Hollows Lots 1R1-1R3-CS220519
May 19, 2022
AAA Home Builder
Attn: Sam Naser
1525 Flower Dr
Carrollton, Tx 75007
RE: Final Acceptance Letter: Hollows @ Northlake Woodlands
Dear Sam Naser
Representatives of the City of Coppell have confirmed a final inspection of paving and
utilities for the referenced project. The two-year maintenance bonds have been received.
Maturity on the bonds will be two years from the date of this letter.
You may notify MS4 (City of Coppell) at any time during the two-year maintenance
period if stabilization of the site per the SWPPP permit can be demonstrated. If so,
complete and submit a Notice of Termination (NOT) to discontinue coverage under the
SWPPP permit.
A follow up inspection of the facilities will be conducted prior to the lapse of the two-
year bond period. If any punch list items are noted at that time, you will be contacted to
make repairs.
Sincerely,
Corey Bufford
Construction Inspector II
(469) 858-2006
cbufford@coppelltx.gov
cc:
Kent Collins, P.E., Director of Public Works
Michael Garza, P.E., Assistant Director of Public Works
Jamie Brierton, Project Manager
Steve Schubert, Chief Building Official
Tim Oates, Deputy Fire Chief
Kim Tiehen, Director of Finance