Loading...
Victory at Coppell CS-250606 ARIZONA NEW MEXICO OKLAHOMA TEXAS 3030 LBJ Freeway, Suite 1660, Dallas, TX 75234 (972) 248-3006 | www.leeengineering.com Page 1 of 4 June 6, 2025 Mr. Patrick Filson Kirkman Engineering 5200 State Highway 121 Colleyville, TX 76034 Re: Victory Coppell Trip Generation Comparisons Dear Mr. Filson: The TIA for the proposed Victory Coppell development, to be located east of Belt Line Road between Dividend Drive and Hackberry Road in Coppell, Texas, was finalized in September 2022. As part of the development process, the land use components within the development were modified. An initial update to the impacts of the land use changes was provided in a December 2022 trip generation update letter. Since then, the land use components within the development have again changed and this document estimates the number of trips generated by the land uses in the latest Site Plan (dated 6/29/2024) and provides a comparison to both the trips generated in the September 2022 TIA and the December 2022 trip generation update letter. LAND USE DIFFERENCES The current Site Plan (dated 6/29/2024) is provided in Figure 1. The amount of each type of land use for each of the three (3) site plans is summarized in Table 1. Table 1: Land Use Differences Between Site Plans Land Use September 2022 December 2022 6/29/2024 Site Plan Retail (sq ft) 25,893 53,105 32,339 Grocery (sq ft) 21,600 0 0 Restaurant (sq ft) 25,282 25,800 19,296 Patio (sq ft) 3,900 2,300 1,500 QSR (sq ft) 5,200 6,000 7,100 Office (sq ft) 25,000 35,000 0 Medical Office (sq ft) 4,000 4,000 0 Banquet Hall (sq ft) 7,500 0 0 TOTAL (sq ft) 1 118,375 126,205 60,235 Daycare (students) 200 200 0 Hotel (rooms) 0 0 285 1 Excludes the square feet of the Daycare and Hotel land uses Page 3 of 4 TRIP GENERATION DIFFERENCES The number of trips generated by the proposed development was estimated based on the trip generation rates and equations provided in the publication entitled Trip Generation Manual, 11th Edition, by the Institute of Transportation Engineers (ITE). Estimates of the number of trips generated by the site were made for the AM peak and PM peak hours, as well as on a daily basis. The trip generation characteristics for the proposed Victory Coppell development are provided in Table 2. Table 2: Trip Generation Characteristics for Proposed Victory Coppell Development (6/29/2024 Site Plan) Land Use ITE Code Variable (X) Average Weekday AM Peak Hour PM Peak Hour Equation/Rates 1 Hotel 310 Rooms T = 10.84(X) – 423.51 T = 0.50(X) – 7.45 T = 0.74(X) – 27.89 Shopping Plaza (40-150K) 821 1,000 sq ft GLA T = 67.52(Y) T = 1.73(Y) T = 5.19(Y) Directional Splits 2 Hotel 310 Rooms 50 / 50 56 / 44 49 / 51 Shopping Plaza (40-150K) 821 1,000 sq ft GLA 50 / 50 62 / 38 49 / 51 Total Trips Land Use Amount Variable (X) Total Enter Exit Total Enter Exit Total Enter Exit Hotel 285 Rooms 2,666 1,333 1,333 135 76 59 183 93 90 Shopping Plaza (40-150K) 60.235 1,000 sq ft GLA 4,068 2,034 2,034 104 64 40 313 153 160 Total Trips 6,734 3,367 3,367 239 140 99 496 246 250 1 T = Trips Ends; X = # of Rooms; Y = 1,000 ft2 GLA 2 XX / YY = % entering vehicles / % exiting vehicles The number of estimated trips under the current Site Plan (6/29/2024) were compared to the trip generation information presented in the September 2022 TIA and the December 2022 trip generation update letter. A comparison of the estimated number of currently proposed site trips to the previous submittals is provided in Table 3. Table 3: Trip Generation Differences from Previous Submittals Total Trips Total Enter Exit Total Enter Exit Total Enter Exit September 2022 TIA 11,458 5,729 5,729 563 336 227 1,172 567 605 Current Site Plan (6/29/2024) 6,734 3,367 3,367 239 140 99 496 246 250 Difference in Trips from September 2022 -4,724 -2,362 -2,362 -324 -196 -128 -676 -321 -355 Total Enter Exit Total Enter Exit Total Enter Exit December 2022 Trip Generation Memo 9,340 4,670 4,670 358 209 149 789 384 405 Current Site Plan (6/9/2024) 6,734 3,367 3,367 239 140 99 496 246 250 Difference in Trips from December 2022 -2,606 -1,303 -1,303 -119 -69 -50 -293 -138 -155 As seen by the results in Table 3, the number of trips estimated to be generated by the proposed development under the current Site Plan (6/29/2024) is predicted to be less than the previous submittals under all time periods (weekday daily, weekday AM peak hour, weekday PM peak hour). Page 4 of 4 CONCLUSIONS Based on this evaluation, the current Site Plan (6/29/2024) is predicted to result in fewer site generated trips than identified in the previous 2022 submittals. We appreciate the opportunity to provide these traffic engineering services for you. Please contact me if you have any questions or need further assistance. Sincerely, Kelly D. Parma, P.E., PTOE Senior Project Manager Lee Engineering, LLC (TBPE Firm F-450)