Loading...
Hollows Lots 1R1-1R3-CS220519 May 19, 2022 AAA Home Builder Attn: Sam Naser 1525 Flower Dr Carrollton, Tx 75007 RE: Final Acceptance Letter: Hollows @ Northlake Woodlands Dear Sam Naser Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for the referenced project. The two-year maintenance bonds have been received. Maturity on the bonds will be two years from the date of this letter. You may notify MS4 (City of Coppell) at any time during the two-year maintenance period if stabilization of the site per the SWPPP permit can be demonstrated. If so, complete and submit a Notice of Termination (NOT) to discontinue coverage under the SWPPP permit. A follow up inspection of the facilities will be conducted prior to the lapse of the two- year bond period. If any punch list items are noted at that time, you will be contacted to make repairs. Sincerely, Corey Bufford Construction Inspector II (469) 858-2006 cbufford@coppelltx.gov cc: Kent Collins, P.E., Director of Public Works Michael Garza, P.E., Assistant Director of Public Works Jamie Brierton, Project Manager Steve Schubert, Chief Building Official Tim Oates, Deputy Fire Chief Kim Tiehen, Director of Finance