Loading...
Blackberry Farm-CS241115SWF-2013-00090: Blackberry Farms Area 1 Authorized Impacts: •9/26/2023: 170 LF (0.04 acre) Unauthorized Impacts: •+ 135 LF (L) x 13.5 LF (W) = 0.04 acre Area 2 Authorized Impacts: •9/26/2023: 58 LF (0.01 acre) Unauthorized Impacts: •+ 39 LF (0.01 acre) Area 3 Authorized Impacts: •9/26/2023: 218 LF (0.05 acre) Unauthorized Impacts: •+ 230 LF (0.05 acre) Area 4 Authorized Impacts: •N/A Unauthorized Impacts: •+ 104 LF (0.02 acre) Area 5 Authorized Impacts: •N/A Unauthorized Impacts: •+ 173 LF (0.08 acre) Area 6 Authorized Impacts: •N/A Unauthorized Impacts: •+ 52 LF (0.01 acre) Area 7 Authorized Impacts: •04/28/2020: •Aerial Crossing:0.003 acre •Bridge Gabion: 0.03 acre •Bridge Support:0.002 acre Unauthorized Impacts: •+ 115 LF (L) x 10 LF (W) = 0.02 acre Area 8 PFO Wetlands Authorized Impacts: •03/11/2014: 0.45 acre (0.303 acre filled) •04/28/2020:0.303 acre (reauthorization) Unauthorized Impacts: •N/A BlackberryFarm,Coppell,TX USACEPROJECTNOSWF-2013-00090 ErosionControl Structure LinearFeetof Impact Acresof Impact LinearFeetof Impact Acresof Impact LinearFeetof Impact Acresof Impact Area1 170 0.04 135 0.04 305 0.08 Area2 58 0.01 39 0.01 97 0.02 Area3 218 0.05 230 0.05 448 0.10 Area4 0 0 104 0.02 104 0.02 Area5 0 0 173 0.08 173 0.08 Area6(AerialWastewater)0 0.003 52 0.01 52 0.013 Area7(BridgeStructure)395 0.052 115 0.02 510 0.072 Area8(ForestedWetland)0 0.303 0 0.00 0 0.303 Totals 841 0.458 848 0.23 1689 0.686 Authorized Unauthorized Total