Loading...
SC-Coppell HS-PT240826Page 1 of 3CONS24-02-030658 CONSTRUCTION DEVELOPMENT PERMIT Name of Applicant Date SubmittedDrew Anderson 5/22/2024 Address of Applicant Phone Number Email(972) 668-9340 drewanderson@coreconstruction.com Project Name Description CHS Fine Arts Rehearsal Building (Coppell High School Addition, Lot 1R, Block 1) Location of Construction 185 PARKWAY BLVD, Coppell, Subdivision AcreageCoppell High School Addition 64 Section Block Lot1 1R Location Description Coppell High School 1. Type of proposed construction or development: Non-Residential 2. Description of Construction Permit requested: : Excavation, Fill Area Provide an attachment containing the name and 24-hr. contact phone number of supervisor(s) for every contractor working under this general permit. 3. All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance. Amount Due: Date Paid: > Any work requiring closure of a lane of traffic, street, or alley must be approved in advance by the Engineering Dept., with notification to the following prior to closure: Police Department @ 972-304-3600 Fire Department @ 972-304-3512 Street Department @ 972-462-5150 Engineering Dept. @ 972-304-3679 NOTE: Street closures are allowed from 9:00 a.m. until 3:30 p.m. ONLY unless otherwise approved by City Engineer. > Provide barricade plan / trench safety plan of a lane or street closure. (Required) > It is a requirement of this permit that As-Built Drawings be turned in at the end of this project. As-Builts consist of a .pdf and CD with Autocad .dwg files. Printing your name indicates your acceptance of the terms and conditions of this form: N/A N/A Page 2 of 3CONS24-02-030658 Drew Anderson Signature of Applicant Contact Number (972) 668-9340 Signature of Inspector Contact Number NoIs the fill area located in an identified flood hazard area? FOR CITY USE ONLY If YES, a Floodplan Development Permit is required before any construction can begin. Has a Floodplain Development Permit been issued?No City Approval Date Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted.