Loading...
Carrollton-FB ISD-PT250128A copy of the approved permit must be on the job site at all times Page 1 ofRIGHT-OF-WAY USE PERMIT APPLICATION Rev.08/2020 Permit Valid for Days From Date of Approval All activity authorized by this permit shall be in accordance with the City of Coppell Public Rights-of-Way Management ordinance No. 2001-944 Date of Submittal:__________________ Applicant’s Job # / Work Order #_____________________ Project Name / Location and Address:__________________________________________________ Permit Fee: $100.00 (No fee for applications submitted on behalf of Utility Companies with a current Public Rights-of-Way Management Ordinance Registration).S.P.C.O.A. Certificate #____________________ Utility Company Information: Oncor Electric Delivery Atmos Energy Frontier Spectrum Level 3 Other:________________________________________________________ Utility Company Representative:____________________________________________________ E-mail Address:__________________________________Telephone:______________________ Contractor Information: General Contractor:______________________________________________________________ General Contractor Representative:_________________________________________________ E-mail Address:__________________________________Telephone:______________________ Project Information: General Description of Proposed Construction (Attach Estimated Start Date:_______________ Estimated Completion Date:_________________ Has and/or utility companies been contacted 48 hours prior to locate existing utilities? Yes No If No, state reason:_________________________________________________ Is removal of existing streets, alleys or sidewalks necessary? Yes No If YES, repair must have a City inspection prior to completion. Call 972-304-3679. Is closure of any traffic lanes or driveway approaches necessary? Yes No If YES, a traffic control plan in accordance with TMUTCD standards must be submitted, and the following departments must be notified of the location and duration of the closure: Police Department, 972-304-3600 Fire Department, 972-304-3512 Street Department, 972-462-5150 Engineering Department, 972-304-3679 Traffic lane closures are allowed from 9:30 a.m until 3:30 p.m. ONLY unless otherwise approved by the City Engineer. Work activity is permitted from 7:00 a.m. until 7:00 p.m., Monday through Friday only 01/23/2025 24083.1.9 272 South MacArthur Blvd, Coppell, TX Right of Way Use Permit Application Page 2 of 5 This application, with signatures of Utility and Contractor representatives, must be submitted to the Engineering Department for approval prior to commencing work. Printing your name and date on this form indicates your acceptance of the terms and conditions of this application. Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand, or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. ________________________________________ ___________________________________ Signature of Utility Company Representative Date ________________________________________ ___________________________________ Signature of Contractor Representative Date ________________________________________ ___________________________________ APPROVED City Representative Date DENIED Comments: E-mail address to return completed permit:__________________________________________________ Submit permit application by e-mail to engineer@coppelltx.gov, or deliver application to the Engineering Department, Town Center Business Park, 265 E Parkway Blvd, Coppell, TX 75019 SUMMARY OF REQUIREMENTS FOR WORK WITHIN THE CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS 1.A copy of the valid approved City of Coppell permit is required on the project site at all times. 2.Property owners (commercial and residential) adjacent to the project must be notified of the project timeline and provided contractor names and phone numbers. No access to private property without prior coordination with property owner. 3.Proper erosion control measures must be taken, in accordance with the Coppell Erosion Control Ordinance No. 91-514. 4.Follow Texas MUTCD standards for work in traffic zones. Lane closures require the use of a flashing arrow board for advance warning. 5.Grading shall be restored or improved, and sod replaced when necessary. 07/25/2024 07/25/2024 aaristizabal@veronetworks.com & angelo@tgainc.net 01/28/2025Scott Latta X CONTACT CITY OF COPPELL ROW INSPECTOR AVERY DAVIS (469-858-2006, adavis@coppelltx.gov) AT LEAST 48 HOURS PRIOR TO ANY CONSTRUCTION ACTIVITY Right of Way Use Permit Application Page 3 of 5 6.Irrigation repairs must be performed in a timely manner. 7.Follow OSHA trench safety guidelines at all times. 8.Repair existing utilities that are damaged, including but not limited to: Clean-outs, water valves, wastewater manholes, water lines, wastewater lines and storm sewer lines. 9. Density tests may be required, at applicant’s expense, in trench lines (ASTM). 10.Protection and repair of traffic control devices and signage is the responsibility of the contractor. 11.No work is to be done in collector roadways before 9:30 a.m. or after 3:30 p.m. 12.Prior request of work activity on weekends and holidays must be submitted in writing. 13.Utility line locates must be performed in advance of construction by calling 811 or logging on to the Texas811 Portal at: http://www.texas811.org. Additional utility contacts are as follows: COPPELL PUBLIC WORKS - OPERATIONS COPPELL PUBLIC WORKS - ENGINEERING 972-304-3679 DENTON COUNTY LEVEE DISTRICT 972-315-5019 T.C.E.Q. Region 4 817-588-5800 IRVING WATER UTILITIES 972-721-2281 ATMOS ENERGY 888-286-6700 EXPLORER PIPELINE 918-493-5100 ONCOR ELECTRIC DELIVERY 888-313-6862 972-462-5150 HOMEOWNER ASSOCIATIONS Planning Department: H.O.A. List F.E.M.A. 940-898-5399 DALLAS WATER UTILITIES 214-670-5111 AT&T 800-924-9420 COSERV Gas & Electric 940-321-7800 FRONTIER COMMUNICATIONS 800-584-3384 SPECTRUM CABLE 833-780-1880 14. Debris must be removed from work area daily and disposed of properly outside the City. 15.Streets, sidewalks and alleys must be kept clear of construction materials and debris. 16.“Clean-up” requires returning work area to pre-construction condition or better. Dallas Water Utilities Engineering Services 2121 Main St., Suite 500 Dallas, Texas 75201 (214) 671-9538 CITY OF DALLAS January 21, 2025 Angelo Torio Tech Group & Associates 4016 Rowlett Rd Rowlett TX 75088 Re: E Sandy Lake Road, Coppell TX 75019 (24083.1.9_Riverchase ES_272 S MacArthur Blvd, Coppell Vero DWU XING – Starleaf St and E Sandy Lake Rd) 811 Ticket # 247-267- 7482 Dear Mr. Torio Dallas Water Utilities (DWU) has reviewed Tech Group & Associates request to bore over our 60-inch water transmission main located in E Sandy Lake Road Coppell Tx 75019 – corner of Starleaf St and E Sandy Lake Rd. DWU owns, operates, and maintains a 60-inch diameter PCCP water transmission main in this area as shown on DWU design sheet 685W0676_SH011. DWU has reviewed and takes no exception to the proposal of 2 – 1.5” HDPE conduits installed via horizontal directional bore. As shown in the attached drawings, the conduit will be installed at approximately a depth of 5 feet, maintaining 5.5 feet of cover over DWU 60-inch pipe. DWU requires that the contractor perform following when working around our pipes. 1. The location of DWU’s pipeline must be staked and flagged at all times. 2. Contractor shall contact “811” or 1-800-344-8377 48-hours prior to construction for line location services. 3. No piers or drilling of any kind shall be permitted within 20 feet of the existing water main. 4. No vertical structures including fencing and walls shall be built over the existing asset. 5. Only tracked equipment shall be used over the pipeline. No wheeled equipment shall be used unless otherwise approved by DWU. An engineering plan to protect DWU’s assets may need to be submitted to DWU for review and approval. Dallas Water Utilities Engineering Services 2121 Main St., Suite 500 Dallas, Texas 75201 (214) 671-9538 6. No equipment that is over H20 loading is allowed within the right-of-way or easement of DWU’s asset. An engineered matting plan may need to be submitted and approved by DWU for equipment passing over the asset. 7. DWU shall be contacted at 214-670-8963 48 hours prior to construction to schedule personnel to be present during the boring process. Sincerely, Leslie Castillo DWU Engineering Services CC: Luis Bodington, PE, Distribution Beau Burelsmith, Distribution Scott Latta, Coppell 1 Scott Latta From:Andrew Storer <astorer@cityofirving.org> Sent:Tuesday, September 10, 2024 9:45 AM To:Scott Latta; Ashley Waits; Steve Pettit Subject:RE: 24083.1.9_Riverchase ES_272 S MacArthur Blvd, Coppell_Vero Scott, We do not have any objections to the plans. Thank you for keeping us informed on this project. Andy Andrew Storer, P.E. | Senior Civil Engineer City of Irving | Water Utilities P: (972) 721-2790 From: Scott Latta <WLatta@coppelltx.gov> Sent: Monday, September 9, 2024 4:56 PM To: Andrew Storer <astorer@cityofirving.org>; Ashley Waits <awaits@cityofirving.org>; Steve Pettit <spettit@cityofirving.org> Subject: [External] RE: 24083.1.9_Riverchase ES_272 S MacArthur Blvd, Coppell_Vero USE CAUTION when clicking links & opening attachments! Good afternoon Andrew, We received the attached revised plans from TGA for the crossing at 1600 E Sandy Lake Rd. Let me know if IWU has any objections to the proposed conduit crossing. Thanks, Scott Latta Engineering Technician City of Coppell, TX 972-304-3683 (office) www.coppelltx.gov From: Andrew Storer <astorer@cityofirving.org> Sent: Friday, August 30, 2024 12:43 PM To: Scott Latta <WLatta@coppelltx.gov>; Ashley Waits <awaits@cityofirving.org>; Steve Pettit <spettit@cityofirving.org> Subject: RE: 24083.1.9_Riverchase ES_272 S MacArthur Blvd, Coppell_Vero Scott, We were contacted by TGA regarding the utility crossings of our main for this plan set as well as the adjacent project for the outdoor learning center. They have revised the plans and should be sending you updated documents with a change to the crossings. Thanks for keeping us updated on the work around our line and please let me know as soon as revised plans are submitted. 272 S MacArthur Blvd. IIIIIIIIIIII24083.1.9PV04!NOTE& FIELD EXPOSURES.UTILITY & R.O.W. REPRESENTED ONPLANS ARE BASED ON RECORDS. NOT ON BOUNDARY SURVEYESTIMATEDSHEET TOTALSE SANDY LAKE ROADSTARLEAF STREET272 SOUTH MACARTHUR BOULEVARDBUILDING CONNECTRIVERCHASE ELEMENTARY SCHOOL272 SOUTH MACARTHUR BOULEVARDCOPPELL, TEXASCOPPELL, TEXASC:\Land Projects\24083.1.9\24083.1.9pv.dwg, 11/14/2024 3:59:52 PM, Nayely Z 24083.1.9PF04!NOTE& FIELD EXPOSURES.UTILITY & R.O.W. REPRESENTED ONPLANS ARE BASED ON RECORDS. NOT ON BOUNDARY SURVEY272 SOUTH MACARTHUR BOULEVARDBUILDING CONNECTRIVERCHASE ELEMENTARY SCHOOL272 SOUTH MACARTHUR BOULEVARDCOPPELL, TEXASCOPPELL, TEXASC:\Land Projects\24083.1.9\24083.1.9pv.dwg, 11/14/2024 4:00:33 PM, Nayely Z