U-Haul-CS020104Baird, Hampton & Brown, Inc.
Engineering & Surveying
January4,2002
Mr. Kenneth M. Griffin, PE
Director of Engineering & Public Works
The City of Coppell
255 Parkway, PO Box 478
Coppell, Tx 75019
Te1(972)304-3686, Fax (972)304-3673
RE'. U-HAUL ADDITION, LOT 1, BLOCK 1
Mr. Griffin:
We've received your Plan Review Comments, dated December 10th '01, and have incorporated them into
the enclosed final set of construction plans. Furthermore, with regard to drainage across the solid
screening wall (comment 2), please see detail on Sheet C0.11
Thank you,
BHB Engineering & Surveying
Kon~, P~"'~
Vice President
Enclosure:
2 Sets of Corrected/Final Plans
City's Marked-Up Set of Plans
E:~001.000.000\017\2001.017.004\D OC~KEN GRIFFIN.DOC
309W. 7thStreet, Suite500 FortWorth, Texas76102 Te1:817-338-1277 Fax:817-338-9245 E-Mail:mail@bhbinc.com