Blackberry Farm-PT240103A copy of the approved permit must be on the job site at all times
Page 1 of 5RIGHT-OF-WAY USE PERMIT APPLICATION Rev.08/2020
Permit Valid for 120 Days From Date of Approval
All activity authorized by this permit shall be in accordance with
CHAPTER 283 of the Texas Local Government Code and the City of
Coppell Public Rights-of-Way Management ordinance No. 2001-944
Date of Submittal:__________________ Applicant’s Job # / Work Order #_____________________
Project Name / Location and Address:__________________________________________________
Permit Fee: $100.00 (No fee for applications submitted on behalf of Utility Companies with a current Public
Rights-of-Way Management Ordinance Registration). S.P.C.O.A. Certificate # ____________________
Utility Company Information:
Oncor Electric Delivery Atmos Energy Frontier Spectrum
Level 3 Other:________________________________________________________
Utility Company Representative:____________________________________________________
E-mail Address:__________________________________Telephone:______________________
Contractor Information:
General Contractor:______________________________________________________________
General Contractor Representative:_________________________________________________
E-mail Address:__________________________________Telephone:______________________
Project Information:
General Description of Proposed Construction (Attach Plan & Profile, See Page 5 for Example):
Estimated Start Date:_______________ Estimated Completion Date:_________________
Has 811 and/or utility companies been contacted 48 hours prior to locate existing utilities?
Yes No If No, state reason:_________________________________________________
Is removal of existing streets, alleys or sidewalks necessary? Yes No
If YES, repair must have a City inspection prior to completion. Call 972-304-3679.
Is closure of any traffic lanes or driveway approaches necessary? Yes No
If YES, a traffic control plan in accordance with TMUTCD standards must be submitted, and
the following departments must be notified of the location and duration of the closure:
Police Department, 972-304-3600 Fire Department, 972-304-3512
Street Department, 972-462-5150 Engineering Department, 972-304-3679
Traffic lane closures are allowed from 9:30 a.m until 3:30 p.m. ONLY unless otherwise
approved by the City Engineer.
--Work activity is permitted from 7:00 a.m. until 7:00 p.m., Monday through Friday only.--
01/03/2024 20375715
1300 SANDY LAKE RD, COPPELL, TX, 75019
n
Mohammad Abu Arja
Mohammad.Abuarja@Oncor.com (214) 784-5102
Install 2 new 45 FT Class 3 Riser Poles. See attached for full design and print.
01/04/2024 02/04/2024
n
n
n
Right of Way Use Permit Application Page 2 of 5
This application, with signatures of Utility and Contractor representatives, must be submitted to the
Engineering Department for approval prior to commencing work. Printing your name and date on this
form indicates your acceptance of the terms and conditions of this application.
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim,
demand, or cause of action that may be made or come against it by reason of or if any way arising out of
the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from
the City, if such permit is granted.
________________________________________ ___________________________________
Signature of Utility Company Representative Date
________________________________________ ___________________________________
Signature of Contractor Representative Date
________________________________________ ___________________________________
APPROVED City Representative Date
DENIED
Comments:
E-mail address to return completed permit:__________________________________________________
Submit permit application by e-mail to engineer@coppelltx.gov, or deliver application to the
Engineering Department, Town Center Business Park, 265 E Parkway Blvd, Coppell, TX 75019
SUMMARY OF REQUIREMENTS FOR WORK WITHIN
THE CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS
1.A copy of the valid approved City of Coppell permit is required on the project site at all times.
2.Property owners (commercial and residential) adjacent to the project must be notified of the
project timeline and provided contractor names and phone numbers. No access to private
property without prior coordination with property owner.
3.Proper erosion control measures must be taken, in accordance with the Coppell Erosion Control
Ordinance No. 91-514.
4.Follow Texas MUTCD standards for work in traffic zones. Lane closures require the use of a
flashing arrow board for advance warning.
5.Grading shall be restored or improved, and sod replaced when necessary.
01/03/2024
Mohammad.Abuarja@oncor.com
Mohammad Abu Arja
01/03/2024Scott Latta
X
Right of Way Use Permit Application Page 3 of 5
6.Irrigation repairs must be performed in a timely manner.
7.Follow OSHA trench safety guidelines at all times.
8.Repair existing utilities that are damaged, including but not limited to: Clean-outs, water valves,
wastewater manholes, water lines, wastewater lines and storm sewer lines.
9. Density tests may be required, at applicant’s expense, in trench lines (ASTM).
10.Protection and repair of traffic control devices and signage is the responsibility of the contractor.
11.No work is to be done in collector roadways before 9:30 a.m. or after 3:30 p.m.
12.Prior request of work activity on weekends and holidays must be submitted in writing.
13.Utility line locates must be performed in advance of construction by calling 811 or logging on
to the Texas811 Portal at: http://www.texas811.org. Additional utility contacts are as follows:
COPPELL PUBLIC WORKS - OPERATIONS COPPELL PUBLIC WORKS - ENGINEERING
972-304-3679
DENTON COUNTY LEVEE DISTRICT
972-315-5019
T.C.E.Q. Region 4
817-588-5800
IRVING WATER UTILITIES
972-721-2281
ATMOS ENERGY
888-286-6700
EXPLORER PIPELINE
918-493-5100
ONCOR ELECTRIC DELIVERY
888-313-6862
972-462-5150
HOMEOWNER ASSOCIATIONS
Planning Department: H.O.A. List
F.E.M.A.
940-898-5399
DALLAS WATER UTILITIES
214-670-5111
AT&T
800-924-9420
COSERV Gas & Electric
940-321-7800
FRONTIER COMMUNICATIONS
800-584-3384
SPECTRUM CABLE
833-780-1880
14. Debris must be removed from work area daily and disposed of properly outside the City.
15.Streets, sidewalks and alleys must be kept clear of construction materials and debris.
16.“Clean-up” requires returning work area to pre-construction condition or better.
Right of Way Use Permit Application Page 4 of 5
Contact Coppell Public Works Operations at 972/462-5150 to schedule an inspection with
Utility and Streets personnel to verify that your project has been completed to City of
Coppell specifications. Failure to schedule verification inspection may delay future projects.
Franchise Utility Name:___________________________________________________________
Project Location or Address:_______________________________________________________
Sub-contractor Company Name:____________________________________________________
24 hr. Contact Number:____________________________________________________________
Date of Verification Appointment:_________________________ Time:____________________
-INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORKS PERSONNEL-
Inspected by:_________________ of Utilities Maintenance Division on _______________
and found to be acceptable, not acceptable because:___________________________
Follow-up needed? No Yes, follow-up scheduled for:__________________________
Inspected by:__________________ of Streets Maintenance Division on _______________
and found to be acceptable, not acceptable because:___________________________
Follow-up needed? No Yes, follow-up scheduled for:__________________________
A copy of this completed notice can be e-mailed to the Coppell Public Works
Operations Division, or delivered to the address below:
City of Coppell Public Works Department, Operations Division
816 S. Coppell Road
Coppell, TX 75019
COMPLETION VERIFICATION NOTICE
Oncor Electric Delivery
1300 SANDY LAKE RD, COPPELL, TX, 75019
(469) 261-6466
EXAMPLE
||444444
4
4
44444
4
4
4
44444444
4 4444444444
4
4 44
4
44 444444 444444444444
444444444
4
44
4444444
44444444444
44 44|||||||||||
||||||||||{{{{{
{{||||||||||||
||||||||||{{{{{{{{|UUUUUU
UUUvvvv
v vv vvvvvvvvv vvvvv
vvuu
u
uuu
u
u
u
uuu
u
u
uu
u
B
BBB
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
D
B
hhhhhhhhhhhhhh
hhgg gg
gggg
g
C C
L
j
j
j
j
j
j
j
j
j
j
j
j
j
j
jjj
0 0C
B
B
G
D
D
D
D
D
D
D
D D
H
JH
HH H
HHH
HH
HHHOOOO
O
O
OOOOO
OOOO OOOOO OO
O
O OO
OO
O
O
OOOO
OOOOOOOO
F
F
EFFFFP
P""
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
"
"
"AC
iiiii
i
iii
ii
iii
A
AAE0
0
0
0
0
0
0
0
0
J
JJ
J JJJ I
I
IIIII
I
I
I
I
IIIIIII I
MM MM
M
C C
5
5
f
AC
VLYRN2953
VLYRN2953100 A150 ABC 100 A50 C75 A
I:
7
5
B
I:
1
0
0
B
I
:
75 BI: 75 BI: 100 BI: 100 B
I: 75 B
I: 100 B
I: 25 BFI FIFI
FI
FI
50 50
C: 4 ACSRC: 4/0 AL
C: 6
A
L
C: 4/0 ALC: 4/0 ALC: 4/0 ALC: 4/0 ALC: 1/0 ALC: 1/0 AL100
250
250
250
250
25
0
25
0
25
0
25
0
1
0
0100100100100811673889706
350 KCM
I
L 350 KCMIL
350 K
C
MI
L
350 KCMIL
35
0
K
C
M
I
L
350 KCMI
L
35
0
K
C
M
I
L350 KCMIL3931968-36673362166474
-8650
2166474
-8643
2166474
-9212
3932091
-3666995
3932085
-3667220
3932235-36671603932331-36671073932435-366703439326763932135-36672033932063
-3667337
3296948
-09695536
3296949
-09695568
CABCABCAB
CAB
CAB
063/337
3932646
-3667041
2166474
-7205
2
1
6
6
4
7
5
-
6
7
1
5
216747
4
-0088
2167475
-0035
21
6
6
4
7
4
-
6
9
9
0
3297007
-09695336
3296997
-09695321
3297027
-09695161
3297065
-09695269
3297117
-09695358
3297218
-09695483
3297084
-09695478
3297022
-09695478
3296985
-09695416
C: 477 ACSR3931850-36672953932205-36672453932401-36671273932498-36670502166475-95332166474
-99812166475-97073932030-36672973296918
-09695505
3296957
-09695460
3296991
-09695353
3297054
-09695273
3297057
-09695164
3297134
-09695437
3297211
-09695465
3297022
-09695468
3297172
-09695424
3297183
-09695427C: 1/0 AL80
Universal Academy Flower MoundUniversal Academy-Coppell Campus
820
102110171013
1003
1036
1020
1040
1025
230
116
104
108
120
101
1100
11
8
0
152
1032
132
137
133
144
230
0
2 PV
2 PV
2 PV
2 PV
2 PV2 PV2 PV2 PV1 PV
2 PV 2
P
V
1 PV
2 PV2 PV2 PV1 PV2 PV2 PV2 PV
2
P
V 2 PV2 PV2 PV2 PV2 PV2 PV2 PV1 P
V
2 PV
2 PV 2 PV2 PV1 PV2 PV
2 PV
2 PV
2 PV
2 PV 2 PV2 PV2 PVB PH
ASE
B PHAS
E
B
P
H
A
S
EB PHASEB PHASEB 15IC: C 15
A 15A 15
B 15
C 15
2166474
-7275
2166474
-7282
2166474
-7366 2166474-82902166475-761721664
7
5
-7626
2166475-772521664
7
5
-8032
216
6
4
7
5
-82
4
6
2166475-80422166474-89902166474
-9874
216747
4
-0068
3932425-36671082166475-89182166475
-9948
2167475
-0122
2167475
-0202
2167475
-0208
3296990
-09695389
3297035
-09695298
3296974
-09695364
3296969
-09695392
3297022
-09695280
3297034
-09695209
3297056
-09695150
3297055
-09695203
3297094
-09695314
3297087
-09695340
3297108
-09695388
3297130
-09695409
3297208
-09695462
3297177
-09695486
3297155
-09695483
3297106
-09695480
3297089
-09695459
3297043
-09695482
3297048
-09695459
3297007
-09695458
3296983
-09695479
3297249
-09695473
3296957
-09695429>>>>>>>>>>
>>>>>>>>>>>>>>>>>>>>>>>>>>>>
>>>>>>>>>>>>>>>>>>V?
V?
V?
V?
V?
V?
V?
V?
V?
V?
V?
V?V?
V?
V?
V?V?
V?
V?
V?
V?
V?
V?
V?
V?
V?
V?V?
V?
V?
V?
V?
V?
V?
V?
V?
V?
V?
V?V?
V?
V?
V?
V?
V?
V?
V?
V?
V?
V?
V?
V?
V?
V?V?V?
1
2
3
4
5
6
11
12
13
15
16
17
18
19
20
2122
23
24
25
26
37
38
39
40
41
42
43
44
45
46
47
48
50
51
52
53
54
55
56
57
62
63
64
65
66
67
68
69
70
71
72
73
74 75
76
I: 45'/3 W P
I: PR 2" PVC
I: FC 100A
I: 2 IN
I: [300960 X]
I: PAD
I: 2 IN
I: 3 IN
I: 3 IN
I: 2 IN
I: 100 KVA
I: PAD
I: 2 IN
I: 3 IN
I: 3 IN
I: FI
I: [300960 X]
I: PAD
I: 2 IN
I: 3 IN
I: 3 IN
I: [300960 X]
I: PAD
I: 2 IN
I: 3 IN
I: 3 IN
I: FI
I: 100 KVA
I: PAD
I: 3 IN
I: 3 IN
I: 3 IN
I: 2 IN
I: 100 KVA
I: PAD
I: 2 IN
I: 3 IN
I: 3 IN
I: 3 IN
I: 2 IN
I: FI
I: [300960 X]
I: PAD
I: 2 IN
I: 3 IN
I: 3 IN
I: 100 KVA
I: PAD
I: 3 IN
I: 3 IN
I: 3 IN
I: 2 IN
I: 2 IN
I: FI
I: SB17X30X18
I: SB17X30X18
I: 2 IN
I: SB17X30X18
I: 3 IN
I: SB17X30X18
I: SB17X30X18
I: SB17X30X18
I: SB17X30X18
I: 2 IN
I: SB17X30X18
I: SB17X30X18
I: SB17X30X18
I: SB17X30X18
I: SB17X30X18
I: 2 IN
I: 2 IN
I: SB17X30X18
I: 2 IN
I: SB17X30X18
I: 3 IN
I: SB17X30X18
I: SB17X30X18
I: SB17X30X18
I: SB17X30X18
I: 3 IN
I: SB17X30X18
I: SB17X30X18
I: SB17X30X18
I: 2 IN
I: SB17X30X18
I: 3 IN
I: 3 IN
I: 3 IN
I: 3 IN
I: SL LED
I: SL STD 14'
I: SL LED
I: SL STD 14'
I: 2 IN
I: SL LED
I: SL STD 14'
I: SL LED
I: SL STD 14'
I: SL LED
I: SL STD 14'
I: SL LED
I: SL STD 14'
I: SL LED
I: SL STD 14'
I: SL LED
I: SL STD 14'
I: 2 IN
I: 2 IN
I: 2 IN
I: 2 IN
I: PRIBOX
I: 2 IN
I: SL LED
I: SL STD 14'
I: 25 KVA
I: PAD
I: 2 IN
I: 3 IN
I: FI
I: SB17X30X18
I: 2 IN
I: 45'/3 W P
I: DG 5/16
I: PR 2" PVC
I: FC 100A I: 2 IN
NORTH
NOTES TO CONSTRUCTION CREWS:
ALL 1-PHASE UG PRIMARY CONDUCTOR IS 1/0 AL TRXLPE
ALL XFMR TYPE 1
ALL SECONDARY CONDUCTOR IS 4/0 AL TPX UNLESS
OTHERWISE NOTED
2" CONDUIT FOR 1-PHASE PRIMARY CONDUCTOR
3" CONDUIT FOR SECONDARY CONDUCTOR
NOTES TO CONSTRUCTION CREWS:
ANY LOCATION WHERE PRIMARY
CONDUCTOR RUNS PARALLEL TO ITSELF
MUST EITHER BE ENCASED IN RED-DYED
CONCRETE OR HAVE MINIMUM OF 5 FEET
SEPARATION
FEEDER ID: VLYRN2953 SYSTEM VOLTAGE: 24.9KV
VOLTAGE LINE TO GROUND: 14.4 KV
PROTECTIVE DEVICE
TYPE: 80A FUSE
FEATURE ID: 125947796
SUBSTATION BREAKER: 125775388
PROJECT LEAD: RAFIK BENSALEM
TELEPHONE: 774-643-1817
EMAIL: Rafik.Bensalem@powereng.com
DESIGNER: ROLANDO FERNANDEZ
TELEPHONE: 210-951-0766
EMAIL: Rolando.Fernandez@powereng.com
NEW 45 FT CLASS 3
RISER POLE WITH 50A
RISER FUSE
INSTALL NEW SINGLE-PHASE
(B)OH CONDUCTOR
#2AAAC - PRIMARY
#2AAAC - NEUTRAL
EXISTING 3PH
795AAC OH LINE
MAINTAIN 5FT SEPARATION
BETWEEN CONDUCTORS
ON SAME PHASE
EXTEND CONDUIT FOR
FUTURE DEVELOPMENT
SINGLE-PHASE
PRIMARY PULL BOX