Loading...
Subaru Expansion-PT231120Page 1 of 3CONS22-09-025708 CONSTRUCTION DEVELOPMENT PERMIT Name of Applicant Date SubmittedCasey King 9/15/2022 Address of Applicant 1201 North Bowser Road, Richardson, TX 75081 Phone Number Email(214) 217-6633 casey.king@halff.com Project Name Description Subaru Building Expansion (Prologis Park One Twenty One, Lot 4R, Block A) Location of Construction 360 N FREEPORT PKWY, Coppell, Subdivision AcreagePrologis Park One Twenty One 26 Section Block LotA 4R Location Description The project is located at the Subaru of America facility in Coppell, Texas, which can be found at 360 Freeport Parkway, Coppell, Texas. The scope of this project is to construct an extension to the existing building. 1. Type of proposed construction or development: Non-Residential 2. Description of Construction Permit requested: : Drive Approach, Excavation, Fill Area, Fire Lane, Flume, Inlet, Median or Landscape, Parking Lot, Paving, R.C.P., Sidewalk, Slope Protection/Retaining Wall, Water Main Provide an attachment containing the name and 24-hr. contact phone number of supervisor(s) for every contractor working under this general permit. 3. All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance. Amount Due: $36,416.74 Date Paid: 11/15/2023 > Any work requiring closure of a lane of traffic, street, or alley must be approved in advance by the Engineering Dept., with notification to the following prior to closure: Police Department @ 972-304-3600 Fire Department @ 972-304-3512 Street Department @ 972-462-5150 Engineering Dept. @ 972-304-3679 NOTE: Street closures are allowed from 9:00 a.m. until 3:30 p.m. ONLY unless otherwise approved by City Engineer. > Provide barricade plan / trench safety plan of a lane or street closure. (Required) > It is a requirement of this permit that As-Built Drawings be turned in at the end of this project. As-Builts consist of a .pdf and CD with Autocad .dwg files. Page 2 of 3CONS22-09-025708 Printing your name indicates your acceptance of the terms and conditions of this form: Casey King Signature of Applicant Contact Number (214) 217-6633 Signature of Inspector Contact Number NoIs the fill area located in an identified flood hazard area? FOR CITY USE ONLY If YES, a Floodplan Development Permit is required before any construction can begin. Has a Floodplain Development Permit been issued?No City Approval Date 11/20/2023 Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. Page 3 of 3CONS22-09-025708 INSPECTION FEE CALCULATION SHEET Project Name Date 11/20/2023 As per the City of Coppell Subdivision Regulations, the Developer shall pay 4% of the cost of the items to be permitted and inspected by the Engineering Department and dedicated to the City. The Developer shall pay 3% of the items to be inspected by the Engineering Department, but not dedicated to the City such as parking lots, private utilities, private drainage systems and so forth. Inspection fees are due on or before the date of the Pre-construction Meeting. The fees shown below have been calculated based on the development contract or cost estimate provided by the developer. Paving Grading Water Sanitary Sewer Storm Sewer Alleys Sidewalks Other PUBLIC IMPROVEMENTS CONTRACT AMOUNT $0.00 $0.00 $0.00 $1,983.00 $12,790.00 $0.00 $0.00 $0.00 X 4% = $0.00 $0.00 $0.00 $79.32 $511.60 $0.00 $0.00 $0.00 $1,123,121.00 $0.00 $68,374.00 $2,699.00 $0.00 $0.00 $0.00 $0.00 X 3% = $33,693.63 $0.00 $2,051.22 $80.97 $0.00 $0.00 $0.00 $0.00 Total $14,773.00 $590.92 $1,194,194.00 $35,825.82 PRIVATE IMPROVEMENTS CONTRACT AMOUNT Grand Total (total of both colored fields)$36,416.74