Town Center L4B1-CS020116T H E · C I T Y · 0
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To:
From:
Date:
RE:
Gary Johnson, Asst. City Engineer
Glenn Hollowell, Asst. Director of Public Works
Greg Jones, Chief Building Official
Travis Crump, Fire Marshal
Larry Davis, Construction Inspector/~//~
January 16, 2002
WALK-THRU for Coppell Retail Center
(Town Center Addition, Lot 4, Block 1)
A final walk-thru for streets, utilities and drainage on the referenced project has been
scheduled for Friday, January 18, 2002 at 8:30 a .m.
If I can be of further assistance, please let me know.
CC:
Lee Stone, Commercial Inspector
Roland Asebedo, Asst. Fire Marshal
Larry Smith, CMG fax 214-521-1279
Post. it® Fax Note 7671
Phone
Phone ~
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"