Loading...
Town Center BP-LR010515CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #10(3 Report Number: 94001422.0012 Dallas, Texas 75247 Service Date: May 3, 2001 (214) 630-101o Client: Excel Group, Inc. Attn: Bnjan Peck 2639 Walnut Hill Ln #218 Dallas TX 75229 Report Date: May 15, 2001 Project: Town Center Business Park 205 East Parkway Blvd Coppell, Texas Project Number: 94001422 Material Information Specified Strength: 4000 psi @ 28 Days Batch Time: 9:00am Supplier: Redi-Mix Truck No: 217 Mix I.D. No.: 732 Plant: 10 Field Test Data Test Slump, inches: Air Content, %: Concrete Tempemtum, O F: Ambient Temperature,o F: Plastic Unit Weight, pcf: Laboratory Test Data Ticket No: 16232 Sample Information Sample Time: 10:1Sam Technician: Albert Garcia Weather Conditions: Cloudy Accumulative Yards: 10 Placement Method: Direct discharge Sample Locations: South approach Placement Location: Approaches North & South Result Specification Test Method 5.50 3-5 ASTM C-143 5.3 3-6 ASTM C-172 82 ASTM C-39 74 Age at Maximum Compressive Set Specimen Diameter Date Test Load Strength No. ID (inches) Tested (days) (lbs) (psi) I 1 6.00 05/10/2001 7 98,340 3,480 1 2 6.00 05/10/2001 7 97,530 3,450 Average 3,470 1 3 05/31/2001 28 1 4 05/31/2001 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Albert Garcia Report Distribution: (1) Excel Group, thC. (1) City of Coppell - Engr Dept (1) City of Coppell - Bldg Insp Reviewed by: Edc J. Cleveland, P.E Senior Project Engineer The tests were performed in general accordance with applicable ASTM test methods. This report is exclusively for the use of the crient indicated above ~S~l=lt esr ~beatret hPre i°d(~ca t jCedone ( sXTrPet fie~efUnlcl e~ltt ha ~ dUtatrtee n otWdttn~rr ic~aln~lfi Tca~ivr r aee oC~nt~l eTp reS~i~ee~iUes~ ot fr aol~ emrit ta p~pahr~r~t i; asi emil°anriYo~ idPPelintiCa~c~l? tm°a~t he~ia~sC~ual Page 1 of 1