Loading...
SW0201-AG011211 AGENDA REQUEST COFFELL 'i . ) C~''~1 CITY COUNCIL MEETING: D~e~mber 11, 2~01 ITEM ITEM CAPTION: Consider approval of extending Bid/Contract #Q-0101-03 for the FY2001/02 Sidewalk Replacement Program to Quantum Contracting Inc. in an amount not to exceed $120,000 as budgeted. AP RO cO STAFF COMMENTS: Quantum Contracting Inc. was the Iow bidder for the FY 2000/01 Sidewalk Replacement Program. The contract with Quantum included provisions for the City to extend the contract for a one-year period with a maximum number of three extensions. The contract also provided a mechanism for the contractor to request a price determination based upon direct cost increase, wage and labor rate increase, etc. Quantum has requested an increase from last years price of $4.95/per square foot to $5.20/per square foot. Because Quantum Contracting Inc. was responsive and performed an excellent job for the City of Coppell in 2001 my recommendation is for the City Council to extend Bid #Q-0101-03 in an amount not to exceed $120,000 for the FY 2001/02 Sidewalk Replacement Program. This years project will complete all sidewalk requests that we have received as of November 21, 2001 (see attached list). This includes 130 separate requests for a total of 21,492 square feet. The additional funding over the $111,758.40 will allow flexibility when actual quantities differ from the initial measurements. Staff will be available to answer questions at the Council meeting. BUDGET AMT. $ FINANCIAL COMMENTS: AMT. EST. $ +\-BID $ Funds for this contract have been budgeted in the infrastructure Maintem DIR. INITIALS: IF FIN, REVIEW:~ CITY MANAGER REVIEW Agenda Request Form - Revised 5/00 Document Name: #engl Fund. QUANTUM CONTRACTING, INC. P. O. Box 430, Rockwall, Tx 75087-0430 Phone972-771-9511 (FAX) 1-972-722-1114 Via Fax October 11, 2001 Ken Griffin, City Engineer City of Coppell P O Box 478 Coppell, TX 75019 RE: Sidewalk Repairs, Project #SW-OI-O1 Mr. Griffin, It is my understanding that our contract for the referenced project can be extended at the consent of both parties for up to a three-year period. Quantum has appreciated working with you and your staffon the first phase of the sidewalk project as well as the Freeport Parkway Improvements project and we are certainly willing to undertake additional work at your discretion. Our sidewalk crew should wrap up an ongoing project with the City of Richardson around the first week in November. If you expect to do additional sidewalk repair this fall or winter, please let me know as soon as possible so I can schedule the work. I respectfully request the City of Coppell grant an additional .25 cent/s, f., which would raise the cost from $4.95 to $5.20 for the year 2002. Sincerely, R. J. Evans, Jr. Vice President SIDEWALK PAVEMENT REPAIRS First Year Extension of Bid/iQ 0101-03 FY 2001/02 SPECIFICATIONS FOR SIDEWALK PAVEMENT REPAIRS 1. All repairs are to be saw cut full depth at locations determined in the field by the City of Coppell and are to be square or rectangular in shape. Complete removal of all sidewalk within the repair area is to be accomplished leaving clean vertical sides. Damaged vertical sides will be resawed, removed and replaced at the contractor's expense. Limit of pay will only be to the original saw line. Spoils from this activity and subgrade removal will be disposed of off-site at the contractor's expense. Subgrade shall be removed to a depth of 1" below bottom of the existing sidewalk and compacted to 95% standard proctor density. Then, 1" of fine, washed sand, free fi.om organic materials or clay shall be placed. If unstable material is encountered that has to be removed, then flexbase shall be placed and compacted to 95% standard proctor density to bring subgrade up to 1" below bottom of the existing sidewalk. 4. Vertical sides of repair area are to be doweled with//3 bars, epoxy embedded 6"into the sides at 12" centers. Reinforcement steel shall be minimum #3 bar on 24" centers transversely and//3 bar on 18" centers longitudinally and shall be supported by bar chairs spaced adequately to support the weight of the concrete during placement. 6. Concrete shall be Type I cement at a rate of 5 sacks per CY and a compressive stren~h of 3000 PSI at 28 days. Testing to be provided by contractor, at the sole expense of the contractor, through a City. approved laboratory. 7. Construction joints shall be per the City of Coppell Standard Specifications. 8. A traffic control plan is to be submitted for all job sites that is consistent with the TMUTCD for Engineering review. Implementation of the traffic control plan and all traffic control devices necessary for a safe work environment shall be provided at the sole expense of the contractor. No portion of a street will be allowed for closure without a review by the City of Coppell. Traffic control devices shall be maintained at all times during construction. 9. A 24-month maintenance bond at 50% of total value, on a form provided by the City, will be provided by the successful bidder. 10. Reference the City of Coppell Standard Construction Details and Subdivision Ordinance for further clarification. 11. It is the contractor's responsibility to identify areas with irrigation systems, locate and protect existing system. All irrigation systems damaged will be repaired to as good or better and to the satisfaction of the property owner at the contractor's sole expense. CITY OF COPPELL * PURCHASING DEPARTMENT * 255 PARKWAY BOULEVARD · COPPELL,TEXA$ 75019 SIDEWALK PAVEMENT REPAIRS First Year Extension of Bid #Q 0101-03 FY 2001t~ 12. It is the contractor's responsibility to obtain utility locations. Any damage to existing utilities will be the sole responsibility of the contractor. Contractor will be responsible for backfilling behind the sidewalk and sodding the disturbed area with like turf. 13. It will be the responsibility of the contractor to provide written notification to affected residents in the vicinity of the repair area prior to the beginning of work. Information to be included will be beginning and end dates of project, road closure information and contact number(s). 14. Ail items necessary to complete the work including but not limited to traffic control plan, repair of irrigation systems, sodding, resetting existing signs, etc. are subsidiary to the price bid. 15. All the work contained in this contract lies within the city limits of the City of Coppell, Texas and shall be constructed according to the City of Coppell approved construction standards and specifications and the Standard Specifications for Public Works Construction, Third Addition and any amendments as adopted by the North Central Texas Council of Governments. 16. LABOR CLASSIFICATION AND MINIMUM WAGE SCALE The City of Coppell is the contracting agency for this construction project. The followhng statute requires any contracting agency to specify the generally prevailing rate of wages in contracts that are bid. Vernon's Texas Civil Statutes - Article 5159a: "Construction of Public Works in State and Municipal or Political Subdivisions; Prevailing Wage Rate to be maintained." Pursuant to the requirements of this statute, the City, of Coppell, has ascertained the following rates of wages are paid to various classifications of workers in the locality of this project. Not less than the following hourly rates shall be paid for the various classifications of work required by this project. Workers in classifications where rates are not identified shall be paid not less than the general prevailing rate of "laborer" for the various classifications of work therein listed. The hourly rate for legal holiday and overtime work shall be not less than one and one-half (1 & 1/2) times the base hourly rate. The rates specified are journeyman rates. Apprentices may be used on the project and may be compensated at a rate determined mutually by the worker and employer, commensurate with the experience and skill of the worker but not at a rate not less than 60% of the journeyman's wage as shown. At no time shall a journeyman supervise more than one (1) apprentice. All apprentices shall be under the direct supervision ora journeyman working as a crew. CITY OF COPPELL * PURCHASING DEPARTMENT * 255 PARKWAY BOULEVARD ,, COPPELL,TEXAS 75019 SIDEWALK PAVEMENT REPAIRS First Year Extension of Bid #Q 0101-03 FY 2001/02 SECTION I BID SHEET Q-01201-03 SIDEWALK FAILURES 1. 941 Tupelo 2. 903 Rolling Brook 3. 749 Sparrow 4. 128 Highland Meadow 5. 936 Redwing 6. 301 Parkmeadow 7. 155 Highland Meadow 8. 829 Blue Jay 9. Mapleleaf/alley at MacArthur 10. 243 Heatherglen 11. 217 Heatherglen 12. 158 E. Bethel 8O 172 146 44 110 108 272 25 136 55 16 104 TOTAL SQUARE FEET I, 68 CITY OF COPPELL * PURCHASING DEPARTMENT * ~ PARKWAY BOULEVARD * COPPELL,TEXA$ 75019 SIDEWALK PAVEMENT REPAII~ First Year Extension of Bid #Q 0101-03 FY 2001/02 SECTION II BID SHEET Q-01201-03 SIDEWALK FAILURES ~ Sauare Feet 13. 228 Parkmeadow 180 14. 419 Parkwood 80 15. 219Woodhurst 190 16. 225 Pinyon 230 17. 430 Clearcreek 280 18. 310 Lea Meadow 80 19. 512 Halifax 260 20. 1024 Mapleleaf 265 21. 1028 Mapleleaf 160 22. 1032 Mapleleaf 150 23. 526 Shadowcrest 220 24. 529 Shadowcrest 280 25. 530 Shadowcrest 220 26. 605 Shadowcrest 120 27. 840 Sugarberry 200 28. 901/upleo 25 29. 743 Swallow 36 30. 323 Willow Springs 280 31. 331 Willow springs 400 32. 147 Wynnpage 40 33. Wynnpage/Heatherwood 130 34. 243 Barclay 265 35. 167 Highland Meadow 144 CITY OF COPPELL · PURCHASING DEPARTMENT · 2~5 PARKWAY BOULEVARD *' COPPELL,TF-,XA$ 75019 SIDEWALK PAVEMENT REPAIR~ First Year Extension of Bid #Q 0101-03 FY 2001/02 BID SHEET Q-0101-03 SECTION II. SIDEWALK FAILURES ~ Sauare Feet 36 221 MacArthur 152 37. 232 Willow Springs 140 38. 236 Willow Springs 223 39. 708 Dove Cir. 156 188 40. 309 Parkview 41. 463 Clearcreek 100 172 42. 213 Penuel 43. 304 Woodhurst 148 240 44. 306 Woodhurst 152 45. 726 Swallow 2O8 46. 152 Finch 47. 483 Clearcreek 300 48. 163 Highland Meadow 216 49. 377 Parkmeadow 188 50. 475 Clearcreek 140 51. Flagstone/Firelight 90 52. 112 Mesquitewood 152 256 53. 113 Simmmons 245 54. 600 Phillips 55. 225 Parkmeadow 146 100 56. 826 Lockhaven 187 57. 609 Thompson 58. 118-122 Meadow Run 305 100 59. 429 Shadowcrest 80 60. 408 Moore CITY OF COPPELL * PURCHASING DEPARTMENT · 255 PARKWAY BOULEVARD · COPPELL,TEXA$ SIDEWALK PAVEMENT REPAIRS First year Extension of Bid gQ 0101-O3 FY 2001,02 SECTION II 61. 664 Quail 62. 719 Swallow 63. 349 Westwood 64. 131 Winding Hollow 65. 252 E. Bethel 66. 159 Newport 67. 527 Woodhurst 68. 403 Parkwood 69. 119 Highland Meadow 70. 123 Highland Meadow 71. 210 Barclay 72. 301 Barclay 73. 128 Cherrybark 74. 630 Cribbs 75. 510 Greenwich 76. 513 Parkview 77. 818 Bethel School 78. 825 Red Cedar Way 79. 233 Heartz 80. 342-406 Woodhurst BID SHEET Q-OlOl-O3 SIDEWALK FAILURES 208 328 45 262 4O 250 272 190 72 145 192 372 8O 40 156 100 28O 185 180 265 TOTAL SQUARE FEET 12,281 CITY OF COPPELL ,, PURCHASING DEPARTMENT * 255 PARKWAY BOULEVARD * COI'I'I~LL,TEXA$ 75019 SIDEWALK PAVEMENT REPAIRS First Year Extension of Bid gQ 0101-03 FY 2001/02 SECTION III BID SI-[EET Q-0101-03 SIDEWALK FAILURES 81. 240 Heatherglen 100 82. 244 Heatherglen 280 83. 729 Sparrow 360 84. 224 Steamboat 460 85. 228 Steamboat I00 86. 124 Landsdown 100 87. 538 Meadowview 324 88. 106 Meadow Run 100 89. 100 Deann 100 90. 104 Deann 200 91. 116Deann 120 92. 117Deann 80 93. 124 Deann 200 94. 125 Deann 280 95. 137 Deann 20 96. 902 Lenten Ct. 200 97. 715 Oriole 85 98. 939 RedcedarWay 80 99. 505 Shadowcrest 135 100. 518 Shadowcrest 80 101. 525 Shadowcrest 80 102. 545 Shadowcrest 400 103. 570 Shadowcrest 100 104. 317 Spring Oak 90 105. 333 Spring Oak 170 CITY OF COPPELL · PURCHASING DEPARTMENT · ~ PARKWAY BOULEVARD · COPPELL,TEXAS 75019 SIDEWALK PAVEMENT REPAIRS First Year Extension of Bid #Q 0101-03 FY 2001/02 SECTION III 106. 327 Willow Springs 107. 339 Willow Springs 108. 612 Quail 109. 319 Willow Springs 110. 312 Timber Ridge 111. 724 Robin 112. 728 Robin 113. 321 Meadowood 114. 121 Simmons 115. 240 WilloTM Springs 116. 247 Woodhurst 117. 718 Swallow 118. 729 Robin 119. 735 Oriole 120. 644 Phillips 121. 108 Deann 122. 330 Tanglewood 123. 334 Tanglewood 124. 108 Simmons BID SHEET Q-0101-03 SIDEWALK FAILURES 320 360 340 160 164 92 212 156 120 108 100 204 68 44 135 207 116 116 185 TOTAL SQUARE FEET 7,451 CITY OF COPPELL * PURCHASING DEPARTMENT * 255 PARKWAY BOULEVARD * COPPELL,TEJ(A$ 75019 SIDEWALK PAVEMENT REPAII~ First Year Extension of Bid gQ 0101-03 FY 2001/02 SECTION IV 125. 348 Dogwood 126. 116 Bricknell 127. 770 Pelican 128. 124 Meadowglen 129. 128 Meadowglen 130. 109 Deann BID SHEET Q-0101-03 SIDEWALK FAILURES 20 100 60 80 80 152 TOTAL SQUARE FEET 492 CITY OF COPPELL * PURCHASING DEPARTMENT * 255 PARKWAY BOULEVARD * COPPELL,TEXAS 7~019 SIDEWALK PAVEMENT REPAIRS First Year Extension of Bid #Q 0101-03 FY 2001/02 BID SUMMARY Item Description Approx. Bid Price Quantit~ Per SF Total I Remove and replace 1-12 Sidewalk failures as 1,268 SF $5.20 $ 6,593.60 listed II Remove and replace 13-80 Sidewalk failures as 12,281SF $5.20 $ 63,861.20 listed III Remove and replace 81-124 Sidewalk failures as 7,451 SF $5.20 $ 38,745.20 listed IV Remove and replace 125-130 Sidewalk failures as 492 SF $5.20 $ 2,558.40 I listed I TOTALS I 21,492 SF I $111,758.40 * Note: Ali work must be completed by September 30, 2002. Communications concerning ttfis Bid shall be addressed to the address of BIDDER indicated on the applicable signature page. BIDDER understands that the Owner is exempt from State Limited Sales and Use Tax on tangible personal property to be incorporated into the project. Said taxes are not included in the Contract Price (see Instructions to Bidders). The terms used in tttis Bid which are defined in the General Conditions of the Construction Contract included as part of the Contract Documents have the meanings assigned to them in the General Conditions. The City of Coppell reserves the right to delete any portion of this project or adjust quantities as it may deem necessary to stay within the City's available fimds. Should the City elect to delete any portion, the contract quantities will be adjusted accordingly. CITY OF COPPELL * PURCHASING DEPARTMENT * 255 PARKWAY BOULEVARD * COPPELL, TEXAS 75019 T H E - C I Y 0 F COFFELL December 18, 2001 Mr. R.J. Evans, Jr. Quantum Contracting, Inc. P.O. Box 430 2305 Ridge Road Suite 206 Rockwell, TX 75087 Dear Mr. Evans, On March 6, 2001, City Council awarded Bid No. Q-0101-03 for Sidewalk Repair to Quantum Contracting, Inc. for a one year period. The city would like to extend the contract for an additional year. Attached are the current specifications and sidewalk failures. Please sign and return one copy of this letter indicating your acknowledgement of the terms and conditions of the aforementioned Contract and your acceptance of such. If you have any questions and/or concerns, please feel free to cont ~4-ne~ e, fr e.tocon Jim Ragsdill, CPPB ~ fl.J. Evan~ Jr. Vice President Print/Type Name ~ign~e~--'~ M.J. Evens, Jr, Vice President Title Date 255 pARKWAY ~- p 0 BOX 478 ~¢{ COPPELL TX 75019 ~{ ]EL 972/462 0022 ~lr F'AX D72/304 3673