Subaru Expansion-PT231120Page 1 of 3CONS22-09-025708
CONSTRUCTION DEVELOPMENT PERMIT
Name of Applicant Date SubmittedCasey King 9/15/2022
Address of Applicant 1201 North Bowser Road, Richardson, TX 75081
Phone Number Email(214) 217-6633 casey.king@halff.com
Project Name
Description Subaru Building Expansion (Prologis Park One Twenty One, Lot 4R, Block A)
Location of Construction 360 N FREEPORT PKWY, Coppell,
Subdivision AcreagePrologis Park One Twenty One 26
Section Block LotA 4R
Location Description The project is located at the Subaru of America facility in Coppell, Texas, which can be found at
360 Freeport Parkway, Coppell, Texas. The scope of this project is to construct an extension to
the existing building.
1. Type of proposed construction or development:
Non-Residential
2. Description of Construction Permit requested:
: Drive Approach, Excavation, Fill Area, Fire Lane, Flume, Inlet, Median or Landscape, Parking Lot, Paving, R.C.P.,
Sidewalk, Slope Protection/Retaining Wall, Water Main
Provide an attachment containing the name and 24-hr. contact phone number
of supervisor(s) for every contractor working under this general permit.
3. All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision
Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The
contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance.
Amount Due: $36,416.74 Date Paid: 11/15/2023
> Any work requiring closure of a lane of traffic, street, or alley must be approved in advance by the
Engineering Dept., with notification to the following prior to closure:
Police Department @ 972-304-3600
Fire Department @ 972-304-3512
Street Department @ 972-462-5150
Engineering Dept. @ 972-304-3679
NOTE: Street closures are allowed from 9:00 a.m. until 3:30 p.m. ONLY
unless otherwise approved by City Engineer.
> Provide barricade plan / trench safety plan of a lane or street closure. (Required)
> It is a requirement of this permit that As-Built Drawings be turned in at the end of this project.
As-Builts consist of a .pdf and CD with Autocad .dwg files.
Page 2 of 3CONS22-09-025708
Printing your name indicates your acceptance of the terms and conditions of this form:
Casey King
Signature of Applicant Contact Number
(214) 217-6633
Signature of Inspector Contact Number
NoIs the fill area located in an identified flood hazard area?
FOR CITY USE ONLY
If YES, a Floodplan Development Permit is required before any construction can begin.
Has a Floodplain Development Permit been issued?No
City Approval Date
11/20/2023
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or
cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking,
excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is
granted.
Page 3 of 3CONS22-09-025708
INSPECTION FEE CALCULATION SHEET
Project Name Date 11/20/2023
As per the City of Coppell Subdivision Regulations, the Developer shall pay 4% of the cost of the items to be permitted and
inspected by the Engineering Department and dedicated to the City. The Developer shall pay 3% of the items to be inspected
by the Engineering Department, but not dedicated to the City such as parking lots, private utilities, private drainage systems
and so forth. Inspection fees are due on or before the date of the Pre-construction Meeting.
The fees shown below have been calculated based on the development contract or cost estimate provided by the
developer.
Paving
Grading
Water
Sanitary Sewer
Storm Sewer
Alleys
Sidewalks
Other
PUBLIC IMPROVEMENTS
CONTRACT AMOUNT
$0.00
$0.00
$0.00
$1,983.00
$12,790.00
$0.00
$0.00
$0.00
X 4% =
$0.00
$0.00
$0.00
$79.32
$511.60
$0.00
$0.00
$0.00
$1,123,121.00
$0.00
$68,374.00
$2,699.00
$0.00
$0.00
$0.00
$0.00
X 3% =
$33,693.63
$0.00
$2,051.22
$80.97
$0.00
$0.00
$0.00
$0.00
Total $14,773.00 $590.92 $1,194,194.00 $35,825.82
PRIVATE IMPROVEMENTS
CONTRACT AMOUNT
Grand Total (total of
both colored fields)$36,416.74