Loading...
Point West Addition-PT 260921$8090.27 9/16/2026 Dan Gallagher 972-770-1300 Rev. 12-2023 Review and Inspection Fee Calculation Sheet Project Name: Date: Per the City of Coppell Subdivision Regulations, the Developer shall pay review and inspection fees for the items to be reviewed and inspected by the Engineering Department. Review fees are charged at $150/hr with a 4-hour minimum based on the rates below. Inspection fees are charged at $120/hr with a 4-hour minimum based on the rates below. Review fees are due upon permit submittal. Inspection fees are due before the date of the Pre-construction Meeting. Quantity Review Fee Rate Calculated Review Fee Inspection Fee Rate Calculated Inspection Fee Paving Improvements SF Drainage Improvements LF Utility Improvements LF Sidewalk Improvements SF Grading Improvements SF Utility Taps Per Table Below Per Table Below Public Infrastructure Not Listed (hours estimated at time of submittal) Review: Inspection: Total: Water Service and Tap Quantity Review Fee Rate Calculated Review Fee Inspection Fee Rate Calculated Inspection Fee - Up to 2 Inches - 3 to 6 Inches - 8 Inches and Larger Sewer Service and Tap Additional reviews after 3 reviews ( of original review fee): _____________ Major plan revision ( of original review fee): _____________ Additional final walkthrough inspection (4 hours): $480.00 hr hr Naterra Coppell 6/18/2026 $0.03/SF $9,797.31 $0.12/SF $39,189.24 $1.50/LF $6,435.00 $1.20/LF $5,148.00 $0.75/LF $3,878.25 $1.20/LF $6,205.20 $0.075/SF $2,070.00 $0.48/SF $13,248.00 $0.002/SF $2,022.57 $0.006/SF $6,067.70 $2,100.00 $3,360.00 $150/hr $0.00 $120/hr $0.00 $26,303.13 $73,218.14 2 $300 $600.00 $480 $960.00 $450 $0.00 $720 $0.00 2 $600 $1,200.00 $960 $1,920.00 1 $300 $300.00 $480 $480.00 $5,260.63 $13,151.56 326,577 4,290 5,171 27,600 1,011,283 20% 50% Naterra Coppell Early Grading