Loading...
Town Center L4B1-LR011220ALPHA TESTING, INC. 2209 Wisconsin St., Suite 10 Dallas, Texas 75229 (972) 620-8911 Concrete Compression Test Report Teated For: CONSTRUCTION MANAGEMENT GROUP A'I-I'N: MR. JEFF MILLER 5207 MCKINNEY AVENUE. SUITE 12 DALLAS, TX 75205 Fax Number: (214) 521-1279 ., 120 .._ ENTO" TAPP- COPPE'L, T× Our Report No.: 01612-40 Issue Date: 12/2012001 HELD DA TA Placement Location: Date Placed: Time Placed: Slump (ASTM C-t43): Air Content: Air Temperature: Specimen Temperature: Date Received: Delivery Method: Field Date Submitted By:. Mix Date Submitted By: SIDEWALK, 84~N & 22'S FROM THE SW CORNER OF THE BUILDING 11121101 10:35 AM 4.75 5.2 (ASTM C-173) 47 56 11/22/01 PICKED UP BY ALPHA MALEY, DENNIS BEALL Plant Number: 13-3000 Delivery Ticket No.: 13501707 Made By:. ALPHA Cured SpeclBcatlon: ASTM C-31 CYLINDER COMPRESSION TEST RESULTS Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: ~/pe: Spec: Tested: (Days): Length Width Diamater Sq. In. Load: PSI: 68 LAB C-1231 11/28/01 7 12 N/A 6 28.27 83670 2950 69 LAB C-1231 12/19101 28 12 NIA 6 28.27 88390 3120 70 LAB C-1231 12/19/01 28 12 N/A 6 28.27 92290 3260 71 LAB HOLD HOLD 12 N/A 6 28.27 0 Spaclflcetlona: 28 3000 __ PASS Results to Date: CC: HiS. CITY OF COPPELL, CONSTRUCTION MANAGEMENT GROUP Respectfully Submitted By: /~ -~ of Alpha Testing. Inc. Our ~est resu~ and .pons are for the exclusive ~se o;~l~ee ~l~and their designated receplents on file In our office, and shall ~ot be repr .oduce .d an d/or. db~bu~eadn ~ex,;; Pt observed, and are nm Indicative of the cluali~es of apparently identical or slmlbr specimens.