Loading...
Amberpoint BP-CS011212Halff Associates, Inc. ENGINEERS ARCHITECTS SCIENTISTS PLANNERS SURVEYORS 8616 Northwest Plaza Drive Dallas, Texas 75225-4292 (214) 346-6200 Fax (214) 361-5573 LETTER OF TRANSMITTAL TO: Kenneth M. Griffin, P.E. DATE: City of Coppell Director of Engineering & Public Works 255 Parkway Coppell, Texas 75019 FROM: Jaime R. Beard Emaih jbeard @ halff.com December 12, 2001 AVO: 19944 PROJECT: AmberPoint at Coppell WE ARE SENDING YOU X ,ATTACHED [] Shop Drawings [] Prints X [] Copy of letter [] Change order [] [] Under separate cover via __ the following: Plans [] Drawings X Specifications Other: THESE ARE TRANSMITTED as checked below: X For approval [] Approval as submitted [] For your use [] Approved as noted [] As requested [] Returned for corrections For review/comment [] Other: ITEMS SENT: For Submittal: 3-sets of grading and erosion control plans for early grading release / permit on Bldg. 1 of Amberpoint Business Park at Coppell including the detention pond on Lot 2. ~,O/o ~ CO ME.TS: }Zy Mr. Griffin [] Resubmit copies for approval [] Submit copies for distribution [] Return __ corrected prints iz- I'1- We are submitting the above referenced plans to attain an early grading release as mentioned. Full engineering plans for Bldg. 1 and the Northpoint drive extension were submitted for review on November 16. If possible, Transwestern would like to begin earthwork for building 1 and the detention pond in the very near future (possibly sometime next week). If you have any questions or comments please call me at (214) 346-6324. Thank you for your attention to this matter. X OWNER []CONTRACTOR