Loading...
Cotton Belt-PN230920CITY: CONTRACTOR: JOB NAME: NOTESSALESMAN EXECUTIVE TCP DESIGNER LEGEND SCOPE OF WORK: LOCATION: CONTACT NUMBER: CONTACT: DATE:Reedie Lea THIS PLAN IS FOR ILLUSTRATIVE PURPOSES ONLY AND IS NOT INTENDED TO RELIEVE THE CONTRACTOR FROM THE REQUIREMENTS SET FORTH BY RELATED CONTRACT DOCUMENTS, THE TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) OR THE OVERALL RESPONSIBILITY TO TRAFFIC CONTROL SAFETY. All Traffic Control Plans (TCPs) are the property of Buyers Barricades, Inc. and are included with Buyers Barricades rental agreements. Traffic Control Plans issued without a rental agreement will be charged to the customer. N EW S DART Silverline Coppell Fairway Dr & Belt Line Rd at Crossing Archer Western Herzog One Way Closure 469-346-6620 07/25/2023 Bryan Giron MatchlineMatchlineCENTER LANE CLOSEDCW20-5CROAD WORK AHEADCW20-1DCW20-5RRIGHT LANE CLOSED TURN LANE CLOSEDCW20-5TEND ROAD WORK G20-2 END ROAD WORK G20-2 ROAD WORK AHEADCW20-1DTURN LANE CLOSEDCW20-5TCW20-5RRIGHT LANE CLOSED DETOUR AHEADCW20-2DDETOUR AHEADCW20-2DROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 ROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 120ft400ft 90ft Work Zone 600ft Taper 240ft Buffer 150ft Work Zone 400ft400ft400ft 400ft400ft 400ft 400ft 180ft Buffer 80ft Buffer Belt Line Rd Belt Line Rd Fairway DrDevices spaced on 40ft centers Posted speed limit 50MPH Phase 1Cole Benton Navigator Type 3 Barricade ROAD CLOSED TYPE III R11-2 / CW1-7 Sheet 1 CITY: CONTRACTOR: JOB NAME: NOTESSALESMAN EXECUTIVE TCP DESIGNER LEGEND SCOPE OF WORK: LOCATION: CONTACT NUMBER: CONTACT: DATE:Reedie Lea THIS PLAN IS FOR ILLUSTRATIVE PURPOSES ONLY AND IS NOT INTENDED TO RELIEVE THE CONTRACTOR FROM THE REQUIREMENTS SET FORTH BY RELATED CONTRACT DOCUMENTS, THE TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) OR THE OVERALL RESPONSIBILITY TO TRAFFIC CONTROL SAFETY. All Traffic Control Plans (TCPs) are the property of Buyers Barricades, Inc. and are included with Buyers Barricades rental agreements. Traffic Control Plans issued without a rental agreement will be charged to the customer. N EW S DART Silverline Coppell Fairway Dr & Belt Line Rd at Crossing Archer Western Herzog One Way Closure 469-346-6620 07/25/2023 Bryan Giron Devices spaced on 40ft centers Posted speed limit 50MPH Phase 1Cole Benton Navigator Type 3 Barricade Sheet 2M4-9LM4-9L M4-9LM4- 9 R M4-9RM4-9 L M4-9R CITY: CONTRACTOR: JOB NAME: NOTESSALESMAN EXECUTIVE TCP DESIGNER LEGEND SCOPE OF WORK: LOCATION: CONTACT NUMBER: CONTACT: DATE:Reedie Lea THIS PLAN IS FOR ILLUSTRATIVE PURPOSES ONLY AND IS NOT INTENDED TO RELIEVE THE CONTRACTOR FROM THE REQUIREMENTS SET FORTH BY RELATED CONTRACT DOCUMENTS, THE TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) OR THE OVERALL RESPONSIBILITY TO TRAFFIC CONTROL SAFETY. All Traffic Control Plans (TCPs) are the property of Buyers Barricades, Inc. and are included with Buyers Barricades rental agreements. Traffic Control Plans issued without a rental agreement will be charged to the customer. N EW S DART Silverline Coppell Fairway Dr & Belt Line Rd at Crossing Archer Western Herzog One Way Closure 469-346-6620 07/25/2023 Bryan Giron MatchlineMatchlineCW20-5RRIGHT LANE CLOSED END ROAD WORK G20-2 END ROAD WORK G20-2 ROAD WORK AHEADCW20-1DCW20-5RRIGHT LANE CLOSED ROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 120ft90ft Work Zone 600ft Taper 240ft Buffer 150ft Work Zone 400ft 400ft400ft 400ft Belt Line Rd Belt Line Rd Fairway DrDevices spaced on 40ft centers Posted speed limit 50MPH Phase 2Cole Benton Navigator Type 3 Barricade Sheet 1 ROAD CLOSED AHEADCW20-3DROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 DETOUR AHEADCW20-2DDETOUR AHEADCW20-2DROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 ROAD CLOSEDTOTHRU TRAFFIC120ft 120ft 120ft 120ft ROAD WORK AHEADCW20-1DTYPE III R11-2ROADCLOSEDRiverchas e D r CITY: CONTRACTOR: JOB NAME: NOTESSALESMAN EXECUTIVE TCP DESIGNER LEGEND SCOPE OF WORK: LOCATION: CONTACT NUMBER: CONTACT: DATE:Reedie Lea THIS PLAN IS FOR ILLUSTRATIVE PURPOSES ONLY AND IS NOT INTENDED TO RELIEVE THE CONTRACTOR FROM THE REQUIREMENTS SET FORTH BY RELATED CONTRACT DOCUMENTS, THE TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) OR THE OVERALL RESPONSIBILITY TO TRAFFIC CONTROL SAFETY. All Traffic Control Plans (TCPs) are the property of Buyers Barricades, Inc. and are included with Buyers Barricades rental agreements. Traffic Control Plans issued without a rental agreement will be charged to the customer. N EW S DART Silverline Coppell Fairway Dr & Belt Line Rd at Crossing Archer Western Herzog One Way Closure 469-346-6620 07/25/2023 Bryan Giron Devices spaced on 40ft centers Posted speed limit 50MPH Phase 2Cole Benton Navigator Type 3 Barricade Sheet 2 M4 - 9 LM4-9LM4-9SM4-9LM4-9L Type 1 Type 2 Type 3 ADA Phase 1 Sheet 1 Hamilton Duffy, PC Consulting Tex Reg F-5260 90ft Buffer120ft 245ft Taper 320ft Taper 155ft Buffer240ft 400ft 350ft Buffer 720ft Taper 780ft Taper Arrow Board MB Part A 50ft Work Zone 100ft Work Zone 150ft Work Zone 200ft Work Zone 250ft Work Zone 300ft Work Zone 350ft Work Zone 400ft Work Zone 450ft Work Zone 500ft Work Zone 1000ft Work Zone 1500ft Work Zone RIGHT LANE MUST EXIT R3-33R ONLYONLY STOP HERE ON RED ONLYONLYONLYONLYONLYONLY ONLY Navigator ONLYONLY ONLY ONLYONLYONLYONLY ONLYONLY Navigator Type 3 Barricade Navigator Type 3 Barricade Type 1 Barricade Navigators Type 3 Barricade 2-Way Traffic Vertical Panel Type 3 Barricade Barrels Type 3 Barricade Barrels Type 3 Barricade 2-Way Traffic Vertical Panel Barrels Type 3 Barricade Type 1 Barricade Navigator Type 3 Barricade Type 2 Barricade Type 1 Barricade Barrels Type 3 Barricade Type 2 Barricade Type 1 Barricade Navigator Type 3 Barricade Type 2 Barricade Barrels Type 3 Barricade Type 2 Barricade ONLY ROAD CLOSED TO THRU TRAFFIC TYPE III R11-2 ROAD CLOSED ROAD CLOSED TO THRU TRAFFIC ROAD CLOSED TYPE III R11-2 / CW1-7 ROAD CLOSED DETOUR TYPE III R11-2 / M4-10R ROAD CLOSED DETOUR TYPE III R11-2 / M4-10L DETOUR TYPE III R11-4 / M4-10R ROAD CLOSED TO THRU TRAFFIC DETOUR TYPE III R11-4 / M4-10L ROAD CLOSED TO THRU TRAFFIC RAMP CLOSED ROAD CLOSED SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE 100ft Taper 100ft Buffer 90ft Shifting Taper 100ft 1000ft 1600ft 85ft SIDEWALK CLOSED 600ft Taper 240ft Buffer 180ft Taper 540ft Taper 660ft Taper 160ft 320ft 120ft Buffer 195ft Buffer 295ft Buffer 500ft 700ft410ft Buffer 900ft 600ft 800ft 475ft Buffer 840ft Taper 900ft Taper 540ft Buffer N EW S xxft Shoulder Taper Devices spaced on 35ft centers Posted speed limit 45MPH Devices spaced on 25ft centers Posted speed limit 35MPH Devices spaced on 30ft centers Posted speed limit 40MP H Devices spaced on 40ft centers Posted speed limit 50MPH Devices spaced on 20ft centers Posted speed limit 30MPH Devices spaced on 45ft centers Posted speed limit 55MPH Devices spaced on 50ft centers Posted speed limit 60MPH Devices spaced on 55ft centers Posted speed limit 65MPH Devices spaced on 60ft centers Posted speed limit 70MPH Devices spaced on 65ft centers Posted speed limit 75MPH Devices spaced on 70ft centers Posted speed limit 80MPH KEEP RIGHT RIGHT LANE MUST TURN RIGHT R3-7R LEFT LANE MUST TURN LEFT R3-7L SIDEWALK CLOSED USE OTHER SIDE NOTE: Plan design based on engineered stamped plans provided by Contractor may not conform to TXDOT/MUTCD standards. Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control. Type 2 Barricade Navigators Type 3 Barricade Water Barrier Type 1 Barricade Barrels Type 3 Barricade Water Barrier Navigators Type 3 Barricade Flagger w/Cones Barrels Type 3 Barricade Flagger w/Cones NOTE: Plan requested by Contractor may not conform to TXDOT/MUTCD standards. Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control. ALLEY CLOSED TO THRU TRAFFIC TYPE III R11-2 ALLEY CLOSED ROAD CLOSED TO THRU TRAFFIC SIDEWALK CLOSED USE OTHER SIDE TO BE PLACED AT DO NOT PASS DO NOT DRIVE ON SHOULDER Barrels SIDEWALK CLOSED MatchlineStreet NameALL TRAFFIC MUST EXIT 2600ftPRELIMINARY FOR REVIEW ONLY PE NO. DATE KEITH M. HAMILTON 87384 XX/XX/2023 xx YOUR SPEED XX Radar Trailer MB SZ Q-Lynx MatchlineSIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED Rumble Strips Crash Truck/TMA Water Barrier Concrete Barrier *** *** ROADWORKAHEADCW20-1DCW20-5RRIGHTLANECLOSED CW20-5DLLEFTLANECLOSEDAHEAD RIGHTLANECLOSEDAHEADCW20-5DRTURNLANECLOSEDCW20-5TCENTERLANECLOSEDCW20-5CROADCLOSEDAHEADCW20-3DDETOURAHEADCW20-2DONE LANEROADAHEADCW20-4DBEPREPAREDTOSTOPCW3-4CW20-7LANE ENDSMERGERIGHTCW9-2TRLANE ENDSMERGELEFTCW9-2TL2RIGHT LANESCLOSEDCW20-5aTRSHOULDERWORKCW21-5ROADNARROWSCW5-1TRUCKSENTERINGROADWAYCW27-1TCW3-2CW4-3RCW4-3LCW21-1aT CW1-4LCW1-4RCW6-3CW12-1CW12-1CW12-1ENDROAD WORKG20-2ENDROAD WORKG20-2CW20-5LLEFTLANECLOSEDTOONCOMINGTRAFFICR1-2YIELDR1-2 APSTOPR1-1 R5-1YIELDR1-2WRONGWAYR5-1a ONE WAYR6-1L ONE WAYR6-1RCW1-7DETOURM4-10L DETOURM4-10R ROADCLOSEDR11-2R11-3ROAD CLOSEDAHEADLOCAL TRAFFIC ONLYROAD CLOSEDTOTHRU TRAFFICR11-4****LOOSEGRAVELCW8-7FRESHOILCW21-2TURNLANECLOSEDAHEADCW20-5DTCENTERLANECLOSEDAHEADCW20-5DCCW28-1TPOWER LINESCW23-2NEWTRAFFICPATTERNAHEADUTILITYWORKAHEADCW21-7DWORK ZONExx M4-9SM4-9L M4-9RR3-2R3-1 PR8-3R5-2R3-4INTERSTATETEXAS**ONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LCONSTRUCTIONENTRANCE**M4-9RM4-9L RAMPCLOSEDAHEADCW20-3DSLOW ALLEYCLOSEDAHEAD2RIGHT LANESCLOSED1/2 MILECW20-5aTR2LEFT LANESCLOSEDCW20-5aTLSPECIALEVENTAHEAD ENDWORK ZONEG20-2ENDWORK ZONEG20-2CW3-3CW3-1FRWYCLOSEDAHEADCW20FY-3D CW1-4bL CW1-4bRTORAMPR1-2YIELD CROSSWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE CROSSWALK CLOSED CROSSWALK CLOSED USE OTHER SIDE CITY: CONTRACTOR: JOB NAME: NOTESSALESMAN EXECUTIVE TCP DESIGNER LEGEND SCOPE OF WORK: LOCATION: CONTACT NUMBER: CONTACT: DATE:Reedie Lea THIS PLAN IS FOR ILLUSTRATIVE PURPOSES ONLY AND IS NOT INTENDED TO RELIEVE THE CONTRACTOR FROM THE REQUIREMENTS SET FORTH BY RELATED CONTRACT DOCUMENTS, THE TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) OR THE OVERALL RESPONSIBILITY TO TRAFFIC CONTROL SAFETY. All Traffic Control Plans (TCPs) are the property of Buyers Barricades, Inc. and are included with Buyers Barricades rental agreements. Traffic Control Plans issued without a rental agreement will be charged to the customer. Fencing Street Name ONLYONLY Water Barrier w/Fence ADA Pedestrian Barricade xx SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED SIDEWALK CLOSED USE OTHER SIDE ROADWORK1 MILECW20-1Fxxxx ONLYONLY Gate POLICE XXXXXXXXXXX CLOSEDBIKE LANExxMPH BEGIN ONE WAY DETOUR C S Navigator w/Lights CW20-5RRIGHT LANE CLOSED 1/2 MILE CW20-5RRIGHT LANE CLOSED 1000ft CW20-5LLEFT LANE CLOSED 1/2 MILE CW20-5LLEFT LANE CLOSED 1000ft 2 RIGHT LANES CLOSEDCW20-5aTR1000ft 2 LEFT LANES CLOSEDCW20-5aTL1000ft 2 RIGHT LANES CLOSEDCW20-5aTR1/2 MILE 2 LEFT LANES CLOSEDCW20-5aTL1/2 MILE 1000ft 1/2 MILE RAMP CLOSED AHEADCW20-3D1000ft RAMP CLOSED AHEADCW20-3D1/2 MILE THRUTRAFFICMERGERIGHTCW4-1ATRTHRUTRAFFICMERGELEFTCW4-1ATLxxCW3-5BUMPCW8-1R9-3 RUMBLESTRIPSAHEADCW17-2TLEFT LANE MUST EXIT R3-33L N EW S DART Silverline Coppell Fairway Dr & Belt Line Rd at Crossing Archer Western Herzog Road Closure 469-346-6620 08/28/2023 Bryan Giron Matchline Flashing Electronic Arrow Board Flashing Electronic Arrow Board Flashing Electronic Arrow Board ROAD WORK 1 MILECW20-1FROAD WORK AHEADCW20-1D30 180 90 120 Speed Taper Buffer Sign Spacing 35 40 45 50 245 320 540 600 120 155 195 240 160 240 320 400 55 660 295 500 60 720 350 600 65 780 410 700 70 840 475 800 75 900 540 900 Special RulesPlano-Double-up Signs-Add General NotesDallas-Intersections Count As Buffer-No “End Road Work” Fort Worth -Arrow Board 40MPH+ Richardson -Sign Sequence (RWA, LCA, LEML/R) 2L Rule-On freeways, FIRST buffer length shall be 2x the length of the Taper fordouble lane closures. “Diamond” rule for Crossovers -On the diamonds made to push traffic back over from a 2-way application, the spacing is to be a 1/2L taper length 1/2L -”1 Block Rule” -First Buffer length shall be 2x the length of the Taper for double lane closures. Carrollton -ADA Pedestrian Barricades for sidewalk closures San Antonio/Austin/Surrounding Areas -TMAs on all TxDOT plans - Barrels for sidewalk closures -Double up signs on TxDot plans -On freeways, FIRST and SECOND buffer length shall be 2x the length of the Taper for Triple lane closures.Freeway Closure Rule-TMAs to be placed after Type IIIs NTE - LBJ-Flags on “Road Work” signs Austin -Must be drawn in black and white -Arrow Board on all lane closures Houston -Arrow Board on all lane closures Downtown General Notes: 1.Lane Closure from 8.30am - 4.00pm only. 2.Lane shall be open in non-working hours by removing (or turn down) all lane closure signs (e.g 'Right Lane closed' sign) Garland -Double-up Signs -Add General Notes -”1 Block Rule” City of Plano Traffic Control Plan General Notes (rev. 04-18-2022): 1.Contractor shall be responsible to maintain traffic control as set forth in the Texas Manual on Uniform Traffic Control Devices (TMUTCD) for Streets and Highways, particularly Part 6 – Temporary Traffic Control, and according to any notes provided on the TCP by the City engineer. 2.Lanes may be closed to traffic during 9 AM-4 PM only. Lane closures outside this time window require separate approval. 3.ADA compliant accessible pedestrian routes shall be maintained at all times. 4.Temporary Traffic Control (TTC) devices (cones, signs, barricades) shall only be in place or visible during times while work is in progress. When possible, unnecessary or incorrect devices for the implemented work zone shall be removed or covered as the work zone changes. 5.Contractor shall contact the City of Plano Project Manager or the Traffic Management Center (972) 941-7289 at least one week prior to lane closing if work is to occur within 100' of a signalized intersection. 6.Any portion of a traffic control plan on an approach to a signalized intersection within 200' of the intersection must have a maximum traffic control device spacing of 20'. 7.Contactor shall coordinate with the owner or related entity regarding lane closures on any private right of way (ROW) or street. Contractor shall follow the TMUTCD guidelines during lane closures. 8.Contractor shall coordinate with respective schools regarding any lane closures near or within a school zone. 9.Contractor shall contact any related public transportation agency or DART if lane closures involve, or are near, a public transportation facility, including Bus Stops. 10.Contractor shall notify homeowners with alley access one week prior to alley closing. 11.Contractor shall contact the City Environmental Waste Services Department and coordinate the work so as to not interrupt the trash pickup schedule. 12.Any excavation more than 2" below the road surface and within 10' of the open path of travel for vehicles will require vertical panel or barrel delineation. Any excavation more than 24" below the road surface will require positive lateral control barriers, such as water filled barricades or concrete barriers. Positive lateral control barriers must be compliant in design and installation with TxDOT Standards 8-01 "Treatment for various edge conditions". Houston BRANCH _TMA on all TxDOT TCPs CW1-3R CW1-3LG20-1bR NEXT MILESXXROAD WORKWHEN WORKERS ARE PRESENT WORK ZONETRAFFIC FINES DOUBLE TALK OR TEXT LATERSTAY ALERTG20-10TG20-1bL NEXT MILESXXROAD WORK NEXT MILESXXROAD WORK NEXT MILESXXWORK ZONExxROADWORKAHEADCW20-1DENDROAD WORKG20-2ENDWORK ZONEG20-2 Flagger w/Cones 2-Way Traffic Vertical Panel Project Limits SHARETHEROADBIKELANECLOSEDSHARETHEROAD Chris Schreiner Marie Rhom Keith Hamilton Tony Troxclair Mike Moreno Daniel Barron Matt Sauer Cole Benton Michael Cooper Devan Diviney Cristian Martinez Eric Putnam Alex Thlang Lauren Putnam Cisco Meza Cole Wilson Chuy DeSantiago Bianca Ortiz Cristobal Olvera Jose Negrete Josh Aumiller Jesse Barron Cody Harvey Justin LaRose Russell Johnson Roland Campa Ronald Green BEGINROAD WORKNEXT X MILESG20-TNAMEADDRESSCITYSTATECONTRACTORG20-6T CENTER LANE CLOSEDCW20-5CROAD WORK AHEADCW20-1DTURN LANE CLOSEDCW20-5TEND ROAD WORK G20-2 END ROAD WORK G20-2 ROAD WORK AHEADCW20-1DTURN LANE CLOSEDCW20-5TDETOUR AHEADCW20-2DDETOUR AHEADCW20-2DROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 400ft 150ft Work Zone 400ft400ft400ft 400ft400ft 180ft Buffer 80ft Buffer Belt Line Rd Fairway DrDevices spaced on 40ft centers Posted speed limit 50MPH Phase 3Cole Benton Navigator Type 3 Barricade Sheet 1 ROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 DETOUR AHEADCW20-2DDETOUR AHEADCW20-2DROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 ROAD CLOSEDTOTHRU TRAFFIC120ft 120ft 120ft 120ft Riverchas e D r 120ftROAD CLOSED AHEADCW20-3DTYPE III R11-2ROADCLOSEDROAD CLOSED TYPE III R11-2 / CW1-7 Type 1 Type 2 Type 3 ADA Phase 1 Sheet 1 Hamilton Duffy, PC Consulting Tex Reg F-5260 90ft Buffer120ft 245ft Taper 320ft Taper 155ft Buffer240ft 400ft 350ft Buffer 720ft Taper 780ft Taper Arrow Board MB Part A 50ft Work Zone 100ft Work Zone 150ft Work Zone 200ft Work Zone 250ft Work Zone 300ft Work Zone 350ft Work Zone 400ft Work Zone 450ft Work Zone 500ft Work Zone 1000ft Work Zone 1500ft Work Zone RIGHT LANE MUST EXIT R3-33R ONLYONLY STOP HERE ON RED ONLYONLYONLYONLYONLYONLY ONLY Navigator ONLYONLY ONLY ONLYONLYONLYONLY ONLYONLY Navigator Type 3 Barricade Navigator Type 3 Barricade Type 1 Barricade Navigators Type 3 Barricade 2-Way Traffic Vertical Panel Type 3 Barricade Barrels Type 3 Barricade Barrels Type 3 Barricade 2-Way Traffic Vertical Panel Barrels Type 3 Barricade Type 1 Barricade Navigator Type 3 Barricade Type 2 Barricade Type 1 Barricade Barrels Type 3 Barricade Type 2 Barricade Type 1 Barricade Navigator Type 3 Barricade Type 2 Barricade Barrels Type 3 Barricade Type 2 Barricade ONLY ROAD CLOSED TO THRU TRAFFIC TYPE III R11-2 ROAD CLOSED ROAD CLOSED TO THRU TRAFFIC ROAD CLOSED TYPE III R11-2 / CW1-7 ROAD CLOSED DETOUR TYPE III R11-2 / M4-10R ROAD CLOSED DETOUR TYPE III R11-2 / M4-10L DETOUR TYPE III R11-4 / M4-10R ROAD CLOSED TO THRU TRAFFIC DETOUR TYPE III R11-4 / M4-10L ROAD CLOSED TO THRU TRAFFIC RAMP CLOSED ROAD CLOSED SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE 100ft Taper 100ft Buffer 90ft Shifting Taper 100ft 1000ft 1600ft 85ft SIDEWALK CLOSED 600ft Taper 240ft Buffer 180ft Taper 540ft Taper 660ft Taper 160ft 320ft 120ft Buffer 195ft Buffer 295ft Buffer 500ft 700ft410ft Buffer 900ft 600ft 800ft 475ft Buffer 840ft Taper 900ft Taper 540ft Buffer N EW S xxft Shoulder Taper Devices spaced on 35ft centers Posted speed limit 45MPH Devices spaced on 25ft centers Posted speed limit 35MPH Devices spaced on 30ft centers Posted speed limit 40MP H Devices spaced on 40ft centers Posted speed limit 50MPH Devices spaced on 20ft centers Posted speed limit 30MPH Devices spaced on 45ft centers Posted speed limit 55MPH Devices spaced on 50ft centers Posted speed limit 60MPH Devices spaced on 55ft centers Posted speed limit 65MPH Devices spaced on 60ft centers Posted speed limit 70MPH Devices spaced on 65ft centers Posted speed limit 75MPH Devices spaced on 70ft centers Posted speed limit 80MPH KEEP RIGHT RIGHT LANE MUST TURN RIGHT R3-7R LEFT LANE MUST TURN LEFT R3-7L SIDEWALK CLOSED USE OTHER SIDE NOTE: Plan design based on engineered stamped plans provided by Contractor may not conform to TXDOT/MUTCD standards. Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control. Type 2 Barricade Navigators Type 3 Barricade Water Barrier Type 1 Barricade Barrels Type 3 Barricade Water Barrier Navigators Type 3 Barricade Flagger w/Cones Barrels Type 3 Barricade Flagger w/Cones NOTE: Plan requested by Contractor may not conform to TXDOT/MUTCD standards. Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control. ALLEY CLOSED TO THRU TRAFFIC TYPE III R11-2 ALLEY CLOSED ROAD CLOSED TO THRU TRAFFIC SIDEWALK CLOSED USE OTHER SIDE TO BE PLACED AT DO NOT PASS DO NOT DRIVE ON SHOULDER Barrels SIDEWALK CLOSED MatchlineStreet NameALL TRAFFIC MUST EXIT 2600ftPRELIMINARY FOR REVIEW ONLY PE NO. DATE KEITH M. HAMILTON 87384 XX/XX/2023 xx YOUR SPEED XX Radar Trailer MB SZ Q-Lynx MatchlineSIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED Rumble Strips Crash Truck/TMA Water Barrier Concrete Barrier *** *** ROADWORKAHEADCW20-1DCW20-5RRIGHTLANECLOSED CW20-5DLLEFTLANECLOSEDAHEAD RIGHTLANECLOSEDAHEADCW20-5DRTURNLANECLOSEDCW20-5TCENTERLANECLOSEDCW20-5CROADCLOSEDAHEADCW20-3DDETOURAHEADCW20-2DONE LANEROADAHEADCW20-4DBEPREPAREDTOSTOPCW3-4CW20-7LANE ENDSMERGERIGHTCW9-2TRLANE ENDSMERGELEFTCW9-2TL2RIGHT LANESCLOSEDCW20-5aTRSHOULDERWORKCW21-5ROADNARROWSCW5-1TRUCKSENTERINGROADWAYCW27-1TCW3-2CW4-3RCW4-3LCW21-1aT CW1-4LCW1-4RCW6-3CW12-1CW12-1CW12-1ENDROAD WORKG20-2ENDROAD WORKG20-2CW20-5LLEFTLANECLOSEDTOONCOMINGTRAFFICR1-2YIELDR1-2 APSTOPR1-1 R5-1YIELDR1-2WRONGWAYR5-1a ONE WAYR6-1L ONE WAYR6-1RCW1-7DETOURM4-10L DETOURM4-10R ROADCLOSEDR11-2R11-3ROAD CLOSEDAHEADLOCAL TRAFFIC ONLYROAD CLOSEDTOTHRU TRAFFICR11-4****LOOSEGRAVELCW8-7FRESHOILCW21-2TURNLANECLOSEDAHEADCW20-5DTCENTERLANECLOSEDAHEADCW20-5DCCW28-1TPOWER LINESCW23-2NEWTRAFFICPATTERNAHEADUTILITYWORKAHEADCW21-7DWORK ZONExx M4-9SM4-9L M4-9RR3-2R3-1 PR8-3R5-2R3-4INTERSTATETEXAS**ONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LCONSTRUCTIONENTRANCE**M4-9RM4-9L RAMPCLOSEDAHEADCW20-3DSLOW ALLEYCLOSEDAHEAD2RIGHT LANESCLOSED1/2 MILECW20-5aTR2LEFT LANESCLOSEDCW20-5aTLSPECIALEVENTAHEAD ENDWORK ZONEG20-2ENDWORK ZONEG20-2CW3-3CW3-1FRWYCLOSEDAHEADCW20FY-3D CW1-4bL CW1-4bRTORAMPR1-2YIELD CROSSWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE CROSSWALK CLOSED CROSSWALK CLOSED USE OTHER SIDE CITY: CONTRACTOR: JOB NAME: NOTESSALESMAN EXECUTIVE TCP DESIGNER LEGEND SCOPE OF WORK: LOCATION: CONTACT NUMBER: CONTACT: DATE:Reedie Lea THIS PLAN IS FOR ILLUSTRATIVE PURPOSES ONLY AND IS NOT INTENDED TO RELIEVE THE CONTRACTOR FROM THE REQUIREMENTS SET FORTH BY RELATED CONTRACT DOCUMENTS, THE TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) OR THE OVERALL RESPONSIBILITY TO TRAFFIC CONTROL SAFETY. All Traffic Control Plans (TCPs) are the property of Buyers Barricades, Inc. and are included with Buyers Barricades rental agreements. Traffic Control Plans issued without a rental agreement will be charged to the customer. Fencing Street Name ONLYONLY Water Barrier w/Fence ADA Pedestrian Barricade xx SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED SIDEWALK CLOSED USE OTHER SIDE ROADWORK1 MILECW20-1Fxxxx ONLYONLY Gate POLICE XXXXXXXXXXX CLOSEDBIKE LANExxMPH BEGIN ONE WAY DETOUR C S Navigator w/Lights CW20-5RRIGHT LANE CLOSED 1/2 MILE CW20-5RRIGHT LANE CLOSED 1000ft CW20-5LLEFT LANE CLOSED 1/2 MILE CW20-5LLEFT LANE CLOSED 1000ft 2 RIGHT LANES CLOSEDCW20-5aTR1000ft 2 LEFT LANES CLOSEDCW20-5aTL1000ft 2 RIGHT LANES CLOSEDCW20-5aTR1/2 MILE 2 LEFT LANES CLOSEDCW20-5aTL1/2 MILE 1000ft 1/2 MILE RAMP CLOSED AHEADCW20-3D1000ft RAMP CLOSED AHEADCW20-3D1/2 MILE THRUTRAFFICMERGERIGHTCW4-1ATRTHRUTRAFFICMERGELEFTCW4-1ATLxxCW3-5BUMPCW8-1R9-3 RUMBLESTRIPSAHEADCW17-2TLEFT LANE MUST EXIT R3-33L N EW S DART Silverline Coppell Fairway Dr & Belt Line Rd at Crossing Archer Western Herzog Road Closure 469-346-6620 08/28/2023 Bryan Giron Matchline Flashing Electronic Arrow Board Flashing Electronic Arrow Board Flashing Electronic Arrow Board ROAD WORK 1 MILECW20-1FROAD WORK AHEADCW20-1D30 180 90 120 Speed Taper Buffer Sign Spacing 35 40 45 50 245 320 540 600 120 155 195 240 160 240 320 400 55 660 295 500 60 720 350 600 65 780 410 700 70 840 475 800 75 900 540 900 Special RulesPlano-Double-up Signs-Add General NotesDallas-Intersections Count As Buffer-No “End Road Work” Fort Worth -Arrow Board 40MPH+ Richardson -Sign Sequence (RWA, LCA, LEML/R) 2L Rule-On freeways, FIRST buffer length shall be 2x the length of the Taper fordouble lane closures. “Diamond” rule for Crossovers -On the diamonds made to push traffic back over from a 2-way application, the spacing is to be a 1/2L taper length 1/2L -”1 Block Rule” -First Buffer length shall be 2x the length of the Taper for double lane closures. Carrollton -ADA Pedestrian Barricades for sidewalk closures San Antonio/Austin/Surrounding Areas -TMAs on all TxDOT plans - Barrels for sidewalk closures -Double up signs on TxDot plans -On freeways, FIRST and SECOND buffer length shall be 2x the length of the Taper for Triple lane closures.Freeway Closure Rule-TMAs to be placed after Type IIIs NTE - LBJ-Flags on “Road Work” signs Austin -Must be drawn in black and white -Arrow Board on all lane closures Houston -Arrow Board on all lane closures Downtown General Notes: 1.Lane Closure from 8.30am - 4.00pm only. 2.Lane shall be open in non-working hours by removing (or turn down) all lane closure signs (e.g 'Right Lane closed' sign) Garland -Double-up Signs -Add General Notes -”1 Block Rule” City of Plano Traffic Control Plan General Notes (rev. 04-18-2022): 1.Contractor shall be responsible to maintain traffic control as set forth in the Texas Manual on Uniform Traffic Control Devices (TMUTCD) for Streets and Highways, particularly Part 6 – Temporary Traffic Control, and according to any notes provided on the TCP by the City engineer. 2.Lanes may be closed to traffic during 9 AM-4 PM only. Lane closures outside this time window require separate approval. 3.ADA compliant accessible pedestrian routes shall be maintained at all times. 4.Temporary Traffic Control (TTC) devices (cones, signs, barricades) shall only be in place or visible during times while work is in progress. When possible, unnecessary or incorrect devices for the implemented work zone shall be removed or covered as the work zone changes. 5.Contractor shall contact the City of Plano Project Manager or the Traffic Management Center (972) 941-7289 at least one week prior to lane closing if work is to occur within 100' of a signalized intersection. 6.Any portion of a traffic control plan on an approach to a signalized intersection within 200' of the intersection must have a maximum traffic control device spacing of 20'. 7.Contactor shall coordinate with the owner or related entity regarding lane closures on any private right of way (ROW) or street. Contractor shall follow the TMUTCD guidelines during lane closures. 8.Contractor shall coordinate with respective schools regarding any lane closures near or within a school zone. 9.Contractor shall contact any related public transportation agency or DART if lane closures involve, or are near, a public transportation facility, including Bus Stops. 10.Contractor shall notify homeowners with alley access one week prior to alley closing. 11.Contractor shall contact the City Environmental Waste Services Department and coordinate the work so as to not interrupt the trash pickup schedule. 12.Any excavation more than 2" below the road surface and within 10' of the open path of travel for vehicles will require vertical panel or barrel delineation. Any excavation more than 24" below the road surface will require positive lateral control barriers, such as water filled barricades or concrete barriers. Positive lateral control barriers must be compliant in design and installation with TxDOT Standards 8-01 "Treatment for various edge conditions". Houston BRANCH _TMA on all TxDOT TCPs CW1-3R CW1-3LG20-1bR NEXT MILESXXROAD WORKWHEN WORKERS ARE PRESENT WORK ZONETRAFFIC FINES DOUBLE TALK OR TEXT LATERSTAY ALERTG20-10TG20-1bL NEXT MILESXXROAD WORK NEXT MILESXXROAD WORK NEXT MILESXXWORK ZONExxROADWORKAHEADCW20-1DENDROAD WORKG20-2ENDWORK ZONEG20-2 Flagger w/Cones 2-Way Traffic Vertical Panel Project Limits SHARETHEROADBIKELANECLOSEDSHARETHEROAD Chris Schreiner Marie Rhom Keith Hamilton Tony Troxclair Mike Moreno Daniel Barron Matt Sauer Cole Benton Michael Cooper Devan Diviney Cristian Martinez Eric Putnam Alex Thlang Lauren Putnam Cisco Meza Cole Wilson Chuy DeSantiago Bianca Ortiz Cristobal Olvera Jose Negrete Josh Aumiller Jesse Barron Cody Harvey Justin LaRose Russell Johnson Roland Campa Ronald Green BEGINROAD WORKNEXT X MILESG20-TNAMEADDRESSCITYSTATECONTRACTORG20-6T Devices spaced on 40ft centers Posted speed limit 50MPH Phase 3Cole Benton Navigator Type 3 Barricade Sheet 2M4-9LM4-9L M4-9LM4- 9 R M4-9RM4-9 L M4-9R M4 - 9 LM4-9LM4-9SM4-9LM4-9L ID Task Mode Task Name Duration Start Finish 1 Fairway 44.5 days Tue 9/12/23 Mon 11/13/23 2 Avanced Public Notice 10 days Tue 9/12/23 Mon 9/25/23 3 Phase 1 - SB Lanes 15 days Sat 9/23/23 Fri 10/13/23 4 Set Traffic Control 1 day Tue 9/26/23 Tue 9/26/23 5 Sawcut/Demo/Remove Existing Pavement2 days Wed 9/27/23 Thu 9/28/23 6 Excavate and Embank 2 days Fri 9/29/23 Mon 10/2/23 7 Install Flex Base 3 days Sat 9/23/23 Tue 9/26/23 8 Finish Subgrade 2 days Wed 9/27/23 Thu 9/28/23 9 Install Signal Conduit 1 day Fri 9/29/23 Sat 9/30/23 10 Relocate Pedestrian Traffic Controls 2 days Mon 10/2/23 Tue 10/3/23 11 Re-grade Roadway 2 days Mon 10/2/23 Tue 10/3/23 12 FRP Roadway 4 days Wed 10/4/23 Mon 10/9/23 13 Install Temp Asphalt 1 day Tue 10/10/23 Tue 10/10/23 14 Grade for Sidewalk 2 days Tue 10/10/23 Wed 10/11/23 15 FRP Sidewalks 2 days Thu 10/12/23 Fri 10/13/23 16 Phase 2 - NB Lanes 19 days Mon 10/16/23 Thu 11/9/23 17 Set Traffic Control 1 day Mon 10/16/23 Mon 10/16/23 18 Sawcut/Demo/Remove Existing Pavement2 days Tue 10/17/23 Wed 10/18/23 19 Excavate and Embank 2 days Thu 10/19/23 Fri 10/20/23 20 Install Flex Base 3 days Mon 10/23/23 Wed 10/25/23 21 Finish Subgrade 2 days Thu 10/26/23 Fri 10/27/23 22 Install Signal Conduit 1 day Thu 10/26/23 Thu 10/26/23 23 FRP Roadway 3 days Mon 10/30/23 Wed 11/1/23 24 Grade for Sidewalk 2 days Mon 11/6/23 Tue 11/7/23 25 FRP Sidewalks 2 days Wed 11/8/23 Thu 11/9/23 26 Phase 3 - 3 Day Shut Down 1.5 days Fri 11/10/23 Mon 11/13/23 27 Traffic Control - Close All Lanes 0.5 days Fri 11/10/23 Fri 11/10/23 28 Remove Temp Asphalt 0.5 days Fri 11/10/23 Fri 11/10/23 29 Install Track 0.5 days Sat 11/11/23 Sat 11/11/23 30 Install Asphalt Between Tracks and Headers0.5 days Sat 11/11/23 Sat 11/11/23 31 Install Signal Foundation and Gates 0.5 days Sun 11/12/23 Sun 11/12/23 32 Install Perment Striping and Signage 0.5 days Mon 11/13/23 Mon 11/13/23 33 Remove Traffic Control and Open to Traffic0 days Mon 11/13/23 Mon 11/13/23 AWH MOT AWH MOT Lindamood Lindamood Lindamood Lindamood HTI HTI AWH Civil Urban AWH Civil Lindamood Urban AWH MOT Lindamood Lindamood Lindamood Lindamood HTI Urban AWH MOT AWH Civil AWH Track AWH Civil HTI Stripe-A-Zone 11/13 S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W Sep 10, '23 Sep 17, '23 Sep 24, '23 Oct 1, '23 Oct 8, '23 Oct 15, '23 Oct 22, '23 Oct 29, '23 Nov 5, '23 Nov 12, '23 Nov 19, '23 Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only External Tasks External Milestone Deadline Progress Manual Progress Page 1 Project: Project1 Date: Mon 9/11/23