Loading...
PA9702-LR 991203REPORT OF STRUCT QL L STEEL INSPECTiq N ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 DateofService: 11/24/1999 Report No.: 9931505 Report Date 12/03/1999 Client No.: COPPELL ProjectNo.: 94991118 Client: City of Co pell Project: Coppell Aquatic/Recreation Ctr Attn: Bra~rReid 732 DeForest 300 Block of Parkway Blvd Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: Structural steel inspection. On this date, an HBC Engineering representative arrived at the above referenced jobsite as scheduled for structural steel inspection. A visual inspection was conducted on Unit A, Low Roof as noted below. 1. Visual inspection of joist bearing and joist welds revealed compliance. 2. Bolt tensioning was not complete. 3. One beam was welded in lieu of bolting. Technician: Clyde Fellers ~ ~'~ring, Inc. Report Distribution: ( 1 ) City of Coppell ( 1 ) City of Coppell - Engineering ( I ) BrinkIcy Sargent Architects (1) City of Coppeg - Bldg. lnsp. Paul D. Smith, P.E. (1) Turner Engineers (1) City of Coppell - Leisure Serv Dept Senior Project Engineer (1) Hisaw & Associates This reporl is exclusively f~lr tile use of the client indicalcd above and shall not be reproduced except in full wilhout the written approval of HBC Engineering, Inc. 9951}S Paste 1 of 1