Loading...
Lovett Coppell BP-PT241009Page 1 of 3CONS24-07-032385 CONSTRUCTION DEVELOPMENT PERMIT Name of Applicant Date SubmittedRhyan Weirich 7/31/2024 Address of Applicant 2600 N Central EXPY 400, Richardson, TX 75080 Phone Number Email(713) 410-0515 rhyan.weirich@kimley-horn.com Project Name Description Lovett Coppell Mass Grading (Lovett Coppell Business Park, Lots 1-3, Block A & Lovett Addition, Lot 1, Block A) Location of Construction 500 W SH 121, Coppell, TX Subdivision AcreageLovett Addition & Lovett Coppell Business Park Section Block LotA 1 Location Description Intersection of 121 and Business 121 1. Type of proposed construction or development: Non-Residential 2. Description of Construction Permit requested: : Excavation, Fill Area Provide an attachment containing the name and 24-hr. contact phone number of supervisor(s) for every contractor working under this general permit. 3. All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance. Amount Due: Date Paid: > Any work requiring closure of a lane of traffic, street, or alley must be approved in advance by the Engineering Dept., with notification to the following prior to closure: Police Department @ 972-304-3600 Fire Department @ 972-304-3512 Street Department @ 972-462-5150 Engineering Dept. @ 972-304-3679 NOTE: Street closures are allowed from 9:00 a.m. until 3:30 p.m. ONLY unless otherwise approved by City Engineer. > Provide barricade plan / trench safety plan of a lane or street closure. (Required) > It is a requirement of this permit that As-Built Drawings be turned in at the end of this project. As-Builts consist of a .pdf and CD with Autocad .dwg files. Printing your name indicates your acceptance of the terms and conditions of this form: $741.44 9/24/2024 Page 2 of 3CONS24-07-032385 Rhyan Weirich Signature of Applicant Contact Number (713) 410-0515 Signature of Inspector Contact Number NoIs the fill area located in an identified flood hazard area? FOR CITY USE ONLY If YES, a Floodplan Development Permit is required before any construction can begin. Has a Floodplain Development Permit been issued?No City Approval Date Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. Rev. 12-2023 Review and Inspection Fee Calculation Sheet Project Name: Date: Per the City of Coppell Subdivision Regulations, the Developer shall pay review and inspection fees for the items to be reviewed and inspected by the Engineering Department. Review fees are charged at $150/hr with a 4-hour minimum based on the rates below. Inspection fees are charged at $120/hr with a 4-hour minimum based on the rates below. Review fees are due upon permit submittal. Inspection fees are due before the date of the Pre-construction Meeting. Quantity Review Fee Rate Calculated Review Fee Inspection Fee Rate Calculated Inspection Fee Paving Improvements SF Drainage Improvements LF Utility Improvements LF Sidewalk Improvements SF Grading Improvements SF Utility Taps Per Table Below Per Table Below Public Infrastructure Not Listed (hours estimated at time of submittal) Review: Inspection: Total: Water Service and Tap Quantity Review Fee Rate Calculated Review Fee Inspection Fee Rate Calculated Inspection Fee - Up to 2 Inches - 3 to 6 Inches - 8 Inches and Larger Sewer Service and Tap Additional reviews after 3 reviews ( of original review fee): _____________ Major plan revision ( of original review fee): _____________ Additional final walkthrough inspection (4 hours): $480.00 hr hr Lovett Coppell Mass Grading 8/5/2024 $0.03/SF $0.00 $0.12/SF $0.00 $1.50/LF $0.00 $1.20/LF $0.00 $0.75/LF $0.00 $1.20/LF $0.00 $0.075/SF $0.00 $0.48/SF $0.00 $0.002/SF $185.36 $0.006/SF $556.08 $0.00 $0.00 $150/hr $0.00 $120/hr $0.00 $185.36 $556.08 0 $300 $0.00 $480 $0.00 $450 $0.00 $720 $0.00 0 $600 $0.00 $960 $0.00 0 $300 $0.00 $480 $0.00 $37.07 $92.68 0 0 0 0 92,680 20% 50%