Loading...
ST9401WA-CS 951220 (2)T GTE Telephone Operations Central Area December 20, 1995 Wier & Associates, Inc. 4300 Beltway Place, Suite 130 Arlington, Texas 76018-1097 Attn: Mr. Ulys Lane Re: Denton Tap Road Coppell, Texas W&A #94-093 Dear Mr. Lane: I have reviewed the water line plans for the project listed above in regard to its impact on the GTE bridge attachment. Although it would be possible to adjust the bends in our conduits at the bridge ends in order to avoid the abutment extensions, we believe it would be better to place new ducts in approximately the alignment you marked on Sheet 1 of 1, Proposed Bridge Layout, under the creek. This is primarily because it appears the reroute would be a more permanent solution. We are currently engineering plans to do this work, but due to the permits to be obtained, the difficulty of the proposed bore and the sensitivity of the interoffice fiber cable which runs through this route, I believe our earliest possible date to be clear of the City's proposed work will be on or about May 1, 1996. This is also contingent on having access to the area shown as future right-of-way on both sides of the bridge no later than mid-February. Please let me know when the City will have this right-of-way acquired. If I can answer any questions on this, please contact me at (214) 318-3832. Sincerely, Mae Beth Whalbey Engineer, O.S. P. cc: Ken Griffin A part of GTE Corporation