Loading...
Town Center L3B3-CS020116 T H Ir C I T Y 0 F COPPEI . January 16, 2002 Lee South Mycon Construction, Inc. 208 E Louisiana, #208 McKinney, TX 75069 Fax 972-562-0009 Post*it' Fax Note 7671 3ate ~/~/0 Z Ipages 'to LEE. ,SnlITH ~#qla. 5~2. OoOq RE: 1't American Bank (Town Center Addition, Lot 3, Block 3) Dear Lee: A pre-construction conference on the referenced project has been scheduled for Tuesday, January 22, 2002 at 2:00 p.m., in the second floor conference room in Town Center at 255 Parkway Blvd. Please notify the franchised utility companies, contractors, sub-contractors, testing lab and any other interested parties so that they may have a representative present. If you should have any questions concerning this project, please feel free to call me at (972) 304-3684. MESSRGE CONF I RMAT I ON O1/17/2OO2 16:06 ID=CITY OF CoPPELL ENGR. DEPT. DATE TIME S,R-TIME DISTANT STATION ID MODE PAGES 01/17 16:06 00'26" 972-529-0009 CALLING 01 RESULT OK 0000 From: Rhonda Brothers To: 2nd Floor Conference; Gary Johnson; Glenn Hollowell; Greg Jones; John Elias; Lee Stone; Michael Corder; Rhonda Brothers; Roland Asebedo; Travis Crump Date: 1/22/02 Time: 2:00PM - $:45PM Subject: Pre-construction Mtg. Place: 2nd Floor Conference 1st American Bank (Town Center Addition, Lot 3, Block 3) Rhonda Brothers Engineering Dept. Secretary