Loading...
Frontier-PT250808A copy of the approved permit must be on the job site at all times Page 1 of 5RIGHT-OF-WAY USE PERMIT APPLICATION Rev.08/2020 Permit Valid for 120 Days From Date of Approval All activity authorized by this permit shall be in accordance with CHAPTER 283 of the Texas Local Government Code and the City of Coppell Public Rights-of-Way Management ordinance No. 2001-944 Date of Submittal:__________________ Applicant’s Job # / Work Order #_____________________ Project Name / Location and Address:__________________________________________________ Permit Fee: $100.00 (No fee for applications submitted on behalf of Utility Companies with a current Public Rights-of-Way Management Ordinance Registration). S.P.C.O.A. Certificate # ____________________ Utility Company Information: Oncor Electric Delivery Atmos Energy Frontier Spectrum Level 3 Other:________________________________________________________ Utility Company Representative:____________________________________________________ E-mail Address:__________________________________Telephone:______________________ Contractor Information: General Contractor:______________________________________________________________ General Contractor Representative:_________________________________________________ E-mail Address:__________________________________Telephone:______________________ Project Information: General Description of Proposed Construction (Attach Plan & Profile, See Page 5 for Example): Estimated Start Date:_______________ Estimated Completion Date:_________________ Has 811 and/or utility companies been contacted 48 hours prior to locate existing utilities? Yes No If No, state reason:_________________________________________________ Is removal of existing streets, alleys or sidewalks necessary? Yes No If YES, repair must have a City inspection prior to completion. Call 972-304-3679. Is closure of any traffic lanes or driveway approaches necessary? Yes No If YES, a traffic control plan in accordance with TMUTCD standards must be submitted, and the following departments must be notified of the location and duration of the closure: Police Department, 972-304-3600 Fire Department, 972-304-3512 Street Department, 972-462-5150 Engineering Department, 972-304-3679 Traffic lane closures are allowed from 9:30 a.m until 3:30 p.m. ONLY unless otherwise approved by the City Engineer. --Work activity is permitted from 7:00 a.m. until 7:00 p.m., Monday through Friday only.-- 08/06/2025 5392513 Proposed bore, duct & handhole / 125 Southwestern Blvd n Gabe Barrera (Outside Plant Technician) gabe.x.barrera@ftr.com (469) 528-1312 Mastec Services Stephen Williams (Superintendent) marlow.williams@mastec.com (903) 486-1022 08/25/2025 10/31/2025 Contractor will call in locates before any work is started. n n Bore 1 - 2" Conduit Right of Way Use Permit Application Page 2 of 5 This application, with signatures of Utility and Contractor representatives, must be submitted to the Engineering Department for approval prior to commencing work. Printing your name and date on this form indicates your acceptance of the terms and conditions of this application. Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand, or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. ________________________________________ ___________________________________ Signature of Utility Company Representative Date ________________________________________ ___________________________________ Signature of Contractor Representative Date ________________________________________ ___________________________________ APPROVED City Representative Date DENIED Comments: E-mail address to return completed permit:__________________________________________________ Submit permit application by e-mail to engineer@coppelltx.gov, or deliver application to the Engineering Department, Town Center Business Park, 265 E Parkway Blvd, Coppell, TX 75019 SUMMARY OF REQUIREMENTS FOR WORK WITHIN THE CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS 1.A copy of the valid approved City of Coppell permit is required on the project site at all times. 2.Property owners (commercial and residential) adjacent to the project must be notified of the project timeline and provided contractor names and phone numbers. No access to private property without prior coordination with property owner. 3.Proper erosion control measures must be taken, in accordance with the Coppell Erosion Control Ordinance No. 91-514. 4.Follow Texas MUTCD standards for work in traffic zones. Lane closures require the use of a flashing arrow board for advance warning. 5.Grading shall be restored or improved, and sod replaced when necessary. 08/06/2025 08/06/2025 08/08/2025Marcus Marion X CONTACT CITY OF COPPELL ROW INSPECTOR TYLER BOYER (469-978-0818, tboyer@coppelltx.gov) AT LEAST 48 HOURS PRIOR TO ANY CONSTRUCTION ACTIVITY Right of Way Use Permit Application Page 3 of 5 6.Irrigation repairs must be performed in a timely manner. 7.Follow OSHA trench safety guidelines at all times. 8.Repair existing utilities that are damaged, including but not limited to: Clean-outs, water valves, wastewater manholes, water lines, wastewater lines and storm sewer lines. 9. Density tests may be required, at applicant’s expense, in trench lines (ASTM). 10.Protection and repair of traffic control devices and signage is the responsibility of the contractor. 11.No work is to be done in collector roadways before 9:30 a.m. or after 3:30 p.m. 12.Prior request of work activity on weekends and holidays must be submitted in writing. 13.Utility line locates must be performed in advance of construction by calling 811 or logging on to the Texas811 Portal at: http://www.texas811.org. Additional utility contacts are as follows: COPPELL PUBLIC WORKS - OPERATIONS COPPELL PUBLIC WORKS - ENGINEERING 972-304-3679 DENTON COUNTY LEVEE DISTRICT 972-315-5019 T.C.E.Q. Region 4 817-588-5800 IRVING WATER UTILITIES 972-721-2281 ATMOS ENERGY 888-286-6700 EXPLORER PIPELINE 918-493-5100 ONCOR ELECTRIC DELIVERY 888-313-6862 972-462-5150 HOMEOWNER ASSOCIATIONS Planning Department: H.O.A. List F.E.M.A. 940-898-5399 DALLAS WATER UTILITIES 214-670-5111 AT&T 800-924-9420 COSERV Gas & Electric 940-321-7800 FRONTIER COMMUNICATIONS 800-584-3384 SPECTRUM CABLE 833-780-1880 14. Debris must be removed from work area daily and disposed of properly outside the City. 15.Streets, sidewalks and alleys must be kept clear of construction materials and debris. 16.“Clean-up” requires returning work area to pre-construction condition or better. Right of Way Use Permit Application Page 4 of 5 Contact Coppell Public Works Operations at 972/462-5150 to schedule an inspection with Utility and Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule verification inspection may delay future projects. Franchise Utility Name:___________________________________________________________ Project Location or Address:_______________________________________________________ Sub-contractor Company Name:____________________________________________________ 24 hr. Contact Number:____________________________________________________________ Date of Verification Appointment:_________________________ Time:____________________ -INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORKS PERSONNEL- Inspected by:_________________ of Utilities Maintenance Division on _______________ and found to be acceptable, not acceptable because:___________________________ Follow-up needed? No Yes, follow-up scheduled for:__________________________ Inspected by:__________________ of Streets Maintenance Division on _______________ and found to be acceptable, not acceptable because:___________________________ Follow-up needed? No Yes, follow-up scheduled for:__________________________ A copy of this completed notice can be e-mailed to the Coppell Public Works Operations Division, or delivered to the address below: City of Coppell Public Works Department, Operations Division 816 S. Coppell Road Coppell, TX 75019 COMPLETION VERIFICATION NOTICE EXAMPLE BULLOCK ST SOUTHWESTERN BLVD HOWELL ST Place17"x30"HH S BELT LINE RD50'221SOUTHWESTERN BLVDWORK LOCATION: 125 SOUTHWESTERN BLVDProposed bore approximately 60' from existing Frontier handhole on west side ofdriveway entrance to east side and place (1) 2" subduct and new 17"x30" handholeto extend and capture customer conduit. Work is required to provide fiber serviceto customer at 125 Southwestern Blvd.1. Placing (1) 2" subduct.2. Placing (1) 17"x30" handhole**************************************************************************************************-All utilities will be located before any work is started.-24" minimum from city utilities will be maintained-Landscaping will be restored to original condition** City of Coppell ROW inspector wll need to be contacted at least 48 hours prior to any construction activity - Avery Davis, 469-858-2006 or adavis@coppelltx.gov S DENTON TAP RDExisting Frontierfiber hubSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSsidewalksidewalk8" SSWWWWWWWWWWWWWWWWWWWWWWWWWW12" WLW W WW W W W W W8" WLWWWWWWWWWWWWWWWWWWWWWW8" WLW W W W W WW W W W W W W WWWWWW WWWWWW8" WL8" WL8"6" WL SOUTHWESTERN BLVD8 WL"160SouthwesternBlvd36"12"WL** BORE PROFILE **(under driveway entrance)7'-6" depth NSouthwesternBlvdNew 17"x30"handholeover customerconduitNewFrontier2" conduit& fiber20'U.E. R.O.W.8" SSWWWWWWWWWWWWWWWWWWWWWWWWWWWW24" WLCity of Coppellfiber optic line24" WL24"WL4'-0" depth ExistingFrontierfiber &handhole125SOUTHWESTERN BLVDdw sidewalk20'U.E.Bore 60' underdriveway & place(1) 2" duct** Handhole Specs **17"x30"x24"4" customer conduitENGR:PHONE:DRAWN DATE:SCALE:TAX DISTRICT:PROJECTNUMBER:C.O. AREA:EXCH. CODE:DWGOFCNTY:TWNSHP:RNG:SEC:FILE:PROPOSED BORE, DUCT & HH 125 SOUTHWESTERN BLVD5392513GABE B.469-528-13121=10011** R.O.W. PERMIT ** Page 658 2011 Edition - Revision 2 Sect. 2X.XX to 2X.XX December 2011Sect. 6H.01 December 2011 Ta ble 6H-2. Meaning of Symbols on Typical Application Diagrams Ty pe 3 barricade Tr uck-mounted attenuator Tr affic or pedestrian signal Surveyor Te mporary barrier with warning light Te mporary barrier Sign (shown facing left) Wa rning light Wo rk space Shadow vehicle Wo rk vehicle Luminaire Pavement markings that should beremoved for a long-term project Changeable message sign or support trailer Arrow board Channelizing device Arrow board support or trailer(shown facing down) Direction of temporary traffic detour Crash cushion Direction of traffic High-level warning device (Flag tree) Flagger Longitudinal channelizing device 2011 Edition - Revision 2 Page 659 December 2011 Sect. 2X.XX to 2X.XX Table 6H-4. Merging Taper Lengths and Spacing of Channelizing Devices * Minimum Desirable Taper Lengths Suggested maximum Spacing of Channelizing Devices PostedSpeed Formula 10' Offset 11' Offset 12' Offset On a taper On a tangent 30 2 L = WS 60 150'165'180'30' 60' 35 205'225'245'35' 70' 40 265'295'320'40' 80' 45 L = WS 450'495'540'45' 90' 50 500'550'600'50'100' 55 550'605'660'55'110' 60 600'660'720'60'120' 65 650'715'780'65'130' 70 700'770'840'70'140' 75 750'825'900'75'150' 80 800'880'960'80'160' * Taper lenghts have been rounded off. L = Length of Taper (Feet) W = Width of Offset (Feet) S = Posted Speed (MPH) Table 6H-3. Suggested Advance Warning Sign Spacing Road Classification Posted Speed (MPH) Sign Spacing "X" (Feet) Conventional Highway 25 100 30 120 35 160 40 240 45 320 50 400 55*500 60*600 65*700 70*800 75*900 80*1000 Expressway or Freeway All Speeds See Typical Applications ** * Distance between signs should be increased to have 1500 feet advance warning. (See Section 6C.04.07) ** Distance between signs should be increased to have 1/2 mile or more advance warning (See Section 6C.04.05) December 2011 Sect. 6H.01 Page 694 2011 Edition - Revision 2 Sect. 6H.01 December 2011 Notes for Figure 6H-18—Typical Application 18 Lane Closure on a Minor Street Standard: 1. This TTC shall be used only for low-speed facilities having low traffic volumes. Option: 2. Where the work space is short, where road users can see the roadway beyond, and where volume is low, vehicular traffic may be self-regulating. Standard: 3. Where vehicular traffic cannot effectively self-regulate, one or two flaggers shall be used as illustrated in Figure 6H-10. Option: 4. Flashing warning lights and/or flags may be used to call attention to the advance warning signs. 5. A truck-mounted attenuator may be used on the work vehicle and the shadow vehicle Support: 6. Additional requirements for the location of flagger stations are contained in section 6E.08. 2011 Edition - Revision 2 Page 695 December 2011 Sect. 6H.01 Typical Application 18 Note: See Ta bles 6H-2 and 6H-3 for the meaning of the symbols and/or letter codes used in this figure. Wo rk vehicle (optional) Tr uck-mounted attenuator (optional) Buffer space(optional) 50 to 100 ft X X Note: Warning signs sequence in this direction same as below Figure 6H-18. Lane Closure on a Minor Street (TA-18) (optional) OR