Loading...
PA9702-LR 991112CONCRETE COMPREr SIVE STRENGTH TES 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 11/03/1999 Report No.: 9929637 Report Date 11/12/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co pell Project: Copper1 Aquatic/Recreation Ctr Attn: Bra~Reid 732 DeForest 300 Block of Parkway Blvd Coppell TX 75019 Coppell, Texas/Prj. ~96051 Services: ~btainsamp~es~ffreshc~ncreteatthep1acement1~cati~ns~perf~rmrequired~e~dtestandcast compressire strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 11/03/1999 BATCH TIME: 7:50am PLANT: Lewisvi]le Tll~ESAMPLED: B~23am BY: Joey Gordon SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear, cool STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 39 F CONCRETE: 52 F SLUMP: 5.0" ~/[ax TRUCKNO: 211 TICKET NO: 79555 AIR: N/A AIRCONTENT(%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: AST]V[ C- 143 PLACEMENT LOCATION: Swimming pool/peanut pool center column 30 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMI~RESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACT't]RE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 6.00 11/10/1999 7 68190 2410 1 2 6.00 11/10/1999 7 72370 2560 Average 2490 1 3 6.00 12/01/1999 28 1 4 6.00 12/01/1999 28 S~mp].e loe~tt:~_on: 'i0 Foot wes'c oE E&r ws~t ~.do poo'l ancl 1.7 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 2 CONCRETE COMPRE IVE STRENGTH TESC 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 11/03/1999 Report No.: 9929637 Report Date 11/12/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Coppell Project: Coppell Aquatic/Recreation Ctr Attn: Brad Reid 300 Block of Parkway Blvd 732 DeForest Coppell TX 750 i 9 Coppell, Texas/Prj. #96051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressire strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: N/A CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 11/03/1999 BATCH TErm: 8:39am PLANT: Lewisville TIME SAMpLED: 9:03am EY: Joey Gordon SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear, cool STRENGTH: 3000 psi @ 28 Days TEMpERATURE (F) - AIR 47 F CONCRETE: 60 F SLUM~: 5.0" Max TRUCK NO: 224 TICKET NO: 79561 AIR: N/A AIRCONTENT(%): N/A USITWEIGn'r(Fr~: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMpLE LOCATION: See below REPORT OF TESTS ACCtr~,~AT~V~VAm~S: 10 CYLINDER MFASURED MAXIMUM COMpRESSIVE MAiD $LUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 5.00 11/10/1999 7 59610 2110 2 2 5.00 11/10/1999 7 63040 2230 Average 2170 2 3 5.00 12/01/1999 28 2 4 5.00 12/01/1999 28 Sample location: 30 Feet_ west_ of fax: west~ side of pool and 13' noz'th of sout,.hside of pool Technician: Joey Gordon Started: 7:30am Finished: 1 l:00am H]C E~g, Inc. Report Distrib.ution: (1) City of Coppell (1) City ofCoppell - Engineering ( 1 ) BrinkIcy Sargent Architects ( 1 ) City of Coppell - Bldg. Insp. Eugene Harbour (1) Turner Engineers (1) City ofCoppell - Leisure Serv Dept Vice Presidertt (1) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 2