Magnolia Park-CS260925 (2)Scott Latta
From:Sammy Lujan
Sent:Friday, September 25, 2026 10:33 AM
To:Scott Latta; John Rebman; Kirk Smith
Subject:RE: Magnolia Park HOA - Dredging, Request for Construction Development Permit (No Fee) Sketch and estimated durations
Good morning. We are okay with the closure and the start date.
Sammy Lujan
Deputy Chief of Police
Coppell Police Department
972-304-3589
From: Scott Latta <WLatta@coppelltx.gov>
Sent: Friday, September 25, 2026 9:56 AM
To: John Rebman <JRebman@coppelltx.gov>; Kirk Smith <KSmith@coppelltx.gov>; Sammy Lujan <SLujan@coppelltx.gov>
Subject: RE: Magnolia Park HOA - Dredging, Request for Construction Development Permit (No Fee) Sketch and estimated durations
Good morning,
Just following up on this, the contactor is wanting to begin dredging on Oct 5th.
Thanks,
Scott Latta
Engineering Technician
City of Coppell, TX
972-304-3683 (office)
www.coppelltx.gov
From: Scott Latta
Sent: Tuesday, September 22, 2026 4:32 PM
To: John Rebman <JRebman@coppelltx.gov>; Kirk Smith <KSmith@coppelltx.gov>; Sammy Lujan <SLujan@coppelltx.gov>
Subject: FW: Magnolia Park HOA - Dredging, Request for Construction Development Permit (No Fee) Sketch and estimated durations
Hello Gentlemen,
I thought I should run this Waverly lane closure by you again, as the duration of the closure has changed from around 2 month
much as 6 months.
Turns out the silt dewatering tubes need to stay in the street until they are dry enough to be removed, which could take mont
Let me know if you have any questions.
Thanks,
Scott Latta
Engineering Technician
City of Coppell, TX
972-304-3683 (office)
www.coppelltx.gov
Once geotubes are placed and material pumped into, geotubes cannot be moved until material is dry and material is excavated o
loaded into dump trucks.
Geotubes are custom ordered and made to size. 60' circumference is typical and 50', 100' (up to 200') long. We will be utiliz
area of the road closure until geotubes are hauled offsite. Will not block drainage to curb inlets.
Hope this helps.
Brian Rodel, PE
Bullock Construction
(936) 827-6016
From: Scott Latta <WLatta@coppelltx.gov>
Sent: Tuesday, September 22, 2026 11:36 AM
To: brian@bullockconstruction.com <brian@bullockconstruction.com>; Aaron Tainter <aaron.tainter@coppelltx.gov>
Cc: Ragu Rao <r4rags@gmail.com>; Jack Leathers <magnoliaparkvp@gmail.com>; Mark Bullock <mark@bullockconstruction.com
<steven@bullockconstruction.com>
Subject: RE: Magnolia Park HOA - Dredging, Request for Construction Development Permit (No Fee) Sketch and estimated durations
Hi Brian,
Thank you for the site exhibit and work description. We have just a few requests/questions before approvals can be granted.
1. Could the anticipated duration of the street closure in the exhibit text be more clearly defined? It looks like the duration
10/5/2026 + 8 weeks, but an anticipated end date for the closure would be helpful.
2. Please submit an updated ROW Use permit application with the estimated road closure start and completion dates revised to
match the duration defined in the revised exhibit. A fillable ROW Use permit application is attached for your use.
3. Verify that the Geotubes will be stored outside of the roadway during the drying cycle.
Thanks,
Scott Latta
Engineering Technician
City of Coppell, TX
972-304-3683 (office)
www.coppelltx.gov
From: brian@bullockconstruction.com <brian@bullockconstruction.com>
Sent: Tuesday, September 22, 2026 11:04 AM
To: Aaron Tainter <aaron.tainter@coppelltx.gov>
Cc: Scott Latta <WLatta@coppelltx.gov>; Ragu Rao <r4rags@gmail.com>; Jack Leathers <magnoliaparkvp@gmail.com>; Mark Bullock
<mark@bullockconstruction.com>; Steven Bullock <steven@bullockconstruction.com>
Subject: Magnolia Park HOA - Dredging, Request for Construction Development Permit (No Fee) Sketch and estimated durations
Good Morning Aaron,
Please find the attached diagram with an estimated duration per your request for the 'no fee' construction development permit
Let me know that you received.
Also, would like to confirm that the City of Coppell is good for approvals for Bullock Construction to start scheduling the m
CAUTION: This email originated from an external source. Avoid clicking on links, opening attachments, or replying unless you are
familiar with the sender's email address and can confirm the content is secure. Ensure that you do not enter your credentials
authentication page that does not belong to our organization.