Loading...
Level 3-PT250203A copy of the approved permit must be on the job site at all times Page 1 of  RIGHT-OF-WAY USE PERMIT APPLICATION Rev.08/2020 Permit Valid for     Days From Date of Approval All activity authorized by this permit shall be in accordance with &+$37(5     RI WKH 7H[DV /RFDO *RYHUQPHQW &RGH DQG the City of Coppell Public Rights-of-Way Management ordinance No. 2001-944 Date of Submittal:__________________ Applicant’s Job # / Work Order #_____________________ Project Name / Location and Address:__________________________________________________ Permit Fee: $100.00 (No fee for applications submitted on behalf of Utility Companies with a current Public Rights-of-Way Management Ordinance Registration). S.P.C.O.A. Certificate # ____________________ Utility Company Information: Oncor Electric Delivery Atmos Energy Frontier Spectrum Level 3 Other:________________________________________________________ Utility Company Representative:____________________________________________________ E-mail Address:__________________________________Telephone:______________________ Contractor Information: General Contractor:______________________________________________________________ General Contractor Representative:_________________________________________________ E-mail Address:__________________________________Telephone:______________________ Project Information: General Description of Proposed Construction (Attach 3ODQ   3URILOH  6HH 3DJH   IRU ([DPSOH   Estimated Start Date:_______________ Estimated Completion Date:_________________ Has     and/or utility companies been contacted 48 hours prior to locate existing utilities? Yes No If No, state reason:_________________________________________________ Is removal of existing streets, alleys or sidewalks necessary? Yes No If YES, repair must have a City inspection prior to completion. Call 972-304-3679. Is closure of any traffic lanes or driveway approaches necessary? Yes No If YES, a traffic control plan in accordance with TMUTCD standards must be submitted, and the following departments must be notified of the location and duration of the closure: Police Department, 972-304-3600 Fire Department, 972-304-3512 Street Department, 972-462-5150 Engineering Department, 972-304-3679 Traffic lane closures are allowed from 9:30 a.m until 3:30 p.m. ONLY unless otherwise approved by the City Engineer.     Work activity is permitted from 7:00 a.m. until 7:00 p.m., Monday through Friday only    01/24/2024 TGA# 24189 100 South Royal Ln, Coppell, TX 'RPLQLTXH /XHYDQR 'RPLQLTXH /XHYDQR#OXPHQ FRP               )XWXUH ,QIUDVWUXFWXUH *UHJ +HQGULFNV JUHJ KHQGULFNV#SULP FRP                                    &RQWUDFWRU WR SODFH         +'3( ZLWK    ILEHU RSWLF FDEOH DQG   *$ WUDFHU ZLUH E\ GLUHFWLRQDO ERUH DORQJ 6 5R\DO /Q IRU     /)  &RQWUDFWRU WR DOVR SXOO    ILEHU FDEOH DORQJ 6 5R\DO /Q DQG LQWR EXLOGLQJ IRU    /)   Right of Way Use Permit Application Page 2 of   This application, with signatures of Utility and Contractor representatives, must be submitted to the Engineering Department for approval prior to commencing work.  Printing your name and date on this form indicates your acceptance of the terms and conditions of this application. Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand, or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. ________________________________________ ___________________________________ Signature of Utility Company Representative Date ________________________________________ ___________________________________ Signature of Contractor Representative Date ________________________________________ ___________________________________ APPROVED City Representative Date DENIED Comments: E-mail address to return completed permit:__________________________________________________ Submit permit application by e-mail to engineer@coppelltx.gov, or deliver application to the  Engineering Department, Town Center Business Park, 265 E Parkway Blvd, Coppell, TX 75019 SUMMARY OF REQUIREMENTS FOR WORK WITHIN THE CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS   A copy of the valid approved City of Coppell permit is required on the project site at all times.   Property owners (commercial and residential) adjacent to the project must be notified of the project timeline and provided contractor names and phone numbers. No access to private property without prior coordination with property owner.   Proper erosion control measures must be taken, in accordance with the Coppell Erosion Control Ordinance No. 91-514.   Follow Texas MUTCD standards for work in traffic zones. Lane closures require the use of a IODVKLQJ DUURZ board for advance warning.   Grading shall be restored or improved, and sod replaced when necessary. 01/24/2025            'RPLQLTXH /XHYDQR#OXPHQ FRP   YLYLDQ GHOHRQ#WJDLQF QHW 02/03/2025Scott Latta X CONTACT CITY OF COPPELL ROW INSPECTOR AVERY DAVIS (469-858-2006, adavis@coppelltx.gov) AT LEAST 48 HOURS PRIOR TO ANY CONSTRUCTION ACTIVITY Right of Way Use Permit Application Page 3 of   6. Irrigation repairs must be performed in a timely manner. 7. Follow OSHA trench safety guidelines at all times. 8. Repair existing utilities that are damaged, including but not limited to: Clean-outs, water valves, wastewater manholes, water lines, wastewater lines and storm sewer lines. 9. Density tests may be required, at applicant’s expense, in trench lines (ASTM). 10. Protection and repair of traffic control devices and signage is the responsibility of the contractor. 11. No work is to be done in collector roadways before 9: 0 a.m. or after 3:30 p.m. 12. Prior UHTXHVW of work activity on weekends and holidays must be submitted in writing. 13. Utility line locates must be performed in advance of construction by calling 811 or logging on to the Texas811 Portal at: http://www.texas811.org. Additional utility contacts are as follows: COPPELL 38%/,& :25.6   23(5$7,216 COPPELL 38%/,& :25.6   ENGINEERING 972-304-3679 DENTON COUNTY LEVEE DIST5ICT              T.C.E.Q. 5HJLRQ   817-588-5800 IRVING WATER UTILITIES 972-721-2281 ATMOS ENERGY 888-286-6700 EXPLORER PIPELINE 918-493-5100 ONCOR ELECTRIC DELIVERY 888-313-     972-462-5150 HOMEOWNER ASSOCIATIONS Planning Department: + 2 $  /LVW F.E.M.A. 940-898-5399 DALLAS WATER UTILITIES 214-670-5111 AT&T 800-924-9420 COSERV Gas & Electric 940-321-7800 FRONTIER COMMUNICATIONS 800-584-3384 SPECTRUM CABLE 8            14. Debris must be removed from work area daily and disposed of properly outside the City. 15. Streets, sidewalks and alleys must be kept clear of construction materials and debris. 16. “Clean-up” requires returning work area to pre-construction condition or better. ADDRESS: 100 SOUTH ROYAL LANE , COPPELL, TEXAS 75019PROJECT NAME: N912437CLLI :SITE LOCATIONCONTACTSSITE INDEXCONTACT INFO1 - COVER SHEET/SITE LOCATION2 - LEGEND3 - GENERAL NOTES4 - 06 - PROJECT SHEETS07-08 - TYPICAL09 - TRAFFIC CONTROL10 - PHOTOS11- RATE CARD TABLESCOPE OF WORK:Know what'sbelow.before you dig.CallRCONFIDENTIAL/PROPRIETARYSHEET: OF 0111LUMENSR. MANAGER, FIELD OPERATIONS TOM JENSEN1950 NORTH STEMMONS FRWY. OFFICE: (214) 764-2517SUITE 6060DALLAS, TX. 75204CONSTRUCTION MANAGER: GREG HENDRICKS CELL: (972)-215-6227LOCAL BUILDING CONTACT: ENGINEERING CONTRACTOR:TECH GROUP & ASSOCIATES4016 ROWLETT ROAD,ROWLETT, TX 75098ENGINEERING CONTRACT: CHARLES MARTINEZ OFFICE: (972) 613-0981 CELL: (214) 317-5452UTILITIES:TEXAS ONE CALL SYSTEM 1-800-245-4545CITY OF COPPELL(972) 721-2600MAPSCO PAGE: T1CONTRACTOR TO LOCATE EXISTING LUMENHANDHOLE ON NORTHWEST HIGHWAY ANDBUILD (675') WITH 3-1.5" H.D.P.E AND 24FIBER CABLE INTO 100 SOUTH ROYAL LANEAND PULL INTO BUILDING. RESTORE ANDRESEAL ANY DISTURBED AREAS TO SAMEOR BETTER CONDITION THAN UPONARRIVAL.DRAWING NAME:LUMEN ENGINEER:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:24189.dwgNO.123DOMINIQUE LUEVANOTECH GROUPN912437100 SOUTH ROYAL LANE COPPELL , TEXAS100 SOUTH ROYAL LANEPROPOSEDPULL-THRUROUTEPROPOSED NEWBUILD ROUTEC:\Land Projects\24189_100 South Royal Lane_Lumen\24189.dwg, 1/17/2025 11:27:32 AM, tgauser24,Eduardo S. LEGENDKnow what'sbelow.before you dig.CallRCONFIDENTIAL/PROPRIETARYSHEET: OF IDLEVEL3HH-HANDHOLELEVEL3MH-MANHOLELEVEL3PB-PULLBOXLEVEL3VAULT-VAULTLEVEL 3MANUFACTURERNAME#F#F#F111111VIEW_NUMBER0211DRAWING NAME:LUMEN ENGINEER:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:24189.dwgNO.123DOMINIQUE LUEVANOTECH GROUPN912437100 SOUTH ROYAL LANECOPPELL , TEXASC:\Land Projects\24189_100 South Royal Lane_Lumen\24189.dwg, 1/17/2025 11:27:55 AM, tgauser24,Eduardo S. GENERAL NOTESKnow what'sbelow.before you dig.CallRCONFIDENTIAL/PROPRIETARYSHEET: OF GENERAL NOTES:1. Contractor must obtain locates prior to disturbing the ground.2. Contractor must have a copy of the approved permit from the appropriate agency on the jobsite at all times.3. All cable will be placed at standard minimum depth. (Level 3 standard is 36” deep unless otherwise directed by aLevel 3 representative.)4. Any landscaping will be replaced to equal or better than that which existed prior to work.5. Project site will be properly secured prior to the end of each day.6. All work is to be in accordance with all authorities having jurisdiction in the work zone.7. Contractors are advised to contact Level 3 for any additional information or clarification concerning scope ofwork or the requirements necessary for project completion.8. Contractor is responsible to field verify all dimensions, quantities and existing conditions prior to construction. If asignificant change to the running line is needed, please contact your Level 3 representative before proceeding.9. Before construction begins, contractor shall take appropriate precautions to avoid any potential obstructionsprior to proceeding with work.10. No construction on private property will commence until approval is given by the appropriate Level 3employee.11. Contractor shall not proceed with work until they have received a Purchase Order and have been directed to doso by an authorized Level 3 representative.12. Contractor shall not exceed the Purchase Order value without authorization in writing from the appropriateLevel 3 representative.13.As-Builts will be required for each project including cable footage sequentials at every access point, slackloop, splice location, pole and termination point. Contractor should also provide notes of all changes in depths,running lines, mh/hh locations, and any other applicable notes to depict the work that took place. NOTE: All majorchanges need to be pre-approved by an authorized Level 3 employee prior to starting the work.SITE CONDITIONSThe actual location of existing conduit and cables may vary from the location shown. Repair of any damagedconduit containing cable shall be made by use of PVC split duct. The contractor shall enclose the existing cables inPVC.The locations of existing utilities shown in this plan are approximate. When work is to be conducted in the vicinity ofknown utilities, their actual location must be field verified to avoid conflicts or damage to those utilities. Variation inlocation between "recorded positions" and actual positions should be anticipated.It shall be the contractor's responsibility to verify the location of all underground utilities. Buried utilities may exist in thearea in addition to those shown on the plan. The contractor shall contact property owners when working within privateeasements for location of underground tanks, pipelines, drain tiles, or other buried improvements. The contractor shallalso notify the utility notification center prior to commencing any construction activities.The contractor must assume all buried utilities encountered are alive and active unless specifically instructedotherwise by the owners or operators of said utilities.Damage to sub-surface structures is the sole responsibility of the placing contractor.The contractor shall protect the existing traffic control loops. If existing traffic control loops are damaged duringconstruction, the entire loopwire from terminal shall be replaced in accordance with governing agency standards andregulations at contractor's expense.Removal of existing asphalt pavement, concrete curbs, and concrete sidewalks will be "neat line" with saw orpavement cutter , per requirements and specifications of the agency or department responsible for each location. Ifconcrete pavement is encountered while excavating conduit trenches, the concrete removal will be "neat line" with apavement saw.If concrete curb returns and/or sidewalks are replaced due to conduit or manhole installation, the contractor shallplace approved handicapped sidewalk and curb access ramps in conformance with State statutes.All materials necessary for repair or streets, curbs, sidewalks, sanitary sewers, storm sewers, and public serviceutilities and the installation of such materials shall be in conformance with the requirements and specifications of theagency or department responsible for the operation and maintenance of the repaired facility.All work shall conform to the specifications of the jurisdictional permit agency.All open trench will be clearly marked with barricaded or cones. Steel plates or other types of bridging shall beprovided to cover open trench inthe travel portion of the streets. These plates or bridging shall be adequate to supportthe normal vehicle loads anticipate in this area and shall be in place during all non-working areas.All surfaces to be restored to original condition, and backfill to be compacted as specified. Trench excavation insurfaces which include concrete treated base shall follow local area specificationsHAZARDOUS MATERIALThe contractor shall notify the jurisdictional permit agency immediately if any material are encountered that areconsidered by the EPA, DEQ, or OSHA. If potentially hazardous materials are encountered the contractor shallsecure the site and prevent the accidental exposure by the public or the contractor's personnel.The contractor may excavate up to, but shall not disturb known hazardous materials such as asbestos, oils, acid,etc. The removal of all hazardous materials must be done by an approved or certified hazardous materialscontractor licensed by the state.A copy of all correspondence pertinent to the removal of hazardous materials shall be transmitted to owner and acopy shall be available at the project office and the job site.AERIAL NOTESAerial construction to be performed to industry acceptable standards.All heights of cable placement will be recorded at the time of construction. Document all points of attachment.6.6M strand will be used with standard 58" hardware.All extension arms to be placed will be epoxy arms unless otherwise noted or approved by the inspector.Bond strand to power MGN where applicable. Anchors to be used will be 34" screw in type.All straps will be placed 4" before and after every supporting clamp at minimun of 21" apart.P.O.A = Point of AttachmentAdd missing groundsRepair/Replace existing lashing wire if damagedCONSTRUCTION STAKESIn areas where the conduit alignment is not clearly defined by curb lines, fence lines, or other evidence of theright-of-way, the engineer will provide centerline stakes or paint marks where required to make the proposedconduit alignment evident.Closures identified in the plans shall be located by the contractor. Deviation from plan layout shall be approvedby the engineer prior to conduit and/or closure installation.Manhole centers will be field staked by the engineer when requestd with offset stakes at right anglesto theconduit alignment.If additional field staking or location of conduits, manholes, property lines, etc. becomes necessary, thecontractor is to notify the inspector or the engineer two working days prior to beginning the work.PERMITS-FRANCHISES-EASEMENTSPhysical work shall not be started until the governing agency inspector and the contractor are in possession ofand have carefully reviewed and fully understand all conditions and specifications set forth in the required permit,franchises, and/or easements.Placing foreman to have a copy of the permits/easements on site all timesAny conflict between work print specifications and specifications set forth under related permits, franchises,and/or easements must be cleared by proper company authority before progressing with work involved.TRAFFIC CONTROLThis project will involve working along a major arterial road and heavy traffic volume should be anticipated.Uniform traffic flow shall be maintained at all times. Only equipment and materials necessary for immediatelyscheduled or in progress will be maintained in the work area. All other equipment and material will be "stored orstockpiled" in such a manner as to eliminate hazardous conditions for traffic or pedestrians during non-workingor shut down period.Traffic warning devices and signs shall conform to the manual on uniform traffic control devices for streets andhighways (US Government Printing Office) and to the state highway division standard specifications for highwayconstruction. High level warning type devices are to be used at times and special warning devices may bestipulated by the jurisdictional permit agency at any time he use will add to the safety and protection of traffic orpedestrians in the construction area.All conduit trenching in paved areas shall be backfilled with crushed gravel or completely covered at thecompletion of each working day. Any backfilled trench shall be capped with a minimum layer of asphalticconcrete cold patch at the end of each working day.The contractor shall mark the conduit trench and define his construction area clearly with barricades, cones,and/or other visible methods that alert the public of the construction activity.A traffic control plan shall be prepared by the contractor as required and submitted to each permitting agencyrequesting such plan for review and approval or revision prior to commencing any construction activity for thisproject. The approved plan shall be submitted to the agency and a copy of the plan shall be kept at theconstruction site and must be available for review by agency representatives.SPECIAL UTILITY CLEARANCESAll work conducted adjacent to water mains shall conform to following conditions.A.Whenever possible conduit shall maintain a horizontal separation of 3', measured surface(outside edge to outside edge) from parallel water mains.B.Whenever possible conduit shall pass under existing water mains and must maintain 12"vertical clear separation. Conduit passing over water mains must also maintain the 12" verticalseparation.C.The contractor shall be responsible for establishing and maintaining this required verticalseparation by either exposing the water main every 100 feet in those areas where horizontalseparation is less 3 feet or by utilizing the depths of adjacent water valves. If the contractorutilizes the adjacent water to determine water main depth, he shall contact the agency at eachsuch location and the agency will determine the necessary depth of the top of the conduit atthat point.D. The vertical and horizontal separation shall be maintained at all times unless specificallyrevised by agreement between the jurisdictional permit agency and the agency. Any specificdeviation in vertical and horizontal separation from those described shall be reported to theowner by the contractor. The contractor shall be responsible for maintaining vertical andhorizontal separation at all times and shall be reponsible for any and all encroachmentsE.Clearances to storm sewers and sanitary sewers shall be exactly the same as those to watermains.STRUCTURE PROTECTIONManholes and conduit to be placed adjacent to existing structures such as bridge, bridgefooting/piers foundations, walls, power and telephone poles, and other utilities shall maintain aminimum clearance as shown. The contractorshall not undermine any adjacent structure without specific written permission from theowner/operator of such structure.Shoring used as foundation support shall be designed specifically for both the live and dead loadsof the structure or if only the dead is used for design. The contractor shall provide a detailed layoutand plan of the method of establishing and maintaining the design load conditions (i.e. roaddetours, tiebacks,etc).See utility clearance section notes for clearance criteria to parallel or cross utilities.Existing utilities exposed during excavation shall be 100% supported by either trench bridging andsuspension or by the use of longitudinal trays or platforms vertically supports by adjustable buildingjacks.Existing splice cases and cables shall be supported by suspension from a crossing beam.Supports shall be placed at a maximum spacing of 4 feet and shall consist of a canvas sling withnylon belting or rope. All cable supports shall be placed in a manner that prevents kinks or otherdamage to the cable sheath.An acceptable alternative to cable slings would be the utilization of a wide flange "I" beam orchannel as a "cable tray" with cables/cases banded in place.SHORINGThe contractor shall provide shoring for conduit trench excavation 42" or more in depth asmeasured from the high side of the trench and for all manhole excavation.Manhole shoring shall be tight-sheetedAll shoring shall conform to the standards and specifications of local county and the occupationalsafety health administration.The contractor shall provide all shoring and design calculations to the permit issuing agency priorto commencing any construction activity.0311DRAWING NAME:LUMEN ENGINEER:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:24189.dwgNO.123DOMINIQUE LUEVANOTECH GROUPN912437100 SOUTH ROYAL LANECOPPELL , TEXASC:\Land Projects\24189_100 South Royal Lane_Lumen\24189.dwg, 1/17/2025 11:27:41 AM, tgauser24,Eduardo S. EXISTINGLUMEN HHCONSTRUCTION NOTESKnow what'sbelow.before you dig.CallRCONFIDENTIAL/PROPRIETARYSHEET: OF 0411DALLAS COUNTY100 SOUTH ROYAL LANECOPPELL , TEXAS 75019!Total Underground Rate CardUnit Code & DescriptionUnitsEstimatedQuantityActualQuantityTotal Material Rate CardUnit Code & DescriptionUnitsEstimatedQuantityActualQuantityMATCH TO SHEET 05 STA - 4+50(450')STA 0+00 CONTRACTOR TO LOCATEAND CONNECT TO EXISTINGLUMEN HANHOLE #0540-A0O5BEGIN DIRECTIONAL BOREINCLUDE 100' SLACK COIL1DIRECTIONAL BORE (450')3-1.25" H.D.P.EE/W 24 FIBER OPTIC CABLE& 10GA TRACER WIRE24FNOTE& FIELD EXPOSURES.UTILITY & R.O.W. REPRESENTED ONPLANS ARE BASED ON RECORDS. NOT ON BOUNDARY SURVEYDRAWING NAME:LUMEN ENGINEER:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:24189.dwgNO.123DOMINIQUE LUEVANOTECH GROUPN912437100 SOUTH ROYAL LANE COPPELL , TEXAS2'7'3'7'1C:\Land Projects\24189_100 South Royal Lane_Lumen\24189.dwg, 1/17/2025 11:29:07 AM, tgauser24,Eduardo S. 525515505STA 0+00 EX. LUMEN HH#0540-A0O5 525515505DIRECTIONAL BORE (450')3-1.25" H.D.P.E. E/W24 FIBER OPTIC CABLE &10GA TRACER WIREBEGIN DIR. BORE CONSTRUCTION NOTESKnow what'sbelow.before you dig.CallRCONFIDENTIAL/PROPRIETARYSHEET: OF 4PF11!NOTE& FIELD EXPOSURES.UTILITY & R.O.W. REPRESENTED ONPLANS ARE BASED ON RECORDS. NOT ON BOUNDARY SURVEYDRAWING NAME:LUMEN ENGINEER:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:24189.dwgNO.123DOMINIQUE LUEVANOTECH GROUPN912437100 SOUTH ROYAL LANECOPPELL , TEXASDALLAS COUNTY100 SOUTH ROYAL LANECOPPELL , TEXAS 75019C:\Land Projects\24189_100 South Royal Lane_Lumen\24189.dwg, 1/17/2025 11:29:00 AM, tgauser24,Eduardo S. CONSTRUCTION NOTESKnow what'sbelow.before you dig.CallRCONFIDENTIAL/PROPRIETARYSHEET: OF 0511DALLAS COUNTY100 SOUTH ROYAL LANECOPPELL , TEXAS 75019!Total Underground Rate CardUnit Code & DescriptionUnitsEstimatedQuantityActualQuantityTotal Material Rate CardUnit Code & DescriptionUnitsEstimatedQuantityActualQuantityMATCH TO SHEET 05 STA - 4+50(250')STA 7+00 CONTRACTOR TO LOCATEAND INTERCEPT EXISTING CUSTOMERCONDUIT WITH WYE INTERCEPTAND BEGIN PULL THROUGH1DIRECTIONAL BORE (250')3-1.25" H.D.P.EE/W 24 FIBER OPTIC CABLE& 10GA TRACER WIREDRAWING NAME:LUMEN ENGINEER:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:24189.dwgNO.123DOMINIQUE LUEVANOTECH GROUPN912437100 SOUTH ROYAL LANECOPPELL , TEXASPULL (90') 24 FIBER OPTICCABLE THRU EXISTINGBUILDING CONDUIT(60')(90')Total Inside Plant (ISP) Rate CardUnit Code & DescriptionUnitsEstimatedQuantityActualQuantity1CONTRACTOR TO REMOVE ANDPLACE 16 SQ,FT OF CONCRETE TOORIGINAL OR BETTER CONDITION221ST FLOOR2'7'2'7'(15')PULL (65') 24 FIBER OPTICCABLE THRU EXISTINGBUILDING CONDUITSEE SHEET 06FOR FIBER CONTINUATION1/31/2025 11:19:15 AM, eduardo, _AutoCAD PDF (High Quality Print).pc3 525515505525515505STA 7+00 WYE-INTERCEPTDIRECTIONAL BORE (225')3-1.25" H.D.P.E. E/W24 FIBER OPTIC CABLE &10GA TRACER WIRECONSTRUCTION NOTESKnow what'sbelow.before you dig.CallRCONFIDENTIAL/PROPRIETARYSHEET: OF 5PF11DRAWING NAME:LUMEN ENGINEER:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:24189.dwgNO.123DOMINIQUE LUEVANOTECH GROUPN912437100 SOUTH ROYAL LANE COPPELL , TEXASDALLAS COUNTY100 SOUTH ROYAL LANECOPPELL , TEXAS 750191/31/2025 11:19:15 AM, eduardo, _AutoCAD PDF (High Quality Print).pc3 CONSTRUCTION NOTESKnow what'sbelow.before you dig.CallRCONFIDENTIAL/PROPRIETARYSHEET: OF 0611DALLAS COUNTY100 SOUTH ROYAL LANECOPPELL , TEXAS 75019!1DRAWING NAME:LUMEN ENGINEER:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:24189.dwgNO.123DOMINIQUE LUEVANOTECH GROUPN912437100 SOUTH ROYAL LANECOPPELL , TEXAS24F21STA 8+55CONTRACTOR TO ENTERROOM AND PLACE PROPOSED LUMENEQUIPMENT ON NEW RACKW/ 50' SLACK FOR FIBER TERMINATIONSEE SHEET 05FOR FIBER CONTINUATION2ND FLOORSTA 8+652ND FLOOR ENTRYPULL (10') 24 FIBER OPTICCABLE THRU EXISTINGBUILDING CONDUIT2Total Underground Rate CardUnit Code & DescriptionUnitsEstimatedQuantityActualQuantityTotal Material Rate CardUnit Code & DescriptionUnitsEstimatedQuantityActualQuantity(10')1/21/2025 3:33:17 PM, eduardo, _AutoCAD PDF (High Quality Print).pc3 CONFIDENTIAL/PROPRIETARYSHEET: OF 0711TYPICALSKnow what'sbelow.before you dig.CallRDRAWING NAME:LUMEN ENGINEER:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:24189.dwgNO.123DOMINIQUE LUEVANOTECH GROUPN912437100 SOUTH ROYAL LANE COPPELL , TEXASC:\Land Projects\24189_100 South Royal Lane_Lumen\24189.dwg, 1/17/2025 11:28:27 AM, tgauser24,Eduardo S. CONFIDENTIAL/PROPRIETARYSHEET: OF 0811TYPICALSKnow what'sbelow.before you dig.CallRDRAWING NAME:LUMEN ENGINEER:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:24189.dwgNO.123DOMINIQUE LUEVANOTECH GROUPN912437100 SOUTH ROYAL LANECOPPELL , TEXASC:\Land Projects\24189_100 South Royal Lane_Lumen\24189.dwg, 1/17/2025 11:28:19 AM, tgauser24,Eduardo S. SPEEDLIMIT40SOUTH ROYAL LANE240'240'240'240'320' TAPER100' WORK ZONE12' WIDENORTHPOINT DRIVE CONFIDENTIAL/PROPRIETARYSHEET: OF 0911TRAFFIC CONTROLKnow what'sbelow.before you dig.CallRDRAWING NAME:LUMEN ENGINEER:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:24189.dwgNO.123DOMINIQUE LUEVANOTECH GROUPN912437100 SOUTH ROYAL LANECOPPELL , TEXASC:\Land Projects\24189_100 South Royal Lane_Lumen\24189.dwg, 1/17/2025 11:28:02 AM, tgauser24,Eduardo S. CONFIDENTIAL/PROPRIETARYSHEET: OF 1011SITE PHOTOGRAPHSKnow what'sbelow.before you dig.CallR14EX. LUMEN HANDHOLE3-1.5" H.D.P.E. W/24FCEX. LUMEN HANDHOLE #0540-A0O515WYE-INTERCEPTDRAWING NAME:LUMEN ENGINEER:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:24189.dwgNO.123DOMINIQUE LUEVANOTECH GROUPN912437100 SOUTH ROYAL LANECOPPELL , TEXAS3-1.5" H.D.P.E. W/24FCWYE-INTERCEPT &BEGIN PULL-THRU25FIRST FLOOR ENTRY16SECOND FLOOR ENTRY26LUMEN EQUPMENTFIRST FLOOR ENTRYSECOND FLOOR ENTRYPULL 24 FIBER CABLETHRU BUILDING CONDUITSECOND FLOOR ENTRYPULL 24 FIBER CABLETHRU BUILDING CONDUITCONTRACTOR TO ENTERROOM AND PLACE PROPOSED LUMENEQUIPMENT ON NEW RACKW/ 50' SLACK FOR FIBER TERMINATIONPULL 24 FIBER CABLETHRU BUILDING CONDUITPULL 24 FIBER CABLETHRU BUILDING CONDUIT1/21/2025 3:33:17 PM, eduardo, _AutoCAD PDF (High Quality Print).pc3 CONFIDENTIAL/PROPRIETARYSHEET: OF 1111RATE CARD TABLEKnow what'sbelow.before you dig.CallRTotal Underground Rate CardUnit Code & DescriptionUnitsEstimatedQuantityActualQuantityTotal Material Rate CardUnit Code & DescriptionUnitsEstimatedQuantityActualQuantityTotal Inside Plant (ISP) Rate CardUnit Code & DescriptionUnitsEstimatedQuantityActualQuantityDRAWING NAME:LUMEN ENGINEER:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:24189.dwgNO.123DOMINIQUE LUEVANOTECH GROUPN912437100 SOUTH ROYAL LANECOPPELL , TEXASC:\Land Projects\24189_100 South Royal Lane_Lumen\24189.dwg, 1/17/2025 11:27:48 AM, tgauser24,Eduardo S.