Town Center BP-LR010515CONCRETE COMPRESSIVE STRENGTH TEST
8901 Carpenter Frwy., Suite #10(3
Report Number: 94001422.0012 Dallas, Texas 75247
Service Date: May 3, 2001 (214) 630-101o
Client:
Excel Group, Inc.
Attn: Bnjan Peck
2639 Walnut Hill Ln #218
Dallas TX 75229
Report Date: May 15, 2001
Project: Town Center Business Park
205 East Parkway Blvd
Coppell, Texas
Project Number: 94001422
Material Information
Specified Strength: 4000 psi @ 28 Days
Batch Time: 9:00am
Supplier: Redi-Mix
Truck No: 217
Mix I.D. No.: 732
Plant: 10
Field Test Data
Test
Slump, inches:
Air Content, %:
Concrete Tempemtum, O F:
Ambient Temperature,o F:
Plastic Unit Weight, pcf:
Laboratory Test Data
Ticket No: 16232
Sample Information
Sample Time: 10:1Sam
Technician: Albert Garcia
Weather Conditions: Cloudy
Accumulative Yards: 10
Placement Method: Direct discharge
Sample Locations: South approach
Placement Location: Approaches
North & South
Result Specification Test Method
5.50 3-5 ASTM C-143
5.3 3-6 ASTM C-172
82 ASTM C-39
74
Age at Maximum Compressive
Set Specimen Diameter Date Test Load Strength
No. ID (inches) Tested (days) (lbs) (psi)
I 1 6.00 05/10/2001 7 98,340 3,480
1 2 6.00 05/10/2001 7 97,530 3,450
Average 3,470
1 3 05/31/2001 28
1 4 05/31/2001 28
Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive
strength samples.
Technician: Albert Garcia
Report Distribution:
(1) Excel Group, thC.
(1) City of Coppell - Engr Dept
(1) City of Coppell - Bldg Insp
Reviewed by:
Edc J. Cleveland, P.E
Senior Project Engineer
The tests were performed in general accordance with applicable ASTM test methods. This report is exclusively for the use of the crient indicated above
~S~l=lt esr ~beatret hPre i°d(~ca t jCedone ( sXTrPet fie~efUnlcl e~ltt ha ~ dUtatrtee n otWdttn~rr ic~aln~lfi Tca~ivr r aee oC~nt~l eTp reS~i~ee~iUes~ ot fr aol~ emrit ta p~pahr~r~t i; asi emil°anriYo~ idPPelintiCa~c~l? tm°a~t he~ia~sC~ual
Page 1 of 1