Loading...
ST9401WA-CS 960426MEMORANDUM TO: Mike Martin FROM: UlyS Lane DATE: Apdl 26, 1996 8UBJEC'r: 16" Water line Denton Tap Road; Coppell, Texas WiANO.: 94093 Please review the attached letter for TxDOT. We can acid the casing they want anci move the water line to miss the future pier location. I don't think TxDOT is trying to be cooperative at all. I don't see the need for casing under a right turn lane which is not elevated. I guess the pier location is for a future traffic signal standard. Please advise us whether we should change our plans and request a Change Order form J.C. Evans. Please note that GTE is relocating their facilities in the area. We do not have plans on their facilities. Maybeth Walley told me they would be getting as close as 3' from our proposed alignment. This is close and may be a problem for J.C. Evans when they start working on the north end of the job. You may want to confirm what GTE is planning and get a set of plans. We have been doing a lot of coordination on issues like this with the Water Line design. We are well over budget for this part of the work. I think we will make up for this on the remaining design fees for the roadway project. If this assumption turns out to be wrong, I would like the opportunity at a latter date to request additional services related to some of the work we have done on the Water Line. Hopefully, we want have to have any discussions on this latter on. End of Memo Texas Department of Transportation RO. BOX 3067 * DALLAS, TEXAS 75221-3067 * (214) 320-6100 April 1, 1996 City of Coppell Transfer of facility Ownership Spur 553 From: Denton Tap Rd. To: IH 35E Mr. Ken Griffin, PE City Engineer City of Coppell PO Box 478 Coppell, TX 75019 Dear Mr. Griffin: The permits issued to the City of Lewisville for the placement of any water and sewer lines within the state right of way will transfer with ownership of the facilities in place. The City of Coppell will not be required to obtain new permits or submit any documents for approval by TxDOT. If you have any questions please contact Murray Allen at (214) 320-6648. Your continued cooperation is greatly appreciated. Sincerely, District Pdght of Way Administrator U:\W'P\GE. NUTIL\COPELGEN.LTR An Equal Opportunity Employer .... .~TA 0+29 NSTALL = I-|2 ' PLUG W/ENCASED 6 BLOCKING 7044941.17 2430~45.40 1-12' 22 I/2" BEND W/RETAINER GLANDS L4H2.76 ,0363.54 ,) O0 N-4 42 'X12' TEE · G.V. 8 BOX 'xt2' RElXlCER 4 - I 1 ,,J ZD Z 0 C] T V/~ WIER & ASSOCIATES, INC. ENGINEERING SURVEYING LAND PLANNING 4300 BELTWAY PLACE, SUITE 130 · ARLINGTON TEXAS 7B318-I097 METR0 8171467-7700 · FAX 817/467-7713 Please deliver to the attent/on of.' Name ' · . _ .. ' .... C~mpany . ::' :_! ".'. ".:Area Code/Number . ~/e,,,o~ -,~:~ FROM: ,, d//~ ~, ._ TOTAL NUMBER OF PAGES: --~ (INCLUDING THIS COVER SHEET) DATE: W&A #: IF THIS TRANSMISSION IS INCOMPLETE OR UNREADABLE PLEASE CALL SENDER AS SOON AS POSSIBLE E3 ORIGINAL WILL FOLLOW VIA: E3 Regular Mail [] Hand Delivery [] Overnight [] Other: c:~msdflce~wimvord~AXCVRge. DOC ~:O/IO 'ct gILL Lg~ LIe 'ON X~J [] ORIGINAL WILL NOT FOLLOW ~~ T/z//~L SBLY I OOSS~J ~I M ~ ~~0 ~Hi 96- I ~I&& &9~ &IS 'm ' .~ rF T Mr. Terry L. May, P.E. District Right of Way Administrator Texas Department of Transportation P.O. Box 3067 Dallas, Texas 75221-3067 214-320-6100 March 21, 1996 Re: W&A #94-093; Denton Tap Road; Coppe!!, Texas Dear Mr. May: The city of Coppall has previously requested a permit to install a proposed water line along Denton Tap Road at the future S.H. 121 Bypass location. We received a letter from you dated February 26, 1996 (copy attached) regarding this permit request. Attached are revised construction plans indicating steel casing only for the crossing carrier pipe. You also requested we verify the location and elevation of the existing 12" line located along the east side of Demon Tap Road. The city of Coppell was not successful in obtaining permission from the city of Lewisville and the property owner to acquire this line. Consequently the future water line loop will not include preserving this line crossing the S.H. 121 Bypass. The existing 12" water line is currently connected to the City of Lewisvilte water system. This situation occurred due to a City Limits line dispute which was settled recently by changes in the common boundary between the two cities. Portions of the property where the line is located were established within the City of Coppall. The attached plans indicate extending a 12" water line from the proposed 16" water line south of the Bypass and temporarily plugging the line. This crossing is provided to allow development of the property south of the Bypass and east of Denton Tap Road as a separate system. Another 12' water line crossing off the proposed 16" water line is provided further south which will allow a separate loop back to the proposed 16" water line for the property South of the Bypass. There is a small parcel of land within the City of Coppell located north of the Bypass and east of Denton Tap Road. This property will be served by extending Lr, fh-- f~,+, 'f8 8" StubS> from the proposed 12" line planned along the west side of Denton Tap Road. This will allow abandoning the existing 12" line owned by the City of Lewisville along the east Side of Denton Tap Road within the Bypass Limits. The City of Coppell will install the water system north of the Bypass in the future as the area develops. gO/gO 'of S~LL L917 L~B 'ON XMJ SBi~JIOOSS~J 'B ~t-:iIM 14~J 98:80 ~r I' '1t 96- Tl' The above explanation is provided to cdhfirm that the existing 12" waterline crossing within the Bypass can be abandoned as was originally planned by TxDOT. Please process the water line crossing permit so the City may authorize construction to begin on this project. Ptea~e call me if you have any additional questions. Very truly yours, ULYS LANE I!1, P.E., R.P.L.S. Attachments C: SO/SO 'ct 'B' SILL Lg~ LIB 'ON X~ SB£~IOOSS~ ~ ~3IN 'r ~, '1 817 ~67 7713 HAR-05-96 TUE 02:57 PH WIERySSOOIATES 817167 7713 P. 01/02 T 44-o wA WIER & ASSOCIATES, INC. 4300 BELTWAY PLACE, SUITE 130 · AFILiNGTDN TEXAS METRC3 SlTI41ii7-770Q * FAX Sl?/4B/-7713 FAX COVER SHEET FROM: .......P/Y//_. / ~.. ~e-4~/M/~ DATE: ~ - 5 .-_9~, TOTAL NUMBER OF PAGES, (INCLUDING THIS COVER SHEET) TIME:,.. IF THIS TRANSMISSION IS INCOMPLETE OR UNREADABLE PLEASE CALL SENDER AS SOON AS POSSIBLE ,I~ORIGINAL WILL NOT FOLLOW ORIGINAL WILL FOLLOW VIA: 13 Regular Mail 13 Overnight [] Hand Delivery [] Other:. T Texas Department of Transportation RO. BOX 3067 * DALLAS, TEXAS 75221-3067 · (214) 320-6100 March 4, 1996 Denton County ROW CSJ 3547-03-002 & 003 Account # 8018-1-88 S.H. 121 BP: From S.H. 121 @ Denton Creek To Denton Tap Road City of Coppell Mr. Mike Martin P.O. Box 478 Coppell, Texas 75019 Dear Mr. Martin: We have received your utility permit request for the 12" water line crossing of the proposed S.H. 121 Bypass at'Denton Tap Rd. There appears to be no problem with your alignment, however, we will not approve concrete encasement. There is the possibility of a problem on the east side of Denton Tap Rd. where you propose to tie into an existing 12" water line. TxDOT was under the assumption that the City of Lewisville was going to remove this line. Therefore, during our preliminary design stages this water line was not considered a factor. Since you have apparently made an agreement with the City of Lewisville to put this line back in use, TxDOT is requesting a profile of the line so we may determine if there are any conflicts with our design. If there are no conflicts, the sections under the pavement must be encased, but please be aware for your own benefit, the future installation of the 121 bridge at this point. It is evident that this existing 12" line will come in conflict with our construction in the future. Please revise your plans accordingly and submit at the earliest date possible. If you have any questions or require additional information, please contact Darla Williams at (214)320-6670. Your continued cooperation is greatly appreciated. for: DJW/Attachments cc: Wier & Associates, Inc. C/O Ulys Lane w/Attachments cr673plstd.ltr An Equal Opportunity Employer MEMORANDUM TO: FROM: DATE: SUBJECT: W&A NO,: Ms. Dada Williams; TxDOT Ulys Lane February 27, 1996 g8 FEB 1996 ENGINEERING 12" Water line in Denton Tap Road; Coppell, Texas 94093 You contacted our firm yesterday advising that review of the request for a utility permit for the proposed watedine crossing proposed S.H. 121 Bypass, would require confirming the elevation of the existing 12" water line at the point of connection-. I believe you are asking for the elevation of the existing 12' water line along the east side of Denton Tap Road which will be connected to south of the 121 Bypass. I am not sure I understand specifically what you are requesting and why you need this information since it does not relate to the proposed water line crossing along the west side of Denton Tap Road which is the subject of the water line permit request. We obtained a plan sheet from the construction plans for the existing 12" water line while preforming research for design of the water line project. Copies of portions of this plan are attached. The plans were prepared in 1986 by Dannenbaum Engineering Corp. for Denton County Road Utility Distdct No. 1. The plans indicate construction to be completed by As-Built plans being issued on August 2, 1988. The plans indicate the water line to be laid with a minimum 4' of cover. The plans indicate a 24" RCP casing on the 12" water line within the 121 Bypass between frontage roads. The casing was added as a Change Order on August 14, 1987 probably due to a review by TxDOT. We do not believe there was a profile for the 12" line. We obtained this plan from the Dallas office of Carter & Burgess which acquired the Dallas office of Dannenbaum several years ago. T'o confirm the existing water line elevation would require uncovering the line at this time. The line we believe is currently owned by the City of Lewisville. If you believe the City of Coppell must uncover the line in order to obtain the water line permit for the water line crossing planned on the opposite side of the road, please advise us in writing. I will forward your request to the City of Coppell. End of memo Copy to: Mike Martin DENTON TAP RD. ,._- .T-'--t-T ._ T.-- ..... : ' ' ...... "' T'WR. STA.I06+ 45.02 LINE'A' ""' " 'l.C. 'r'AV. STA.12-4-80.0 -SPINE RD.(r.O LT.) MH. A21 SAN. SWR. STA. I01 + 68.48 LINE 'A' 12"X 8"TEE 8" G.V. 8" W. L. SERVICE ~ PAY. STA. T.C. PAV. STA. 17+ 57.79 -SPINE RD. (7.0' LT. )' · k ~ A P I04 ~REMOVE 12" S.S. LINE BACKFILL TO GRADE ' _ ~PAV. STA. 10+9 z - 12"'W.L. ,,':- '" 12 t 3 I '~ ~/' · ' ~ FH. ASSEMBLY ! -r.c. PAy. STA. a+5oRT. ! SPINE RD. RT. T.C. PAV. STA. I * O (10.0' RT.) . 3EMBW MH. A-6A-I ( 5' := SAN. SWR. STA. 9 " T.C. PAV. STA. 29 MH. AITA (~'6T~ T.C. PAV. STA. 13+00 (IO.O'RT) , 1/2° BEND PAV. STA. 53+1650 (55.0'RT.} A 24" I.D. ROM SPINE ROD T5 ' SPINE ROAD RT. ' SAN. SWR. STA. 52+28.10 'I MH. A- 5,J ,, 12" G.V. · 12" PLUG PAV. STA. 51 +88 (55.0' RT. ) DENTON TAP ROAD i0"'~ 8~'~9 W .: SPIN T.C. P~ SPINE SEE NC 470 NOTES: ALL WATER LINES TO BE INSTALLED WITH 4' MINIMUM COVER UNDER PROPOSED FINISHED GRADE UNLESS SHOWN OTHERWISE. , 8" SANITARY LINE SERVICES SHALL BE EXTENDED TO ROW AT 0.35% SLOPE AND TERMINATE WITH PLUG, UNLESS OTHER- WISE SHOWN. 3. WHERE A WATER LINE AND A SANITARY SEWER LINE CROSS WITHIN 6 FEET, A JOINT OF WATER LINE SHALL BE APPROX- IMATELY CENTERED OVER THE SANITARY · .L-U..,INE'_ ..... -----_..------_ ~ >"~ WATER AND SAJIITAJ~Y SEWER'~ERVICE CONNECTIONS CROSSING SPINE ROAD SHALL DO SO AT 90 ANGLES TO THE MA|N FROM WHICH THEY BRANCH. IN THE CASE WHERE WATER AND SANITARY SEWER CROSS 10 FEET FROM EACH OTHER, .; WATER SHALL BE INSTALLED TO PARALLEL 5. ALL ECENTRIC MANHOLE CONES ARE TO BE ANGLED TOWARD CURB SO THAT I~AN- HOLE LID FALLS OUTSIDE OF SIDEWALK. B, ENCASE WITH 16"I.D.'R.C.P FROM SPINE LT I12.0' LT) 9. I 4' FROM SPINE LT (12'.0' t~T'TO SPINE RT (5.0'RT). 6. SEE DETAIL SHEET FOR FIRE HYDRANT ASSEMBLY DETAIL. WHERE SANITARY SEWER SERVICE CONNECTIONS CROSS BENEATH A STORM SEWER LINE BY A VERTICAL DISTAlICE OF LESS THAN 4 FEET, THE S/U~ITARY SEWER SHALL BE CONCRETE CAPPED 5 ' FEET ON EITHER SIDE OF THE STOR~ SEWER LINE. 8 - 2 - 88 AS - BUILT 8 - 14 - 87 C.O, NO. 4 7-10-87 C.O. NO. 4 I- 8 -87 C.O. NO. 3 4- 25-86 C.O. NO. I DATE DANN ENBAU M""':'' ' WATER AND SEWE T ," T SHEETS C.D.S. D. I~S. J .R D, C. D. S BRIDGES BRIDGES ':¥'~'~c~'~: ;' ~ R. L -C. J.H.L. D.R. S ":~:i;~'~'~:~'~' WALLS LINDHER DEATON ' ' '-:~" '-~'I/fE.-~h~l~" BOYD .;.- BRIDGES D EATON REVISION ;~IIIIF'~E:'/iilCI(DL J APPD. '2. 3HUWN U~HLKWi~L. WISE SHOWN. 3. WHERE A WATER LINE AND A SANITARY SEWER LINE CROSS WITHIN 6 FEET, A JOINT OF WATER LINE SHALL BE APPROX- IMATELY CENlERED OVER THE SANITARY LINE WATER AND SANITARY SEWER SERVICE CONNECTIONS CROSSING SPINE ROAD SHALL DO SO AT 90° ANGLES TO Tile MAIN FROM WHICH THEY BRANCH. [N THE CASE WHERE WAIER AND SANITARY SEWER CROSS 10 FEET FROM EACH OTHER, WAlER SHALL BE INSTALLED TO PARALLEL k S~J~[TARY SEWER. _....-_~,' ..~-- s. ALL (a~.TRIE'~N.OLE CONES A.E TO BE ANGLED TOWARD CURB SO THAT MAN- HOLE LID FALLS OUTSIDE OF SIDEWALK. 6. SEE DETAIL SHEET FOR FIRE HYDRANT ASSEMBLY DETAIL. WHERE SANITARY SEWER SERVICE CONNECTIONS CROSS BENEATH A STORM SEWER LINE BY A VERTICAL DISTANCE OF LESS THAN 4 FEET, THE SANITARY SEWER SHALL BE CONCRETE CAPPED 5 FEET ON EITHER SIDE OF THE STORM SEWER LINE. FROM SPINE l--T---r,,~-'k.O' ill TO SPINE RT (5. -14-87~C0. NO 4 z-,o-~i C.O. No. ~ I- e-87J C.O. NO. S DATE j REVISION DANNENBAUM CORPORATION J C.D.S. J D.R.S. j J .R D. C.D.S BRIDGES BF~I'b~' R. L .C. J.H.L. D.R.S WALLS LINDNER DEATON BOYD BRIDGES D EATON I MAOEI CKD. I APPD. ENGINEERING DALLAS TEXAS WATER AND SEWER LAYOUT SHEETS DENTON COUNTY ROAD UTILITY DISTRICT NO. I DESIGN LINDNER CITY OF LEWISVILLE, TEXAS ' I DRAWN CKD. SCALE DATE RLE NO. HARRISON BRIDGES I" = 200' JAN.,'86 OI- 0426 U"'3 SHEET 86 OF 106 Texas Department of Transportation ~.o. ~o× ~o,~-~,~, ~ ~-~o~. <~,~ ~o-~oo .>,--/c/+-e / ~/'/- February 26, 1996 Denton County ROW CSJ 3547-03-001 Account # 8018-1-88 S.H. 121 BP: From S.H. 121 @ Denton Creek To Denton Tap Road ]996 ASSOC!A'~;E'S Wier & Associates, Inc. Mr. Ulys Lane, III, P.E., R.P.L.S. 4300 Beltway Place, Ste. 130 Arlington, Texas 76018-1097 Dear Mr. Lane: It is necessary that we receive a profile of the existing 12" water main on the east side of Denton Tap Road for us to approve the permit recently submitted by the City of Coppell. Also, as noted earlier, the encasement shall consist of a steel pipe around and outside the carrier pipe and support the load of the ground above the pipe, the highway, and the superimposed loads thereon, including construction equipment. TxDOT will not approve an encasement consisting of concrete material. Please revise your plans accordingly and submit at the earliest date possible.' If you have any questions or require additional information, please contact Darla Williams at (214)320-6670. Your continued cooperation is greatly appreciated. Attachments DJW ~6T'~pbui.ltr An Equal Opportunity Employer Noti e of Proposed Installation Utility Line on Controlled Access Highway Form 1082 (Rev. 9-93) (Previous version(s) are obsolete.) To the Texas Transportation Commission cJo District Engineer Texas Department of Transportation Dallas , Texas Date 12/28/95 Formal notice is hereby given that the City of Coppel 1 Company proposes to place a 12" Water Line line within the right-of-way of S.H. 121 Bypass in Texas as follows: (give location, length, general design, etc.) Dallas At the Denton Tap Road crossing of S.H. 121 Bypass along the future west free turn lane approximately 600 linear feet of 12" Class 150 DR-18 pipe. Refer to Sheets 9 and 10 of the Construction Plans attached. County, The line will be constructed and maintained on the highway right-of-way as shown on the attached drawing and in accordance with the rules, regulations and policies of the Texas Department of Transportation (TxDOT), and all governing laws, including but not limited to the "Federal Clean Water Act," the "Federal Endangered Species Act," and the "Federal Historic Preservation Act." Upon request by TxDOT, proof of compliance with all governing laws, rules, and regulations will be submitted to TxDOT before commencement of construction. Our firm will use Best Management Practices to minimize erosion and sedimentation resulting from the proposed installation, and we will revegetate the project area as indicated under "Revegetation Special Provisions." Our firm will insure that traffic cohtrol measures complying with applicable portions of the Texas Manual of Uniform Traffic Control Devices will be installed and maintained for the duration of this installation. The location and description of the proposed line and appurtenances is more fully shown by sets of drawings attached to this notice. four complete Construction of this line will begin on or after the 1 s t day of February ,19 96 By signing below, I certify that I am authorized to represent the Firm listed below, and that the Firm agrees to the conditions/provisions included in this permit. Firm City of Coppell By(Print) ~+~ ~. ~;~S;n~.~- Signat~e Title City Enqineer Address P.O. Box 478 Coppell, TX 7501 9 Phone No. 214/304-3679 V//kWIER & ASSOCIATES, INC. MR. HUBSAM AVAD TEIA8 DEPARTMENT OF TRANSPORTATION 12i)00 N. OREENVILLE AVE. DALLA8, TX. 75243-3505 4300 BELTWAY PLACE. SUITE *130 3908 SOUTH FREEWAY ARLINGTON, TEXAS '76018 FORT WORTH. TEXAS '761 I0 VI/akWIER & ASSOCIATES, INC. MS. DARLA WILLIAM8 UTH,II]E8 SECTION. ROW DIVISION DISTRICT 18. TXDOT P.O. BOX 3067 DALLAS. TX. 75201-3067