Loading...
PA9702-LR 991202CONCRETE COMPRE/7'3IVE STRENGTH TEST' 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 11/03/1999 Report No.: 9929637 Report Date 12/02/1999 Client No.: COPPELL ProjectNo.: 94991118 Client: City of Co pell Project: Coppell Aquatic/Recreation Ctr Attn: Bra~PReid 732 DeForest 300 Block of Parkway BIrd Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressire strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: N/A CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 11/03/1999 BATCH TIME: 7:50am PLANT: Lewisville TllVIESAMPLED: 8:23am BY: Joey Gordon SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear, cool STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 39 P CONCRETE: 52 F SLUMP: 5.0" Max TRUCK NO: 211 TICKET NO: 79555 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Swimming pool/peanut pool center column 30 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE 1 1 6.00 11/10/1999 7 68190 2410 1 2 6.00 11/10/1999 7 72370 2560 Average 2490 1 3 6.00 12/01/1999 28 104700 3700 1 4 6.00 12/01/1999 28 104030 3680 Average 3690 Sample location: 10 Feet west of far west side pool and 17 feet north of southside of pool This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01IA. Page I of 2 CONCRETE COMPRE"";IVE STRENGTH TES 8901 Carpenter Frwy., Suite #100 , DaLlas, Texas 75247 Date of Service: 11/03/1999 Report No.: 9929637 Report Date 12/0~/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co pet1 Project: Coppell Aquatic/Recreation Ctr Attn: Bra~PReid 732 DeForest 300 Block of Parkway Blvd Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw &Assoc. CONCRETE CLASS: N/A CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 11/03/1999 BATCH TIME: 8:39am PLANT: Lewisville TFMESAMPLED: 9:03am BY: Joey Gordon SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear, cool STRENOTH: 3000 psi @ 28 Days TEMEERATtYRE (n - Am 47 F CONCRETE: 60 SLUMP: 5.0" Max TRUCK NO: 224 TICKET NO: 79561 AIR: N/A AIR CONTENT (%): N/A U~aT WEIGHT (pet): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCtn~r~A~n~VAP~S: 10 CYLINDER MEASURED MAXIMIYM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lhs. force) (psi) TYPE 2 1 5.00 11/10/1999 7 59610 2110 2 2 5.00 11/10/1999 7 63040 2230 Avenge 2170 2 3 5.00 12/01 / 1999 28 98020 3470 2 4 5.00 12/01/1999 28 101200 3580 Avenge 3530 Sarap3. e l.ocat~_on: 30 Feet west o£ far west sS. de o£ pool and 13' north of seut:hsS. de of pool. Technician: Joey Gordon Started: 7:30am Finished: l l:00am ~ Engi~nc. Report Distribution: (I) City of Coppell (1) City ofCoppell - Engineering (1) BrinkIcy Sargent Architects (1) City ofCoppell - Bldg. Insp. Eugene/eHarbour (I) Turner Engineers (1) City ofCoppcll - Leisure Serv Dept Vice President (1) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 2 of 2