Loading...
PA9702-LR 991123REPORT OF STRUCTCRAL STEEL INSPECTI 'q Date of Service: 11/12/1999 Report No.: 9930503 Report Date 11/23/1999 Client No.: COPPELL Project No.: 94991118 Client: CityofCoppell Project: CoppellAquatic/RecreationCtr Attn: Brad Reid 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: Structural steel inspection, On this date, an HBC Engineering representative arrived at the above referenced jobsite as scheduled for structural steel inspection. A visual inspection was conducted on the Gymnasium Roof Level Framing between lines D to F and 1 to 7.5 as noted below. ,l~ieat bearing and welding was determined to be -Type bridging was determined to be compliant with exception of bottom chord attachment to end walls, 3. Welder qualif' tions rev~iewed o~the steel erector were determined t be compliant. Technician: Randy Walcker ~ ~'~ring, Inc. Report Distribution: ( I ) City ot'Coppell ( I ) City ofCoppcll - Engineering ( I ) BrinkIcy Sargent Architects (1) City of Coppet l - Bldg. Insp. Paul D. Smith, P.E. ( ! ) Tin~er Engineers (I) City of Coppell - Leisure Serv Dept Senior Project Engineer ~1 } Hisaw & Associates 1'his report Is exclusively lbl the use of the ctient indicated ab¢lx e and shall not be Icp~'oduced except in full without the writtell approval of HBC Engineering, lnc, 99SI)J Page I of I