U-Haul-CS020108Baird, Hampton & Brown, Inc. Engineering & Surveying
Januaw 8,2002
Mr. Kenneth M. Griffin, PE
Director of Engineering & Public Works
The City of Coppell
255 Parkway, PO Box 478
Coppell, Tx 75019
Te1(972)304-3686, Fax (972)304-3673
RE: M~HAU'L ADDITION, LOT 1, BLOCK 1
Mr. Griffin:
Per our e-mail discussions, please find enclosed a check to the City of Coppell, in the amount of
$21,422.88, for the impact fees associated with the referenced project.
Thank you,
Konstantin-e Bakintas, P~
Vice President
05~758
Received From
Address I~-J"{"J~.J--- Jl~)/~!'[-j ol~J ; L~3"J-'/;t~JLOC'~ j
)By
309 W. 7th Street, Suite 500 Fort Worth, Texas 76102 Tel: 817-338-1277 Fax: 817-338-9245 E-Mail: mail@bhbinc.com