Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Park West III CC-PT 240207 (2)
Good afternoon, -Failing to follow these instructions will result in significant delays to the approval process- Please find attached an approved Coppell Water Line Potholing permit and GIS utility map. The proposed 2” gas services will cross an existing City of Coppell 16" and 24” water line, which will need to be located by potholing prior to approval of the Right-of-Way permit application. Please follow the steps below to coordinate the potholing of the City of Coppell's 16" and 24” water lines. 1. Contact the Coppell Public Works Engineering ROW Inspector at 972-304-3685 at least 2 business days prior to the proposed potholing to schedule a representative of the City to be present when potholing the Coppell 16” and 24” water lines. 2. Using the attached approved potholing permit, record the depth and location of the water line and update the construction plans accordingly, if necessary. 3. The review of the ROW Use Permit application will resume upon successful location of the 16” and 24” water lines. Thank you. BUILDING 1 BUILDING 2 (SEPARATE PERMIT) SOUTHWESTERN BLVD S. BELTLINE RDBUILDING 3 (SEPARATE PERMIT)ATS XETEFOSAREGISTEREDARCHIT E C T ROBERTPROS S 27424Tpross design group, incorporated5310 Harvest Hill Road, Suite 180, Dallas, Texas 75230. 972/759-1400job no sheetTHIS DOCUMENT AND THE DESIGNS CONTAINED THEREIN REMAINS THE PROPERTY OF PROSS DESIGN GROUP, INC. AS AN INSTRUMENT OF PROFESSIONAL SERVICE. IT IS NOT TO BE USED IN WHOLE OR IN PART FOR ANY OTHER PURPOSE WITHOUT THE WRITTEN PERMISSION OF PROSS DESIGN GROUP© 2020drawn:checkedROBERT PROSSdatePARK WEST PHASE IIICOPPELL, TEXAS03/15/2023 BUILDING 1C:\Users\David\Documents\2003 ARCH CENTRAL_Building_1_pdg11.rvt3/15/2023 10:56:53 AM2003 A1.0SF 11/04/2022NORTH SCALE: 1" = 80'-0"1 SITE PLAN 1 1 #DATEDESCRIPTION11/11/2022BID & PERMIT SET103/15/2023ISSUE FOR CONSTRUCTIONEXISTING 3 INCH PE GAS MAIN EXISTING 3 INCH STEEL GAS MAIN INSTALL 2 INCH SERVICE LINE INSTALL 2 INCH SERVICE LINE INSTALL 2 INCH SERVICE LINE MAINTAIN 2 FOOT CLEARENCE FROM ALL CITY UTILITIES Locate 16" water line by potholing Locate 24" water line by potholingLocate 24" water line by potholing Locate 16" water line by potholing Locate 24" water line by potholing Locate 24" water line by potholing