Lakeside V2 Fuel Station-PT 240513Page 1 of 3CONS23-10-029610
CONSTRUCTION DEVELOPMENT PERMIT
Name of Applicant Date SubmittedClay Cristy 10/16/2023
Address of Applicant 1903 Central DR, Bedford, 76021
Phone Number Email817-281-0572 clay@claymooreeng.com
Project Name
Description Kroger Fuel Center (Lakeside Village Phase II, Lot 2R)
Location of Construction 950 E SANDY LAKE RD, Coppell,
Subdivision AcreageLakeside Village Phase II 7
Section Block Lot 2R
Location Description 950 E Sandy Lake Road - A part of the existing Kroger Development.
1. Type of proposed construction or development:
Non-Residential
2. Description of Construction Permit requested:
: Excavation, Fill Area, Fire Lane, Parking Lot, Paving, R.C.P., Sidewalk
Provide an attachment containing the name and 24-hr. contact phone number
of supervisor(s) for every contractor working under this general permit.
3. All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision
Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The
contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance.
Amount Due: Date Paid:
> Any work requiring closure of a lane of traffic, street, or alley must be approved in advance by the
Engineering Dept., with notification to the following prior to closure:
Police Department @ 972-304-3600
Fire Department @ 972-304-3512
Street Department @ 972-462-5150
Engineering Dept. @ 972-304-3679
NOTE: Street closures are allowed from 9:00 a.m. until 3:30 p.m. ONLY
unless otherwise approved by City Engineer.
> Provide barricade plan / trench safety plan of a lane or street closure. (Required)
> It is a requirement of this permit that As-Built Drawings be turned in at the end of this project.
As-Builts consist of a .pdf and CD with Autocad .dwg files.
Printing your name indicates your acceptance of the terms and conditions of this form:
$5,981.13 3/11/24
Page 2 of 3CONS23-10-029610
Clay Cristy
Signature of Applicant Contact Number
817-281-0572
Signature of Inspector Contact Number
NoIs the fill area located in an identified flood hazard area?
FOR CITY USE ONLY
If YES, a Floodplan Development Permit is required before any construction can begin.
Has a Floodplain Development Permit been issued?No
City Approval Date
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or
cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking,
excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is
granted.
Rev. 12-2023
Review and Inspection Fee Calculation Sheet
Project Name: Date:
Per the City of Coppell Subdivision Regulations, the Developer shall pay review and inspection fees for the items to be
reviewed and inspected by the Engineering Department. Review fees are charged at $150/hr with a 4-hour minimum
based on the rates below. Inspection fees are charged at $120/hr with a 4-hour minimum based on the rates below.
Review fees are due upon permit submittal. Inspection fees are due before the date of the Pre-construction Meeting.
Quantity Review Fee
Rate
Calculated
Review Fee
Inspection
Fee Rate
Calculated
Inspection Fee
Paving Improvements SF
Drainage Improvements LF
Utility Improvements LF
Sidewalk Improvements SF
Grading Improvements SF
Utility Taps Per Table
Below Per Table
Below
Public Infrastructure Not
Listed (hours estimated
at time of submittal)
Review:
Inspection:
Total:
Water Service and Tap Quantity Review
Fee Rate
Calculated
Review Fee
Inspection
Fee Rate
Calculated
Inspection Fee
- Up to 2 Inches
- 3 to 6 Inches
- 8 Inches and Larger
Sewer Service and Tap
Additional reviews after 3 reviews ( of original review fee): _____________
Major plan revision ( of original review fee): _____________
Additional final walkthrough inspection (4 hours): $480.00
hr
hr
Kroger 448 Coppell 3/7/2024
$0.03/SF $749.34 $0.12/SF $2,997.36
$1.50/LF $354.00 $1.20/LF $283.20
$0.75/LF $233.25 $1.20/LF $373.20
$0.075/SF $0.38 $0.48/SF $2.40
$0.002/SF $52.00 $0.006/SF $156.00
$300.00 $480.00
$150/hr $0.00 $120/hr $0.00
$1,688.97 $4,292.16
1 $300 $300.00 $480 $480.00
$450 $0.00 $720 $0.00
$600 $0.00 $960 $0.00
$300 $0.00 $480 $0.00
$337.79
$844.48
24,978
236
311
5
26,000
20%
50%