Windsor Estates-CS020122January 22, 2002
Mr. Kelly Jordan
Excel Group, Inc.
2639 Walnut Hill Ln, Suite 103
Dallas, Texas 75229
RE: Windsor Estates / DeForest Road
Dear Kelly:
As noted in the attached letter dated May 22, 2001, the completion of DeForest Road was a
condition under which temporary release was granted to Windsor Estates. Paving and drainage
improvements for DeForest Road were part of the original plans for Windsor Estates, and as such,
have been included in the initial walk-thru and all subsequent walk-thrus.
It is necessary that the paving and drainage improvements be completed so that a final walk-thru can
be scheduled, and so that the City of Coppell can accept the entire Windsor Estates project. Please
take the steps necessary to assure that the final walk-thru can be done in good order and in a timely
manner. Also, as noted in the May 22, 2001 letter, no CO's will be issued until all items have been
addressed.
If I can be of further service, please let me know.
Sincere/
Lc~n~struDct~i' isn inspec~tor
CC;
Gary Johnson Asst. City Engineer
Greg Jones, Chief Building Official
Bryan Peck, Excel Group
T H · · C I T Y - 0 Ie
COPPELL
May 22, 2001
FILE
Mr. Kelly Jordan
Excel Group, Inc.
2639 Walnut Hill Ln, Suite 103
Dallas, Texas 75229
RE: Windsor Estates Temporary Release
Dear Kelly:
This letter is to inform you that a temporary release will be granted for Windsor Estates. This
release is being granted with the understanding that the below mentioned items will be addressed in
the next few weeks.
Completion of DeForest Road as per the approved plans dated 8/22/00.
The storm drainage system on the north side of the development will be corrected as
approved by the City.
Also as discussed a few weeks ago, you acl~owledged that you will notify the home builders
for this development that the current straight tees located at the sanitary sewer connections for
each lot will need to be replaced with a sweep tee as per City standards as each lot develops.
Once all the above items are addressed, except for the sanitary sewer issue which will be
completed as each lot develops, a two-year 50% maintenance bond and as-builts need to be
submitted. When the City receives these items, a final acceptance letter will be issued.
Lar~ D;
Co~trud
CC:
No CO's will be issued for any of the homes until all items listed above have been completed and
accepted by the City of Coppell. If I can be of further service, please let me know.
Glenn Hollowell, Asst. Dir. of Public Works
Mike Martin, Asst. City Engineer
IGreg Jones, Chief Building Official
Lee Stone, Commercial Building Inspector
Mike Hodge, Building Inspector
Travis Crump, Fire Marshal