Point West Addition-PT 260921$8090.27 9/16/2026
Dan Gallagher 972-770-1300
Rev. 12-2023
Review and Inspection Fee Calculation Sheet
Project Name: Date:
Per the City of Coppell Subdivision Regulations, the Developer shall pay review and inspection fees for the items to be
reviewed and inspected by the Engineering Department. Review fees are charged at $150/hr with a 4-hour minimum
based on the rates below. Inspection fees are charged at $120/hr with a 4-hour minimum based on the rates below.
Review fees are due upon permit submittal. Inspection fees are due before the date of the Pre-construction Meeting.
Quantity Review Fee
Rate
Calculated
Review Fee
Inspection
Fee Rate
Calculated
Inspection Fee
Paving Improvements SF
Drainage Improvements LF
Utility Improvements LF
Sidewalk Improvements SF
Grading Improvements SF
Utility Taps Per Table
Below Per Table
Below
Public Infrastructure Not
Listed (hours estimated
at time of submittal)
Review:
Inspection:
Total:
Water Service and Tap Quantity Review
Fee Rate
Calculated
Review Fee
Inspection
Fee Rate
Calculated
Inspection Fee
- Up to 2 Inches
- 3 to 6 Inches
- 8 Inches and Larger
Sewer Service and Tap
Additional reviews after 3 reviews ( of original review fee): _____________
Major plan revision ( of original review fee): _____________
Additional final walkthrough inspection (4 hours): $480.00
hr
hr
Naterra Coppell 6/18/2026
$0.03/SF $9,797.31 $0.12/SF $39,189.24
$1.50/LF $6,435.00 $1.20/LF $5,148.00
$0.75/LF $3,878.25 $1.20/LF $6,205.20
$0.075/SF $2,070.00 $0.48/SF $13,248.00
$0.002/SF $2,022.57 $0.006/SF $6,067.70
$2,100.00 $3,360.00
$150/hr $0.00 $120/hr $0.00
$26,303.13 $73,218.14
2 $300 $600.00 $480 $960.00
$450 $0.00 $720 $0.00
2 $600 $1,200.00 $960 $1,920.00
1 $300 $300.00 $480 $480.00
$5,260.63
$13,151.56
326,577
4,290
5,171
27,600
1,011,283
20%
50%
Naterra Coppell Early Grading