WA20-02-CS240522
Clark Electric, Inc. Date: May 22, 2024
246 South Collins Road
Sunnyvale Tx. 75182
RE: Final Acceptance Letter
Village Parkway Pump Station Standby Generator
Dear Josh Clark:
Representatives of the City of Coppell have confirmed a final inspection of the
construction work for the referenced project. The two-year maintenance bonds have been
received. Maturity on the bonds will be two year from the date of this letter.
If applicable, you may notify MS4 (City of Coppell) at any time during the two-year
maintenance period if stabilization of the site per the SWPPP permit can be
demonstrated. If so, complete and submit a Notice of Termination (NOT) to discontinue
coverage under the SWPPP permit.
A follow-up inspection of the facilities will be conducted prior to the lapse of the one-
year bond period. If any punch list items are noted at that time, you will be contacted to
make repairs.
Sincerely,
Darryl Zbranek
Construction Manager
(469) 507-9095
dzbranek@coppelltx.gov
cc:
Michael Garza, P.E., Director of Public Works
Aaron Tainter, P.E., Assistant Director of Public Works
Steve Schubert, Chief Building Official
Tim Oates, Deputy Fire Chief
Jennifer Miller, Finance Director