Loading...
Gigabit-PT251203Install conduit in DART ROW to connect existing Gigabit facilities. 12/02/2025 SWL CONTACT CITY OF COPPELL ROW INSPECTOR TYLER BOYER (469-978-0818, tboyer@coppelltx.gov) PRIOR TO ANY CONSTRUCTION ACTIVITY Depth of 8" SS field measured at approximately 14 ft deep at this SSMH FREEPORT PKWY FREEPORT PK W Y 1+00 2+00 2+80 0+00 102° 102° 0027.9 0 32.9494278 -97.0107834 DART RAIL LINE35'4'40'35'65'DRIVEWAYDRIVEWAY39'31'B U R I E D F I B E R C A U T I O N A C T I V E G I G A B I T O P T I C C A B L E BURI E D FI B E R CAU TI O N ACTI V E GI G A BI T OPTI C C A B L E STA. 0+00 TO STA. 2+80 DIR.BORE (280') 1-86" HDPE CASING E/W 2-1.25" HDPE 864ct FIBER OPTIC CABLE STA. 0+00 PROP. 4X4 BORE PIT LAT: 32.915608 LONG: -97.126431 STA. 2+80 PROP. 4X4 BORE PIT LAT: 32.915608 LONG: -97.126431148'66'120'XXXX XXXXXXXXX4'4'100' 100'DART RAIL LINE14 SCALE EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT, THESE DRAWINGS AND SPECIFICATIONS S H A L L R E M A I N T H E P R O P E R T Y O F M C I COMMUNICATIONS SERVICES INC. BOTH BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BE REPRODUCED, COPIED, OR USED FOR ANY PURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION.TITLE: FIBER OPTIC CABLE ROUTEOUTSIDE PLANT CONSTRUCTIONINNERCITY FIBERNET, LLCDBAGIGABIT FIBERDATE: ENGINEER: CHECKED BY: HORIZONTAL: VERTICAL: SHEET OF FILE:GIGABIT FIBER - COPPELLREVISIONS DATE DESCRIPTION BYNo. COBBFENDLEY CP 10/17/2024 DRAWN BY: N/A COPPELL ,TX COPPELL, TX15 CITY OF COPPELL PROJECT:P2024-01-FTW2 COPPELL_FTW to Ring 2- 125,803 CITY OF COPPELL CONFIDENTIAL FOR PROPRIETARY USE ONLY EXCEPT AS MAY BE OTHERWISE PROVIDED THIS DRAWING SHALL REMAIN THE PROPERTY OF GIGABIT FIBER AND SHALL NOT BE REPRODUCED, COPIED OR USED FOR ANY PURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION. SM 1:50 DALLAS COUNTY COPPELL, TX SEE PROFILE ON SHEET 15 CALL BEFORE YOU DIG HOURS NOTICE REQUIRED 1-800-245-4545 48 NOTE: UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. IT IS THE CONTRACTOR RESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS AND UTILITIES PRIOR TO CONSTRUCTION. COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR. CAUTION !!!! CONTRACTOR TO LOCATE & VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION CAUTION!!! EXIST. BURIED FIBER, TELEPHONE, CATV, GAS, ELECTRIC, WATER, SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREA AND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT LOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING. NOTE: CONTRACTOR TO VERIFY EXISTING GIGABIT TIE-IN POINT PRIOR CONSTRUCTION. Know what's below. before you dig.Call RNOTE: RIGHT OF WAY LINES WERE ESTABLISHED BY RESEARCH OF PUBLIC INFORMATION. NO BOUNDARY SURVEY OR PROPERTY LINE SURVEY WAS ESTABLISHED BY COBB FENDLEY & ASSOCIATES. RIGHT OF WAY BOUNDARY MUST BE FIELD VERIFIED BY A REGISTERED PROFESSIONAL LAND SURVEYOR TO ACCURATELY VERIFY RIGHT OF WAY AND PROPERTY LINES PRIOR TO CONSTRUCTION. NOTE: •CALL LOCATES 48HRS IN ADVANCE. HAVE ALL UTILITIES MARKED. CONTACT APPROPRIATE RR AUTHORITIES. •SET UP THE NECESSARY TRAFFIC CONTROL, FLAGGERS, AND PERSONAL PROTECTION FOR THE WORKERS. •REVIEW THE PLANS ONSITE AND FOLLOW THROUGHOUT THE JOB. •PREPARE MACHINERY AND MATERIALS •POTHOLE ALL UTILITIES VIA HYDRO-EXCAVATION •FINAL WALK THRU WITH INSPECTOR •START CONSTRUCTION. HORIZONTAL DIRECTIONAL BORE. •PULL THROUGH CASING. PULL THROUGH DUCT. •CLEAN AND MAKE SAFE CONSTRUCTION SITE AND REPAIR THE AREA. STA. 0+00 TO STA. 2+80 DIR. BORE (280') 1-6" HDPE CASING TWO (2) 1.25" HDPE SDR 11 ONE (1) 1.86" 4-WAY E/W 864ct FIBER OPTIC CABLE W/10GA TRACER WIRE EXHIBIT A14 EXHIBIT A-14 City of Coppell 8" sanitary sewer Depth of 8" SS field measured at approximately 14 ft deep at this SSMH 0+00 2+001+00 SCALE HOR: 1" = 50 PROFILE WEST SIDE OF FREEPORT PKWY LOOKING EAST VER: 1" = 10' 520 530 510 3+00 540 PROP. 4'X4' BORE PIT PROP. 4'X4' BORE PIT DIR. BORE (280') 1-86" 4-WAY E/W 2-1-25" HDPE SDR 11BEG. DIR. BORESTA 0+00BEG. 1-86" 4-WAYEND. DIR. BORESTA 2+80END. 1-86" 4-WAY864ct FIBER OPTIC CABLE20'DEPTH520 530 510 540 500 5008' SEPARATION7' SEPARATION7' SEPARATION15 SCALE EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT, THESE DRAWINGS AND SPECIFICATIONS S H A L L R E M A I N T H E P R O P E R T Y O F M C I COMMUNICATIONS SERVICES INC. BOTH BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BE REPRODUCED, COPIED, OR USED FOR ANY PURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION.TITLE: FIBER OPTIC CABLE ROUTEOUTSIDE PLANT CONSTRUCTIONINNERCITY FIBERNET, LLCDBAGIGABIT FIBERDATE: ENGINEER: CHECKED BY: HORIZONTAL: VERTICAL: SHEET OF FILE:GIGABIT FIBER - COPPELLREVISIONS DATE DESCRIPTION BYNo. COBBFENDLEY CP 10/17/2024 DRAWN BY: N/A COPPELL ,TX COPPELL, TX15 CITY OF COPPELL PROJECT:P2024-01-FTW2 COPPELL_FTW to Ring 2- 125,803 CITY OF COPPELL CONFIDENTIAL FOR PROPRIETARY USE ONLY EXCEPT AS MAY BE OTHERWISE PROVIDED THIS DRAWING SHALL REMAIN THE PROPERTY OF GIGABIT FIBER AND SHALL NOT BE REPRODUCED, COPIED OR USED FOR ANY PURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION. SM 1:50 DALLAS COUNTY COPPELL, TX CALL BEFORE YOU DIG HOURS NOTICE REQUIRED 1-800-245-4545 48 Know what's below. before you dig.Call R NOTE: UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. IT IS THE CONTRACTOR RESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS AND UTILITIES PRIOR TO CONSTRUCTION. COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR. CAUTION!!! EXIST. BURIED FIBER, TELEPHONE, CATV, GAS, ELECTRIC, WATER, SANITARY SEWER & STORM SEWER FACILITIES IN CONSTRUCTION AREA AND HAVE NOT BEEN FIELD LOCATED, CONTRACTOR TO VERIFY EXACT LOCATION AND DEPTH PRIOR TO ANY DIGGING AND/OR BORING. NOTE: RIGHT OF WAY LINES WERE ESTABLISHED BY RESEARCH OF PUBLIC INFORMATION. NO BOUNDARY SURVEY OR PROPERTY LINE SURVEY WAS ESTABLISHED BY COBB FENDLEY & ASSOCIATES. RIGHT OF WAY BOUNDARY MUST BE FIELD VERIFIED BY A REGISTERED PROFESSIONAL LAND SURVEYOR TO ACCURATELY VERIFY RIGHT OF WA Y AND PROPERTY LINES PRIOR TO CONSTRUCTION. STA. 0+00 TO STA. 2+80 DIR. BORE (280') 1-6" HDPE CASING TWO (2) 1.25" HDPE SDR 11 ONE (1) 1.86" 4-WAY E/W 864ct FIBER OPTIC CABLE W/10GA TRACER WIRE END. DIR. BOREEND. 1-4" HDPE CASING1-6"BEG. DIR. BOREBEG. 1-4" HDPE CASING1-6"EXHIBIT A-15 Updated Depth to 20' to avoid Water at 14.5', SS at 15' and Lumen line at 18' Depth of 8" SS field measured at approximately 15 ft deep.