ST9401WA-CS 961008P.O. Box 478 Coppell, Texas 75019 214-462-0022 October 8, 1996 Ruben Garza J.C. Evans Construction Company 3900 Valley View Lane Irving, TX 75062 Re: Demon Tap Road 16" Water Line Project//ST 94-01 WA Dear Sir: An agreement between J.C. Evans Construction Co., Inc. and the City of Coppell was signed on April 12, 1996 for the installation of a 16" water main in Denton Tap Road from Parkway Blvd. to S.H. 121 Bypass. On April 16, 1996, I.C. Evans Construction Company moved in and began work on the project. Article 3.1 of the contract states that the work shall be substantially complete within 60 working days from the beginning date indicated in the Notice to Proceed or when the contract time commences to run as provided in paragraph 2.3 of the General Conditions. It also states that it needs to be complete and ready for final payment in accordance with paragraph 14.13 of the General Conditions within 90 working days from the date when the contract time commences. On the last pay estimate submitted to the City for the period 7/1/96 to 7/30/96, the time charged to that date was 60 working days. As per the definition of "substantial completion" as stated in the General Conditions ".. . it is sufficiently complete, in accordance with the contract documents, so that the work (or specified part) can be utilized for the purposes for which it is intended . . . ". To date there has been no acceptable water sample provided to the City to allow the 16" water line to be put into service. This letter is to inform you that liquidated damages of $400/per day as stated in the agreement, is being assessed beginning with the date of August 1, 1996 until such time as the water line is put into service. As of this date, 48 working days have passed since the original 60 working days as agreed to in the contact. This totals $19,200 for the 48 working days. Your consideration of this matter will be greatly appreciated. Please contact me or Garreth Campbell at (972) 304-3679 if you have any questions or comments. Assistant City Engineer cc: Ken Griffin P.E., Dir. of Public Works/City Engineer Garreth Campbell, Construction Inspector attachments CITY OF COPPELL P.O. BOX 478 COPPELL, TEXAS 75019 Periodical Estimate No. Three Project: 16" Water Main /Denton Tap Project No: ST 94-01 WA Fund: Original Contract Amount: Plus Change Orders: Value of Work to Date: $263,676.00 -0- $227, 338. O0 P-m UNIT No. DESCRIPTION OF MEASURE I Remove plug &connect LS existing 16' WL 2 Remoe plug &connect LS existing 12' WL 3 6" PVC DR-14 WL LF 4 12' PVC DR-14 WL LF 5 12" DI Class 250 LF Polywrapped WL 6 16" DI Class 250 LF Polywrapped WL 7 6" Gate Valve EA 8 12" Gate Valve EA 9 16' Vertical Seated Gate EA Valve I0 Fire Hydrant EA 11 R & R existing FH EA 12 Cast Iron Fittings TON 13 6' Blow-off Valve EA 14 Concrete encasement for LF 16' WL 15 Asphalt Pavement R & R LF 16 Existing Gravel Driveway LF Repair Period: 7/1/96 to 7/30/96 Contractor: J. C. Evans Construction, Inc. Address: 3900 Valley View Dr. Irving, Texas 75062 Original Contract Time: 60 WD With Adjustments: 60 WD Time Charged to Date: 60 WD UNIT OR~Gn~AL QUANTITY VA~.UE OF PRICE ESTIMAIliD COMPLETED COMPLETIiD BID QUANTITY TO DATE WORK 1,000.00 I I 1,000.00 1,000.00 1 -0- -0- 30.00 67 67 2,010.00 35.00 455 455 15,925.00 37.00 558 542 20,054.00 40.00 3,117 3117 124,680.00 500.00 6 6 3,000.00 1,000.00 7 7 7,000.00 3,200.00 4 4 12,800.00 1,500.00 3 3 4,500.00 800.00 I I 800.00 2,500.00 6.2 6.2 15,500.00 800.00 I I 800.00 15.00 8 8 120.00 30.00 48 48 1,440.00 10.00 48 -0- -0- Page 1 Periodical Estimate No. Three Project: 16 Water Main / Denton Tap ST 94-01 WA ITEM UNIT NO. DESCRIPTION OF MEASURE 17 R & R existing metal beam LF Guard Fence 18 R & R existing Fence LF 19 Crushed Stone at Trench CY 20 - 6' Barrier Fence LS 21 Elevated 12" WL crossing LS 22 Silt Fence non-reinforced LF 23 Silt Fence w/reinforced LF 24 12" high Rock Berm/ LF Silt Dam 25 Hydromulch Seeding AC 26 Broadcast Seeding AC 27 Trench Excavation Safety LF 28 1" Flush Valve EA 29 2" Flush Valve EA 30 Minimum 21" Steel Casing LF Remarks: Recommended for payment by: Approved by City Engineer: Date: Period: 7/196 to 7/30/96 UNIT ORIGINAL QUANTITY PRICE ESTIMATED COMPLETED BID QUANTITY TO DATE 20.00 64 -0- VALUE OF COMPLETED WORK -0- 3.00 1,139 -0- -0- 10.00 100 40 400.00 3, 140.00 1 -0- -0- 25,094.00 I I 25,094.00 4.00 20 -0- -0- 5.00 12 -0- -0- 1,500.00 .30 -0- 700.00 .60 -0- 1.00 3,209 3,444 350.00 I 1 500.00 3 3 25.00 455 545 Value of Original Contract Performed: -0- 3,~a. .00 350.00 1,500.00 13,625.00 $ 254,042.00 Value of Extra Work Performed: Total Value of Work to Date: Less Retainage 5% Total, Less Retainage Less Previous Payment(s): Current Payment Due: $ 17,382.50 $ 271,424.50 $13,571.23 $ 257,853.27 $ 215,971.10 ~$.41,88~.1~7 Page 2 CHANGE ORDER NO: 0tie EXTRA WORK PERFORMED DATE OF APPROVAL: l,'m UNIT UNIT No. DESCRIFFION OF PRICE MEASURE BID 12 CI Fittings TON 2500.00 15 Asph. R&R LF 30.00 27 Trench Safety LF 1.00 31 8" Gate Valve EA 800.00 32 8" PVC LF 49.50 8/6/96 ORIGINAL QUANTITY F..VrlMATED COMPLETED QUANTITY TO DATE .99 .99 48 48 235 235 2 2 235 235 VALUE OF COMPLETED WORK 2,475.00 1,440.00 235.00 1,600.00 11,632.50 TOTAL $17,382.50 Page 3 WIER & A..S..SEII::IATE.S, INC. April 13, 1996 Mr. Ruben Garza J.C. Evans Construction Co., Inc. 3900 Valley View Drive Irving, TX 75062 Re: W&A #94-093; Denton Tap Road Reconstruction; Coppell, Texas Dear Ruben: The City has executed the agreement effective April 12, 1996. Enclosed please find two (2) copies of the agreement. One is for J.C. Evans Construction Company and the other copy is for the bonding company. The project start must occur within ten (10) days or on or before April 22, 1996. The City will contact you to schedule a pre-construction conference which must occur prior to beginning any construction. Please contact me if you have questions. Very truly yours, ULYS III, P.E., R.P.L.S. UTL:tc cc: Mike Martin w/three (3) executed documents Enclosed: Two (2) copies of executed documents