CF-Coppell Rd SC-LR020105Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REINFORCING STEEL PLACEMENT INSPECTION
CLIENT: Texas Unified Constructors, Inc.
DATE: 5 January 2002
PROJECT:
Field Service Offices & Maintenance Facility
C0ppell, TX
JOB NO. 01.1054
TIME: 2.0 hours OT
AREA INSPECTED: Slab on grade at vehicle/equipment storage building
DATE OF INSPECTION: 1/5/02 (1:30pm-3:3Opm)
DEFICIENCIES NOTED:
NUMBER
LOCATION/iTEM DESCRIPTION
CORRECTIONS
OBSERVED
1
2
3
4
Vapor barrier incomplete.
Slab reinforcing (#4 @ 12" on center each way) incomplete.
Chairs incomplete,
Smooth dowels at saw joints missing (ref. 04/S1,01 ).
TECHNICIAN:
DISTRIBUTION:
MFM
(3) City of Coppell
(1) Vidaud & Associates
(1) Doyle Engineering Group
(1) Texas Unified Constructors, Inc.
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148