50MPH
Phase 2Cole Benton
Navigator
Type 3 Barricade
Sheet 1
ROAD
CLOSED
AHEADCW20-3DROAD
WORK
AHEADCW20-1DEND
ROAD WORK
G20-2
DETOUR
AHEADCW20-2DDETOUR
AHEADCW20-2DROAD
WORK
AHEADCW20-1DEND
ROAD WORK
G20-2
ROAD CLOSEDTOTHRU TRAFFIC120ft
120ft
120ft
120ft
ROAD
WORK
AHEADCW20-1DTYPE III R11-2ROADCLOSEDRiverchas
e
D
r
CITY:
CONTRACTOR:
JOB NAME:
NOTESSALESMAN EXECUTIVE
TCP DESIGNER
LEGEND
SCOPE OF WORK:
LOCATION:
CONTACT NUMBER:
CONTACT:
DATE:Reedie Lea
THIS PLAN IS FOR ILLUSTRATIVE PURPOSES ONLY AND
IS NOT INTENDED TO RELIEVE THE CONTRACTOR FROM
THE REQUIREMENTS SET FORTH BY RELATED CONTRACT
DOCUMENTS, THE TEXAS MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (MUTCD) OR THE OVERALL
RESPONSIBILITY TO TRAFFIC CONTROL SAFETY.
All Traffic Control Plans (TCPs) are the property of Buyers
Barricades, Inc. and are included with Buyers Barricades
rental agreements. Traffic Control Plans issued without a
rental agreement will be charged to the customer.
N
EW
S
DART Silverline
Coppell
Fairway Dr & Belt Line Rd at Crossing
Archer Western Herzog
One Way Closure
469-346-6620
07/25/2023
Bryan Giron
Devices spaced on 40ft centers
Posted speed limit 50MPH
Phase 2Cole Benton
Navigator
Type 3 Barricade
Sheet 2
M4
-
9
LM4-9LM4-9SM4-9LM4-9L
Type 1 Type 2 Type 3 ADA
Phase 1
Sheet 1
Hamilton Duffy, PC
Consulting
Tex Reg F-5260
90ft
Buffer120ft 245ft
Taper
320ft
Taper
155ft
Buffer240ft
400ft
350ft
Buffer
720ft
Taper
780ft
Taper
Arrow
Board
MB
Part A
50ft
Work
Zone
100ft
Work
Zone
150ft
Work
Zone
200ft
Work
Zone
250ft
Work
Zone
300ft
Work
Zone
350ft
Work
Zone
400ft
Work
Zone
450ft
Work
Zone
500ft
Work
Zone
1000ft
Work
Zone
1500ft
Work
Zone
RIGHT LANE
MUST EXIT
R3-33R
ONLYONLY
STOP
HERE ON
RED
ONLYONLYONLYONLYONLYONLY
ONLY
Navigator
ONLYONLY
ONLY
ONLYONLYONLYONLY
ONLYONLY
Navigator
Type 3 Barricade
Navigator
Type 3 Barricade
Type 1 Barricade
Navigators
Type 3 Barricade
2-Way Traffic
Vertical Panel
Type 3 Barricade
Barrels
Type 3 Barricade
Barrels
Type 3 Barricade
2-Way Traffic
Vertical Panel
Barrels
Type 3 Barricade
Type 1 Barricade
Navigator
Type 3 Barricade
Type 2 Barricade
Type 1 Barricade
Barrels
Type 3 Barricade
Type 2 Barricade
Type 1 Barricade
Navigator
Type 3 Barricade
Type 2 Barricade
Barrels
Type 3 Barricade
Type 2 Barricade
ONLY
ROAD CLOSED
TO
THRU TRAFFIC
TYPE III
R11-2
ROAD
CLOSED
ROAD CLOSED
TO
THRU TRAFFIC
ROAD
CLOSED
TYPE III
R11-2 / CW1-7
ROAD
CLOSED
DETOUR
TYPE III
R11-2 / M4-10R
ROAD
CLOSED
DETOUR
TYPE III
R11-2 / M4-10L
DETOUR
TYPE III
R11-4 / M4-10R
ROAD CLOSED
TO
THRU TRAFFIC
DETOUR
TYPE III
R11-4 / M4-10L
ROAD CLOSED
TO
THRU TRAFFIC
RAMP
CLOSED
ROAD
CLOSED
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
100ft
Taper
100ft
Buffer
90ft
Shifting
Taper 100ft
1000ft 1600ft
85ft
SIDEWALK
CLOSED
600ft
Taper
240ft
Buffer
180ft
Taper
540ft
Taper
660ft
Taper
160ft
320ft
120ft
Buffer
195ft
Buffer
295ft
Buffer 500ft
700ft410ft
Buffer
900ft
600ft
800ft 475ft
Buffer
840ft
Taper
900ft
Taper
540ft
Buffer
N
EW
S
xxft
Shoulder
Taper
Devices spaced on 35ft centers
Posted speed limit 45MPH
Devices spaced on 25ft centers
Posted speed limit 35MPH
Devices spaced on 30ft centers
Posted speed limit 40MP H
Devices spaced on 40ft centers
Posted speed limit 50MPH
Devices spaced on 20ft centers
Posted speed limit 30MPH
Devices spaced on 45ft centers
Posted speed limit 55MPH
Devices spaced on 50ft centers
Posted speed limit 60MPH
Devices spaced on 55ft centers
Posted speed limit 65MPH
Devices spaced on 60ft centers
Posted speed limit 70MPH
Devices spaced on 65ft centers
Posted speed limit 75MPH
Devices spaced on 70ft centers
Posted speed limit 80MPH
KEEP
RIGHT
RIGHT LANE
MUST
TURN RIGHT
R3-7R
LEFT LANE
MUST
TURN LEFT
R3-7L
SIDEWALK CLOSED
USE OTHER SIDE
NOTE: Plan design based on engineered stamped plans provided by Contractor may not conform to TXDOT/MUTCD standards.
Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control.
Type 2 Barricade
Navigators
Type 3 Barricade
Water Barrier
Type 1 Barricade
Barrels
Type 3 Barricade
Water Barrier
Navigators
Type 3 Barricade
Flagger w/Cones
Barrels
Type 3 Barricade
Flagger w/Cones
NOTE: Plan requested by Contractor may not conform to TXDOT/MUTCD standards.
Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control.
ALLEY CLOSED
TO
THRU TRAFFIC
TYPE III
R11-2
ALLEY
CLOSED
ROAD CLOSED
TO
THRU TRAFFIC
SIDEWALK CLOSED USE OTHER SIDE
TO BE PLACED AT
DO
NOT
PASS
DO
NOT
DRIVE
ON
SHOULDER
Barrels
SIDEWALK
CLOSED
MatchlineStreet NameALL
TRAFFIC
MUST
EXIT
2600ftPRELIMINARY
FOR REVIEW ONLY
PE NO. DATE
KEITH M. HAMILTON 87384 XX/XX/2023
xx
YOUR SPEED
XX
Radar
Trailer
MB
SZ
Q-Lynx
MatchlineSIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK
CLOSED
Rumble Strips
Crash Truck/TMA
Water Barrier
Concrete Barrier
***
***
ROADWORKAHEADCW20-1DCW20-5RRIGHTLANECLOSED CW20-5DLLEFTLANECLOSEDAHEAD RIGHTLANECLOSEDAHEADCW20-5DRTURNLANECLOSEDCW20-5TCENTERLANECLOSEDCW20-5CROADCLOSEDAHEADCW20-3DDETOURAHEADCW20-2DONE LANEROADAHEADCW20-4DBEPREPAREDTOSTOPCW3-4CW20-7LANE ENDSMERGERIGHTCW9-2TRLANE ENDSMERGELEFTCW9-2TL2RIGHT LANESCLOSEDCW20-5aTRSHOULDERWORKCW21-5ROADNARROWSCW5-1TRUCKSENTERINGROADWAYCW27-1TCW3-2CW4-3RCW4-3LCW21-1aT CW1-4LCW1-4RCW6-3CW12-1CW12-1CW12-1ENDROAD WORKG20-2ENDROAD WORKG20-2CW20-5LLEFTLANECLOSEDTOONCOMINGTRAFFICR1-2YIELDR1-2 APSTOPR1-1 R5-1YIELDR1-2WRONGWAYR5-1a ONE WAYR6-1L ONE WAYR6-1RCW1-7DETOURM4-10L DETOURM4-10R ROADCLOSEDR11-2R11-3ROAD CLOSEDAHEADLOCAL TRAFFIC ONLYROAD CLOSEDTOTHRU TRAFFICR11-4****LOOSEGRAVELCW8-7FRESHOILCW21-2TURNLANECLOSEDAHEADCW20-5DTCENTERLANECLOSEDAHEADCW20-5DCCW28-1TPOWER LINESCW23-2NEWTRAFFICPATTERNAHEADUTILITYWORKAHEADCW21-7DWORK ZONExx M4-9SM4-9L M4-9RR3-2R3-1 PR8-3R5-2R3-4INTERSTATETEXAS**ONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LCONSTRUCTIONENTRANCE**M4-9RM4-9L RAMPCLOSEDAHEADCW20-3DSLOW ALLEYCLOSEDAHEAD2RIGHT LANESCLOSED1/2 MILECW20-5aTR2LEFT LANESCLOSEDCW20-5aTLSPECIALEVENTAHEAD ENDWORK ZONEG20-2ENDWORK ZONEG20-2CW3-3CW3-1FRWYCLOSEDAHEADCW20FY-3D CW1-4bL CW1-4bRTORAMPR1-2YIELD
CROSSWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
CROSSWALK
CLOSED
CROSSWALK CLOSED
USE OTHER SIDE
CITY:
CONTRACTOR:
JOB NAME:
NOTESSALESMAN EXECUTIVE
TCP DESIGNER
LEGEND
SCOPE OF WORK:
LOCATION:
CONTACT NUMBER:
CONTACT:
DATE:Reedie Lea
THIS PLAN IS FOR ILLUSTRATIVE PURPOSES ONLY AND
IS NOT INTENDED TO RELIEVE THE CONTRACTOR FROM
THE REQUIREMENTS SET FORTH BY RELATED CONTRACT
DOCUMENTS, THE TEXAS MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (MUTCD) OR THE OVERALL
RESPONSIBILITY TO TRAFFIC CONTROL SAFETY.
All Traffic Control Plans (TCPs) are the property of Buyers
Barricades, Inc. and are included with Buyers Barricades
rental agreements. Traffic Control Plans issued without a
rental agreement will be charged to the customer.
Fencing
Street Name
ONLYONLY
Water Barrier w/Fence
ADA Pedestrian Barricade
xx
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK
CLOSED
SIDEWALK CLOSED
USE OTHER SIDE
ROADWORK1 MILECW20-1Fxxxx
ONLYONLY
Gate
POLICE
XXXXXXXXXXX CLOSEDBIKE LANExxMPH
BEGIN
ONE
WAY
DETOUR
C S
Navigator w/Lights CW20-5RRIGHT
LANE
CLOSED
1/2 MILE CW20-5RRIGHT
LANE
CLOSED
1000ft CW20-5LLEFT
LANE
CLOSED
1/2 MILE CW20-5LLEFT
LANE
CLOSED
1000ft
2
RIGHT LANES
CLOSEDCW20-5aTR1000ft
2
LEFT LANES
CLOSEDCW20-5aTL1000ft
2
RIGHT LANES
CLOSEDCW20-5aTR1/2 MILE
2
LEFT LANES
CLOSEDCW20-5aTL1/2 MILE
1000ft
1/2 MILE
RAMP
CLOSED
AHEADCW20-3D1000ft
RAMP
CLOSED
AHEADCW20-3D1/2 MILE
THRUTRAFFICMERGERIGHTCW4-1ATRTHRUTRAFFICMERGELEFTCW4-1ATLxxCW3-5BUMPCW8-1R9-3 RUMBLESTRIPSAHEADCW17-2TLEFT LANE
MUST EXIT
R3-33L
N
EW
S
DART Silverline
Coppell
Fairway Dr & Belt Line Rd at Crossing
Archer Western Herzog
Road Closure
469-346-6620
08/28/2023
Bryan Giron
Matchline
Flashing Electronic
Arrow Board
Flashing Electronic
Arrow Board
Flashing Electronic
Arrow Board
ROAD
WORK
1 MILECW20-1FROAD
WORK
AHEADCW20-1D30 180 90 120
Speed Taper Buffer Sign
Spacing
35
40
45
50
245
320
540
600
120
155
195
240
160
240
320
400
55 660 295 500
60 720 350 600
65 780 410 700
70 840 475 800
75 900 540 900
Special RulesPlano-Double-up Signs-Add General NotesDallas-Intersections Count As Buffer-No “End Road Work”
Fort Worth
-Arrow Board 40MPH+
Richardson
-Sign Sequence (RWA, LCA, LEML/R)
2L Rule-On freeways, FIRST buffer length shall be 2x the length of the Taper fordouble lane closures.
“Diamond” rule for Crossovers
-On the diamonds made to push traffic back over from a 2-way application,
the spacing is to be a 1/2L taper length
1/2L
-”1 Block Rule”
-First Buffer length shall be 2x the length of the Taper for
double lane closures.
Carrollton
-ADA Pedestrian Barricades for sidewalk closures
San Antonio/Austin/Surrounding Areas
-TMAs on all TxDOT plans
- Barrels for sidewalk closures
-Double up signs on TxDot plans
-On freeways, FIRST and SECOND buffer length shall be 2x the length of the Taper for Triple lane closures.Freeway Closure Rule-TMAs to be placed after Type IIIs NTE - LBJ-Flags on “Road Work” signs
Austin
-Must be drawn in black and white
-Arrow Board on all lane closures
Houston
-Arrow Board on all lane closures Downtown
General Notes:
1.Lane Closure from 8.30am - 4.00pm only.
2.Lane shall be open in non-working hours by removing (or turn down)
all lane closure signs (e.g 'Right Lane closed' sign)
Garland
-Double-up Signs
-Add General Notes
-”1 Block Rule”
City of Plano Traffic Control Plan General Notes (rev. 04-18-2022): 1.Contractor shall be responsible to maintain traffic control as set forth in the Texas Manual on Uniform Traffic Control Devices (TMUTCD) for Streets and Highways, particularly Part 6 – Temporary Traffic Control, and according to any notes provided on the TCP by the City engineer. 2.Lanes may be closed to traffic during 9 AM-4 PM only. Lane closures outside this time window require separate approval. 3.ADA compliant accessible pedestrian routes shall be maintained at all times. 4.Temporary Traffic Control (TTC) devices (cones, signs, barricades) shall only be in place or visible during times while work is in progress. When possible, unnecessary or incorrect devices for the implemented work zone shall be
removed or covered as the work zone changes.
5.Contractor shall contact the City of Plano Project Manager or the Traffic Management Center (972) 941-7289
at least one week prior to lane closing if work is to occur within 100' of a signalized intersection.
6.Any portion of a traffic control plan on an approach to a signalized intersection within 200' of the intersection must
have a maximum traffic control device spacing of 20'.
7.Contactor shall coordinate with the owner or related entity regarding lane closures on any private right of way
(ROW) or street. Contractor shall follow the TMUTCD guidelines during lane closures.
8.Contractor shall coordinate with respective schools regarding any lane closures near or within a school zone.
9.Contractor shall contact any related public transportation agency or DART if lane closures involve, or are near, a
public transportation facility, including Bus Stops.
10.Contractor shall notify homeowners with alley access one week prior to alley closing.
11.Contractor shall contact the City Environmental Waste Services Department and coordinate the work so as to
not interrupt the trash pickup schedule.
12.Any excavation more than 2" below the road surface and within 10' of the open path of travel for vehicles will
require vertical panel or barrel delineation. Any excavation more than 24" below the road surface will require
positive lateral control barriers, such as water filled barricades or concrete barriers. Positive lateral control barriers
must be compliant in design and installation with TxDOT Standards 8-01 "Treatment for various edge conditions".
Houston BRANCH
_TMA on all TxDOT TCPs CW1-3R CW1-3LG20-1bR NEXT MILESXXROAD WORKWHEN WORKERS ARE PRESENT WORK ZONETRAFFIC FINES DOUBLE TALK OR TEXT LATERSTAY ALERTG20-10TG20-1bL NEXT MILESXXROAD WORK NEXT MILESXXROAD WORK NEXT MILESXXWORK ZONExxROADWORKAHEADCW20-1DENDROAD WORKG20-2ENDWORK ZONEG20-2
Flagger w/Cones
2-Way Traffic
Vertical Panel
Project Limits SHARETHEROADBIKELANECLOSEDSHARETHEROAD
Chris Schreiner
Marie Rhom
Keith Hamilton
Tony Troxclair
Mike Moreno
Daniel Barron
Matt Sauer
Cole Benton
Michael Cooper
Devan Diviney
Cristian Martinez
Eric Putnam
Alex Thlang
Lauren Putnam
Cisco Meza
Cole Wilson
Chuy DeSantiago
Bianca Ortiz
Cristobal Olvera
Jose Negrete
Josh Aumiller
Jesse Barron
Cody Harvey
Justin LaRose
Russell Johnson
Roland Campa
Ronald Green
BEGINROAD WORKNEXT X MILESG20-TNAMEADDRESSCITYSTATECONTRACTORG20-6T
CENTER
LANE
CLOSEDCW20-5CROAD
WORK
AHEADCW20-1DTURN
LANE
CLOSEDCW20-5TEND
ROAD WORK
G20-2
END
ROAD WORK
G20-2
ROAD
WORK
AHEADCW20-1DTURN
LANE
CLOSEDCW20-5TDETOUR
AHEADCW20-2DDETOUR
AHEADCW20-2DROAD
WORK
AHEADCW20-1DEND
ROAD WORK
G20-2
400ft
150ft
Work
Zone
400ft400ft400ft
400ft400ft
180ft
Buffer
80ft
Buffer
Belt Line Rd Fairway DrDevices spaced on 40ft centers
Posted speed limit 50MPH
Phase 3Cole Benton
Navigator
Type 3 Barricade
Sheet 1
ROAD
WORK
AHEADCW20-1DEND
ROAD WORK
G20-2
DETOUR
AHEADCW20-2DDETOUR
AHEADCW20-2DROAD
WORK
AHEADCW20-1DEND
ROAD WORK
G20-2
ROAD CLOSEDTOTHRU TRAFFIC120ft
120ft
120ft
120ft
Riverchas
e
D
r
120ftROAD
CLOSED
AHEADCW20-3DTYPE III R11-2ROADCLOSEDROAD
CLOSED
TYPE III
R11-2 / CW1-7
Type 1 Type 2 Type 3 ADA
Phase 1
Sheet 1
Hamilton Duffy, PC
Consulting
Tex Reg F-5260
90ft
Buffer120ft 245ft
Taper
320ft
Taper
155ft
Buffer240ft
400ft
350ft
Buffer
720ft
Taper
780ft
Taper
Arrow
Board
MB
Part A
50ft
Work
Zone
100ft
Work
Zone
150ft
Work
Zone
200ft
Work
Zone
250ft
Work
Zone
300ft
Work
Zone
350ft
Work
Zone
400ft
Work
Zone
450ft
Work
Zone
500ft
Work
Zone
1000ft
Work
Zone
1500ft
Work
Zone
RIGHT LANE
MUST EXIT
R3-33R
ONLYONLY
STOP
HERE ON
RED
ONLYONLYONLYONLYONLYONLY
ONLY
Navigator
ONLYONLY
ONLY
ONLYONLYONLYONLY
ONLYONLY
Navigator
Type 3 Barricade
Navigator
Type 3 Barricade
Type 1 Barricade
Navigators
Type 3 Barricade
2-Way Traffic
Vertical Panel
Type 3 Barricade
Barrels
Type 3 Barricade
Barrels
Type 3 Barricade
2-Way Traffic
Vertical Panel
Barrels
Type 3 Barricade
Type 1 Barricade
Navigator
Type 3 Barricade
Type 2 Barricade
Type 1 Barricade
Barrels
Type 3 Barricade
Type 2 Barricade
Type 1 Barricade
Navigator
Type 3 Barricade
Type 2 Barricade
Barrels
Type 3 Barricade
Type 2 Barricade
ONLY
ROAD CLOSED
TO
THRU TRAFFIC
TYPE III
R11-2
ROAD
CLOSED
ROAD CLOSED
TO
THRU TRAFFIC
ROAD
CLOSED
TYPE III
R11-2 / CW1-7
ROAD
CLOSED
DETOUR
TYPE III
R11-2 / M4-10R
ROAD
CLOSED
DETOUR
TYPE III
R11-2 / M4-10L
DETOUR
TYPE III
R11-4 / M4-10R
ROAD CLOSED
TO
THRU TRAFFIC
DETOUR
TYPE III
R11-4 / M4-10L
ROAD CLOSED
TO
THRU TRAFFIC
RAMP
CLOSED
ROAD
CLOSED
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
100ft
Taper
100ft
Buffer
90ft
Shifting
Taper 100ft
1000ft 1600ft
85ft
SIDEWALK
CLOSED
600ft
Taper
240ft
Buffer
180ft
Taper
540ft
Taper
660ft
Taper
160ft
320ft
120ft
Buffer
195ft
Buffer
295ft
Buffer 500ft
700ft410ft
Buffer
900ft
600ft
800ft 475ft
Buffer
840ft
Taper
900ft
Taper
540ft
Buffer
N
EW
S
xxft
Shoulder
Taper
Devices spaced on 35ft centers
Posted speed limit 45MPH
Devices spaced on 25ft centers
Posted speed limit 35MPH
Devices spaced on 30ft centers
Posted speed limit 40MP H
Devices spaced on 40ft centers
Posted speed limit 50MPH
Devices spaced on 20ft centers
Posted speed limit 30MPH
Devices spaced on 45ft centers
Posted speed limit 55MPH
Devices spaced on 50ft centers
Posted speed limit 60MPH
Devices spaced on 55ft centers
Posted speed limit 65MPH
Devices spaced on 60ft centers
Posted speed limit 70MPH
Devices spaced on 65ft centers
Posted speed limit 75MPH
Devices spaced on 70ft centers
Posted speed limit 80MPH
KEEP
RIGHT
RIGHT LANE
MUST
TURN RIGHT
R3-7R
LEFT LANE
MUST
TURN LEFT
R3-7L
SIDEWALK CLOSED
USE OTHER SIDE
NOTE: Plan design based on engineered stamped plans provided by Contractor may not conform to TXDOT/MUTCD standards.
Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control.
Type 2 Barricade
Navigators
Type 3 Barricade
Water Barrier
Type 1 Barricade
Barrels
Type 3 Barricade
Water Barrier
Navigators
Type 3 Barricade
Flagger w/Cones
Barrels
Type 3 Barricade
Flagger w/Cones
NOTE: Plan requested by Contractor may not conform to TXDOT/MUTCD standards.
Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control.
ALLEY CLOSED
TO
THRU TRAFFIC
TYPE III
R11-2
ALLEY
CLOSED
ROAD CLOSED
TO
THRU TRAFFIC
SIDEWALK CLOSED USE OTHER SIDE
TO BE PLACED AT
DO
NOT
PASS
DO
NOT
DRIVE
ON
SHOULDER
Barrels
SIDEWALK
CLOSED
MatchlineStreet NameALL
TRAFFIC
MUST
EXIT
2600ftPRELIMINARY
FOR REVIEW ONLY
PE NO. DATE
KEITH M. HAMILTON 87384 XX/XX/2023
xx
YOUR SPEED
XX
Radar
Trailer
MB
SZ
Q-Lynx
MatchlineSIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK
CLOSED
Rumble Strips
Crash Truck/TMA
Water Barrier
Concrete Barrier
***
***
ROADWORKAHEADCW20-1DCW20-5RRIGHTLANECLOSED CW20-5DLLEFTLANECLOSEDAHEAD RIGHTLANECLOSEDAHEADCW20-5DRTURNLANECLOSEDCW20-5TCENTERLANECLOSEDCW20-5CROADCLOSEDAHEADCW20-3DDETOURAHEADCW20-2DONE LANEROADAHEADCW20-4DBEPREPAREDTOSTOPCW3-4CW20-7LANE ENDSMERGERIGHTCW9-2TRLANE ENDSMERGELEFTCW9-2TL2RIGHT LANESCLOSEDCW20-5aTRSHOULDERWORKCW21-5ROADNARROWSCW5-1TRUCKSENTERINGROADWAYCW27-1TCW3-2CW4-3RCW4-3LCW21-1aT CW1-4LCW1-4RCW6-3CW12-1CW12-1CW12-1ENDROAD WORKG20-2ENDROAD WORKG20-2CW20-5LLEFTLANECLOSEDTOONCOMINGTRAFFICR1-2YIELDR1-2 APSTOPR1-1 R5-1YIELDR1-2WRONGWAYR5-1a ONE WAYR6-1L ONE WAYR6-1RCW1-7DETOURM4-10L DETOURM4-10R ROADCLOSEDR11-2R11-3ROAD CLOSEDAHEADLOCAL TRAFFIC ONLYROAD CLOSEDTOTHRU TRAFFICR11-4****LOOSEGRAVELCW8-7FRESHOILCW21-2TURNLANECLOSEDAHEADCW20-5DTCENTERLANECLOSEDAHEADCW20-5DCCW28-1TPOWER LINESCW23-2NEWTRAFFICPATTERNAHEADUTILITYWORKAHEADCW21-7DWORK ZONExx M4-9SM4-9L M4-9RR3-2R3-1 PR8-3R5-2R3-4INTERSTATETEXAS**ONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LCONSTRUCTIONENTRANCE**M4-9RM4-9L RAMPCLOSEDAHEADCW20-3DSLOW ALLEYCLOSEDAHEAD2RIGHT LANESCLOSED1/2 MILECW20-5aTR2LEFT LANESCLOSEDCW20-5aTLSPECIALEVENTAHEAD ENDWORK ZONEG20-2ENDWORK ZONEG20-2CW3-3CW3-1FRWYCLOSEDAHEADCW20FY-3D CW1-4bL CW1-4bRTORAMPR1-2YIELD
CROSSWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
CROSSWALK
CLOSED
CROSSWALK CLOSED
USE OTHER SIDE
CITY:
CONTRACTOR:
JOB NAME:
NOTESSALESMAN EXECUTIVE
TCP DESIGNER
LEGEND
SCOPE OF WORK:
LOCATION:
CONTACT NUMBER:
CONTACT:
DATE:Reedie Lea
THIS PLAN IS FOR ILLUSTRATIVE PURPOSES ONLY AND
IS NOT INTENDED TO RELIEVE THE CONTRACTOR FROM
THE REQUIREMENTS SET FORTH BY RELATED CONTRACT
DOCUMENTS, THE TEXAS MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (MUTCD) OR THE OVERALL
RESPONSIBILITY TO TRAFFIC CONTROL SAFETY.
All Traffic Control Plans (TCPs) are the property of Buyers
Barricades, Inc. and are included with Buyers Barricades
rental agreements. Traffic Control Plans issued without a
rental agreement will be charged to the customer.
Fencing
Street Name
ONLYONLY
Water Barrier w/Fence
ADA Pedestrian Barricade
xx
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK
CLOSED
SIDEWALK CLOSED
USE OTHER SIDE
ROADWORK1 MILECW20-1Fxxxx
ONLYONLY
Gate
POLICE
XXXXXXXXXXX CLOSEDBIKE LANExxMPH
BEGIN
ONE
WAY
DETOUR
C S
Navigator w/Lights CW20-5RRIGHT
LANE
CLOSED
1/2 MILE CW20-5RRIGHT
LANE
CLOSED
1000ft CW20-5LLEFT
LANE
CLOSED
1/2 MILE CW20-5LLEFT
LANE
CLOSED
1000ft
2
RIGHT LANES
CLOSEDCW20-5aTR1000ft
2
LEFT LANES
CLOSEDCW20-5aTL1000ft
2
RIGHT LANES
CLOSEDCW20-5aTR1/2 MILE
2
LEFT LANES
CLOSEDCW20-5aTL1/2 MILE
1000ft
1/2 MILE
RAMP
CLOSED
AHEADCW20-3D1000ft
RAMP
CLOSED
AHEADCW20-3D1/2 MILE
THRUTRAFFICMERGERIGHTCW4-1ATRTHRUTRAFFICMERGELEFTCW4-1ATLxxCW3-5BUMPCW8-1R9-3 RUMBLESTRIPSAHEADCW17-2TLEFT LANE
MUST EXIT
R3-33L
N
EW
S
DART Silverline
Coppell
Fairway Dr & Belt Line Rd at Crossing
Archer Western Herzog
Road Closure
469-346-6620
08/28/2023
Bryan Giron
Matchline
Flashing Electronic
Arrow Board
Flashing Electronic
Arrow Board
Flashing Electronic
Arrow Board
ROAD
WORK
1 MILECW20-1FROAD
WORK
AHEADCW20-1D30 180 90 120
Speed Taper Buffer Sign
Spacing
35
40
45
50
245
320
540
600
120
155
195
240
160
240
320
400
55 660 295 500
60 720 350 600
65 780 410 700
70 840 475 800
75 900 540 900
Special RulesPlano-Double-up Signs-Add General NotesDallas-Intersections Count As Buffer-No “End Road Work”
Fort Worth
-Arrow Board 40MPH+
Richardson
-Sign Sequence (RWA, LCA, LEML/R)
2L Rule-On freeways, FIRST buffer length shall be 2x the length of the Taper fordouble lane closures.
“Diamond” rule for Crossovers
-On the diamonds made to push traffic back over from a 2-way application,
the spacing is to be a 1/2L taper length
1/2L
-”1 Block Rule”
-First Buffer length shall be 2x the length of the Taper for
double lane closures.
Carrollton
-ADA Pedestrian Barricades for sidewalk closures
San Antonio/Austin/Surrounding Areas
-TMAs on all TxDOT plans
- Barrels for sidewalk closures
-Double up signs on TxDot plans
-On freeways, FIRST and SECOND buffer length shall be 2x the length of the Taper for Triple lane closures.Freeway Closure Rule-TMAs to be placed after Type IIIs NTE - LBJ-Flags on “Road Work” signs
Austin
-Must be drawn in black and white
-Arrow Board on all lane closures
Houston
-Arrow Board on all lane closures Downtown
General Notes:
1.Lane Closure from 8.30am - 4.00pm only.
2.Lane shall be open in non-working hours by removing (or turn down)
all lane closure signs (e.g 'Right Lane closed' sign)
Garland
-Double-up Signs
-Add General Notes
-”1 Block Rule”
City of Plano Traffic Control Plan General Notes (rev. 04-18-2022): 1.Contractor shall be responsible to maintain traffic control as set forth in the Texas Manual on Uniform Traffic Control Devices (TMUTCD) for Streets and Highways, particularly Part 6 – Temporary Traffic Control, and according to any notes provided on the TCP by the City engineer. 2.Lanes may be closed to traffic during 9 AM-4 PM only. Lane closures outside this time window require separate approval. 3.ADA compliant accessible pedestrian routes shall be maintained at all times. 4.Temporary Traffic Control (TTC) devices (cones, signs, barricades) shall only be in place or visible during times while work is in progress. When possible, unnecessary or incorrect devices for the implemented work zone shall be
removed or covered as the work zone changes.
5.Contractor shall contact the City of Plano Project Manager or the Traffic Management Center (972) 941-7289
at least one week prior to lane closing if work is to occur within 100' of a signalized intersection.
6.Any portion of a traffic control plan on an approach to a signalized intersection within 200' of the intersection must
have a maximum traffic control device spacing of 20'.
7.Contactor shall coordinate with the owner or related entity regarding lane closures on any private right of way
(ROW) or street. Contractor shall follow the TMUTCD guidelines during lane closures.
8.Contractor shall coordinate with respective schools regarding any lane closures near or within a school zone.
9.Contractor shall contact any related public transportation agency or DART if lane closures involve, or are near, a
public transportation facility, including Bus Stops.
10.Contractor shall notify homeowners with alley access one week prior to alley closing.
11.Contractor shall contact the City Environmental Waste Services Department and coordinate the work so as to
not interrupt the trash pickup schedule.
12.Any excavation more than 2" below the road surface and within 10' of the open path of travel for vehicles will
require vertical panel or barrel delineation. Any excavation more than 24" below the road surface will require
positive lateral control barriers, such as water filled barricades or concrete barriers. Positive lateral control barriers
must be compliant in design and installation with TxDOT Standards 8-01 "Treatment for various edge conditions".
Houston BRANCH
_TMA on all TxDOT TCPs CW1-3R CW1-3LG20-1bR NEXT MILESXXROAD WORKWHEN WORKERS ARE PRESENT WORK ZONETRAFFIC FINES DOUBLE TALK OR TEXT LATERSTAY ALERTG20-10TG20-1bL NEXT MILESXXROAD WORK NEXT MILESXXROAD WORK NEXT MILESXXWORK ZONExxROADWORKAHEADCW20-1DENDROAD WORKG20-2ENDWORK ZONEG20-2
Flagger w/Cones
2-Way Traffic
Vertical Panel
Project Limits SHARETHEROADBIKELANECLOSEDSHARETHEROAD
Chris Schreiner
Marie Rhom
Keith Hamilton
Tony Troxclair
Mike Moreno
Daniel Barron
Matt Sauer
Cole Benton
Michael Cooper
Devan Diviney
Cristian Martinez
Eric Putnam
Alex Thlang
Lauren Putnam
Cisco Meza
Cole Wilson
Chuy DeSantiago
Bianca Ortiz
Cristobal Olvera
Jose Negrete
Josh Aumiller
Jesse Barron
Cody Harvey
Justin LaRose
Russell Johnson
Roland Campa
Ronald Green
BEGINROAD WORKNEXT X MILESG20-TNAMEADDRESSCITYSTATECONTRACTORG20-6T
Devices spaced on 40ft centers
Posted speed limit 50MPH
Phase 3Cole Benton
Navigator
Type 3 Barricade
Sheet 2M4-9LM4-9L
M4-9LM4-
9
R
M4-9RM4-9
L
M4-9R
M4
-
9
LM4-9LM4-9SM4-9LM4-9L
ID Task
Mode
Task Name Duration Start Finish
1 Fairway 44.5 days Tue 9/12/23 Mon 11/13/23
2 Avanced Public Notice 10 days Tue 9/12/23 Mon 9/25/23
3 Phase 1 - SB Lanes 15 days Sat 9/23/23 Fri 10/13/23
4 Set Traffic Control 1 day Tue 9/26/23 Tue 9/26/23
5 Sawcut/Demo/Remove Existing Pavement2 days Wed 9/27/23 Thu 9/28/23
6 Excavate and Embank 2 days Fri 9/29/23 Mon 10/2/23
7 Install Flex Base 3 days Sat 9/23/23 Tue 9/26/23
8 Finish Subgrade 2 days Wed 9/27/23 Thu 9/28/23
9 Install Signal Conduit 1 day Fri 9/29/23 Sat 9/30/23
10 Relocate Pedestrian Traffic Controls 2 days Mon 10/2/23 Tue 10/3/23
11 Re-grade Roadway 2 days Mon 10/2/23 Tue 10/3/23
12 FRP Roadway 4 days Wed 10/4/23 Mon 10/9/23
13 Install Temp Asphalt 1 day Tue 10/10/23 Tue 10/10/23
14 Grade for Sidewalk 2 days Tue 10/10/23 Wed 10/11/23
15 FRP Sidewalks 2 days Thu 10/12/23 Fri 10/13/23
16 Phase 2 - NB Lanes 19 days Mon 10/16/23 Thu 11/9/23
17 Set Traffic Control 1 day Mon 10/16/23 Mon 10/16/23
18 Sawcut/Demo/Remove Existing Pavement2 days Tue 10/17/23 Wed 10/18/23
19 Excavate and Embank 2 days Thu 10/19/23 Fri 10/20/23
20 Install Flex Base 3 days Mon 10/23/23 Wed 10/25/23
21 Finish Subgrade 2 days Thu 10/26/23 Fri 10/27/23
22 Install Signal Conduit 1 day Thu 10/26/23 Thu 10/26/23
23 FRP Roadway 3 days Mon 10/30/23 Wed 11/1/23
24 Grade for Sidewalk 2 days Mon 11/6/23 Tue 11/7/23
25 FRP Sidewalks 2 days Wed 11/8/23 Thu 11/9/23
26 Phase 3 - 3 Day Shut Down 1.5 days Fri 11/10/23 Mon 11/13/23
27 Traffic Control - Close All Lanes 0.5 days Fri 11/10/23 Fri 11/10/23
28 Remove Temp Asphalt 0.5 days Fri 11/10/23 Fri 11/10/23
29 Install Track 0.5 days Sat 11/11/23 Sat 11/11/23
30 Install Asphalt Between Tracks and Headers0.5 days Sat 11/11/23 Sat 11/11/23
31 Install Signal Foundation and Gates 0.5 days Sun 11/12/23 Sun 11/12/23
32 Install Perment Striping and Signage 0.5 days Mon 11/13/23 Mon 11/13/23
33 Remove Traffic Control and Open to Traffic0 days Mon 11/13/23 Mon 11/13/23
AWH MOT
AWH MOT
Lindamood
Lindamood
Lindamood
Lindamood
HTI
HTI
AWH Civil
Urban
AWH Civil
Lindamood
Urban
AWH MOT
Lindamood
Lindamood
Lindamood
Lindamood
HTI
Urban
AWH MOT
AWH Civil
AWH Track
AWH Civil
HTI
Stripe-A-Zone
11/13
S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W
Sep 10, '23 Sep 17, '23 Sep 24, '23 Oct 1, '23 Oct 8, '23 Oct 15, '23 Oct 22, '23 Oct 29, '23 Nov 5, '23 Nov 12, '23 Nov 19, '23
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Page 1
Project: Project1
Date: Mon 9/11/23