Town Center L3B3-CS020116 T H Ir C I T Y 0 F
COPPEI .
January 16, 2002
Lee South
Mycon Construction, Inc.
208 E Louisiana, #208
McKinney, TX 75069
Fax 972-562-0009
Post*it' Fax Note 7671 3ate ~/~/0 Z Ipages
'to LEE. ,SnlITH
~#qla. 5~2. OoOq
RE: 1't American Bank (Town Center Addition, Lot 3, Block 3)
Dear Lee:
A pre-construction conference on the referenced project has been scheduled for Tuesday, January
22, 2002 at 2:00 p.m., in the second floor conference room in Town Center at 255 Parkway
Blvd.
Please notify the franchised utility companies, contractors, sub-contractors, testing lab and any
other interested parties so that they may have a representative present. If you should have any
questions concerning this project, please feel free to call me at (972) 304-3684.
MESSRGE
CONF I RMAT I ON
O1/17/2OO2 16:06
ID=CITY OF CoPPELL ENGR. DEPT.
DATE TIME S,R-TIME DISTANT STATION ID MODE PAGES
01/17 16:06 00'26" 972-529-0009 CALLING 01
RESULT
OK 0000
From: Rhonda Brothers
To: 2nd Floor Conference; Gary Johnson; Glenn Hollowell; Greg Jones; John Elias; Lee
Stone; Michael Corder; Rhonda Brothers; Roland Asebedo; Travis Crump
Date: 1/22/02
Time: 2:00PM - $:45PM
Subject: Pre-construction Mtg.
Place: 2nd Floor Conference
1st American Bank (Town Center Addition, Lot 3, Block 3)
Rhonda Brothers
Engineering Dept. Secretary