Loading...
PA9702-LR 991214 I-BC REPORT OF STRUCTURAL STEEL INSPECTI ,N EN(3~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 12/02/1999 Report No.: 9932371 Report Date 12/14/1999 Client No.: COPPELL ProjectNo.: 94991118 Client: CityofCoppell Project: CoppellAquatie/ReereationCtr Attn: Brad Reid 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. ~96051 Services: Structural steel inspection. On this date, an HBC Engineering representative arrived at the above referenced jobsite as scheduled for structural steel inspection. A visual inspection was conducted as noted below. Low Roof Level Framing between lines B.1 to D and 2 to Ri: 1. Metal deck installation, 12 noncompliant puddle welds were found throughout this area. High Roof Level Framing between lines D to F and -1 to 7.6: 1. Metal deck installation was not complete at south side perimeter, line F, was missing half sheet of closure deck. a. Puddle welds, 42 noncompliant locations were found through- out this area. b. Side lap screws were determined to be compliant with the exception at south side perimeter lap. Technician: Randy Walcker ~ .~..~ring, Inc. Report Distribution: (I) City of Coppcll (1) City ofCoppell - Engineering (1) BrinkIcy Sargent Architects (1) City ofCoppel] - Bldg. |nsp. Paul D. Smith, P.E. ( I ) Turner Engineers ( ~ ) City of Coppelt - Leisure Serv Dept Senior Project Engineer (1) Hisaw & Associates This report is exclusively for the use of the c]ient indicated above and shall not be i~eproduced except in full without the written approval of HBC Engineering, Inc. 99SDS Page I of I