Loading...
WA0101-CS011219December 19, 2001 WA 01-01 SH 121 Water Line I talked with Gary Hendricks Design Time: · 60 days if we stay with the States' right-of-way · If we go outside of the right-of-way it will extend the time frame - not of the design- but of the time to acquire the easements · He strongly feels that we will have to go outside of the right-of-way because of Co- Serve facilities already located in the right-of-way · He will send two new signature pages