Loading...
ST0001-LR011220Ro gineers Client: City of Coppell Arm: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75109 Project: Services: Creekview Drive and Freeport Parkway Coppell, TX Perform In-Place Density Test in accordance with ASTM Standards. 8908 Ambassador Row Dallas, Texas 752474510 (214) 630-9745 (214) 63o-9010 (fax) IN-PLACE DENSITY TESTING Report No.: 139829 Project No.: 015729 Date of Service: 12/07/2001 Report Date: 12/20/2001 PROJECT DATA CONTRACTOR: Test Methods: M/D No. Infrastructure Services, Inc. ASTM D-2922 ASTM D-3017 Description Gauge: Troxler 3430 Moisture Gauge Serial No: 32685 Current: 570 Test Mode: DT Previous: 638 MOISTURE DENSITY RELATIONS Dark Brown Clay, trace calcareous nodules Moisture % Density pcf 18.0 Standard Counts Density Current: 3035 Previous: 3009 Project Requirements Moisture Density 105.0 Optimum +5 95 min FIELD DENSITY TESTS TEST PROBE NO TEST LOCATION DEPTH Road Fill Creekview, fight of centerline, Station 3+00, 5th lift Road Fill Creekview, fight of centerline, Station M/D MOISTURE WET DENSlTY DRY DENSITY No. (%) (pc0 (pc0 2 Tests approved by City Inspector, Larry Davis. 6" 1 23.6* 129.9 105.1 6" 1 22.4 127.4 104.1 3+00, 6th lift An asterisk (*) appears next to test results which do NOT meet the project specifications. Started: 9:00am Finished: 1 l:00a R°ne~/7 (1) City of Coppell (1) Schrickel, Rollins & Assoc., Inc. Project Technician: Joe Jemigan Report Distribution: (i) City of Coppell (1) City of Coppell (1) City of Coppell (1) infrast~ctum Services, Inc. DENSITY (% max) 100 9 'k LIMITATIONS: The test results presented herein were ~ed based upon the specific samples pro i ed for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature o f similar subject matter provided by persons or conditions over which we have no contxol. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 07DK Page 1 of 1 RoneEngineers Client: City of Coppell ARa: Ms. Susan Ta~ering Dept PO Box 478_~'''~ ~ Se~en is ty Test in accordance with ^STM Standards. PROJECT DATA 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) IN-PLACE DENSITY TESTING Report No.: 139663 Project No.: 015729 Date of Service: 12/06/2001 Report Date: 12/20/2001 CONTRACTOR: Infrastructure Services, Inc. Test Methods: ASTM ~-2922 ASTM D-3017 M/DNo. De~ripfion Gauge: Troxler 3430 Moisture Gauge Serial No: 32685 Current: 638 Test Mode: DT Previous: 643 MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf 1 Dark Brown Clay, trace calcareous nodules Standard Counts Density Current: 3009 Previous: 3017 Project Requirements Moisture Density 18.0 105.0 Optimum +5 95 min FIELD DENSITY TESTS TEST PROBE NO TEST LOCATION DEPTH MID MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pro (lOCi) (% max) Started: 4:30pm Finished: 6:00pm (1) City of Coppell (1) Scini=kel, Rollins &Assoc., Inc. Technician: Joe Jemigan Report Distribution: (1) City of Coppell (1) City of Coppell (1) Infiastmcturc Services, Inc. .f Paving Subgrade 1 Creekview Drive, leR of centerline, 1st lift 6" 1 20.9 127.7 105.6 101 Paving Subgrade 2 Creekview Drive, left of centerline, 2nd lift 6" 1 23.3* 127.2 103.2 9198 Paving Subgrade 3 Creekview Drive, left of centerline, 3rd lift 6" I 21.1 121.2 100.1 95 Paving Subgrade 4 Creekview Drive, left of centerline, 4th lift 6" 1 20.4 123.9 102.9 An asterisk (*) appears next to test results which do NOT meet the project specifications. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in fifll without the written approval of Rone Engineers, Inc. 07DK Page 1 of 1 .oneEn g Client: City of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75109 Project: Services: Creekview Drive and Freeport Parkway Coppell, TX Pa'form In=Place Density Test in accordance with ASTM Standards. 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 63O-9745 (214) 630=9819 (fax) IN-PLACE DENSITY TESTING Report No.: 139733 Project No.: 015729 Date of Service: 12/07/2001 Report Date: 12/20/2001 PROJECT DATA CONTRACTOR: Infrasa'ucturc Services, Inc. Test Methods: ASTM D-2922 ASTM D-3017 Gauge: Troxler 3430 Gauge Serial No: 32685 Te~t Mode: DT Moisture Current: 570 Previous: 638 MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf Standard Counts Density Current: 3035 Previous: 3009 Project Requirements Moisture Density 1 Dark Brown Clay, trace calcareous nodules 18.0 105.0 Optimum +5 95 rain FIELD DENSITY TESTS TEST NO TEST LOCATION Road Fill Creekview Drive, Station 3+00 at centerline, 7th lift Road Fill Technician: Joe Jemigan Report Distribution: (1) City of Coppell (1) City of Copp¢ll (I) City of Coppell (1) Infrastructure Services, he, PROBE MID MOISTURE WET DENSITY DRY DENSITY DENSITY DEPTH No. (%) (pcO (pcO (% max) 6" 1 21.1 126.1 104.1 9/99 106.8 2 Creekview Drive, Station 3+00 at 6" 1 23.5* 131.9 centerline, 8th lift An asterisk (*) appears next to test results which do NOT meet the project specifications. Tests approved per City Inspector, Larry Davis. Started: 3:00pm Finished: 4:30pm (I) City of Coppell (1) Schrickcl, Rollins & Assoc., Inc. k~' ~ , Stark P~ ect Manager LIMITATIONS: Thc test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports arc for the exclusive use of the clients to whom they arc addressed and shall not be reproduced except in fi~ll without thc written approval of Rone Engineers, Inc. 07DK Page I of I