SC-Coppell HS-PT240826Page 1 of 3CONS24-02-030658
CONSTRUCTION DEVELOPMENT PERMIT
Name of Applicant Date SubmittedDrew Anderson 5/22/2024
Address of Applicant
Phone Number Email(972) 668-9340 drewanderson@coreconstruction.com
Project Name
Description CHS Fine Arts Rehearsal Building (Coppell High School Addition, Lot 1R, Block 1)
Location of Construction 185 PARKWAY BLVD, Coppell,
Subdivision AcreageCoppell High School Addition 64
Section Block Lot1 1R
Location Description Coppell High School
1. Type of proposed construction or development:
Non-Residential
2. Description of Construction Permit requested:
: Excavation, Fill Area
Provide an attachment containing the name and 24-hr. contact phone number
of supervisor(s) for every contractor working under this general permit.
3. All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision
Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The
contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance.
Amount Due: Date Paid:
> Any work requiring closure of a lane of traffic, street, or alley must be approved in advance by the
Engineering Dept., with notification to the following prior to closure:
Police Department @ 972-304-3600
Fire Department @ 972-304-3512
Street Department @ 972-462-5150
Engineering Dept. @ 972-304-3679
NOTE: Street closures are allowed from 9:00 a.m. until 3:30 p.m. ONLY
unless otherwise approved by City Engineer.
> Provide barricade plan / trench safety plan of a lane or street closure. (Required)
> It is a requirement of this permit that As-Built Drawings be turned in at the end of this project.
As-Builts consist of a .pdf and CD with Autocad .dwg files.
Printing your name indicates your acceptance of the terms and conditions of this form:
N/A N/A
Page 2 of 3CONS24-02-030658
Drew Anderson
Signature of Applicant Contact Number
(972) 668-9340
Signature of Inspector Contact Number
NoIs the fill area located in an identified flood hazard area?
FOR CITY USE ONLY
If YES, a Floodplan Development Permit is required before any construction can begin.
Has a Floodplain Development Permit been issued?No
City Approval Date
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or
cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking,
excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is
granted.