Loading...
Spectrum-PT250708X Marcus Marion 07/08/2025 THIS PERMIT IS ONLY FOR THE PURPOSE OF LOCATING THE CITY OF COPPELL 24" WATER LINE AT IT'S INTERSECTION WITH THE PROPOSED 2" CONDUIT. CONTACT CITY OF COPPELL ROW INSPECTOR TYLER BOYER (469-978-0818, tboyer@coppelltx.gov) AT LEAST 48 HOURS PRIOR TO ANY POTHOLING ACTIVITY Locate 24" water lineby potholing Locate 24" water line by potholing Locate 24" water line by potholing.