Loading...
ST9401WA-CS 960708CJQIIQS water uTIlITIes ENGINEERING 320 East Jefferson Dallas, Texas 75203 (214) 948-4560 July 8, 1996 Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer City of Coppell, Texas Re: Denton-Tap Road from Cottonwood Creek to Lewisville C.L. Dear Y~'. Griffin: The proposed paving and drainage plans for Denton-Tap Road at S.H. 121 Bypass have been reviewed. Your plans indicate that the TXDOT Bypass is expected to be completed prior to the Denton-Tap construction. If this is the case, Dallas Water Utilities Department anticipates no involvement in your project, since the water manhole cover and valve cover at the dividing line between TXDOT pavement and Denton-Tap Road will already be adjusted to final grade in conjunction with the Bypass construction. As a note of caution, your storm lateral "A-17" on sheet 20 may need to be field adjusted with a grade-break under the existing 30" water main to provide adequate (0.5') clearance. Should you have any questions, feel free to call Jun Battad at 948-4591. Brian H. Cowan, P.E. Project Manager Re locat ions / DART c: J. Milstead J. Battad File 96170MF2.GriffinDT A city utility providing Dallas with water purification and distribution, waste water collection and treatment