ST9401-CS 990831COPPELL. TEXAS 75019 August 31, 1999 5 T2"/-o,' P,O. Box 478 Coppell. Texas 75019 972-462-0022 Daniel B. Anderson, Vice President Centex Development Company P.O. Box 199000 Dallas, TX 75219-9000 RE: Hooded Left Turn Lane, Denton Tap Road south of SH 121 Bypass Dear Mr. Anderson: As agreed, the common costs for the construction of both north/south hooded left turn lanes on Denton Tap Road is to be shared equally by Beat Mortgage, Inc. and Centex Development Company. Construction of the north/south hooded left turn lanes south of S.H. 121 bypass has been completed and the City of Coppell has made payment for the design and construction of the work. Therefore, this letter will serve as a request for payment of one-half the cost for the design and installation of the turn lanes. The shared costs include: Wier & Assoc., Inc. Rebcon, Inc. Design $1,127.66 Materials/Construction $35,691.00 Total $36,818.66 Please submit a check in the amount of $18,409.33 to the City of Copper and forward to Jennifer Armstrong, Finance Director, along with a copy of this letter. If you should have any questions concermng this issue please feel flee to contact me at your convenience at 972/304-3679. Sincerely, Michael A. Martin, P.E. Asst. City Engineer cc: Jennifer Armstrong, Finance Director file/st9401/centex899 WIER & AS-qOCIATES INC. June 21, 1999 Mr. Ken Griffin City of Coppell P.O. Box 478 Coppell, Texas 75019 Statement No. 4334 RE: W&A~ 94-093 Denton Tapp Road Reconstruction; Coppell, Texas STATEMENT For professional services provided from January 23, 1999 through May 28, 1999: BASIC SERVICES MEDIAN OPENING ADDITION TO PLANS Agreed Fee Not to Exceed $1,000.00 provided by City; · Prepared quantity changes for hooded left tum lanes; · Submitted Plan to City of Coppell. UTL 0.50 hours PLG 9.50 hours Courier Plotting Reproduction Prepared revised Contractor Plans for hooded !eft turn lane at station Subtotal $ 60.00 $ 731.50 $ 33.00 $ 7.26 $ 14.40 $ 846.16 41000 41500 45O0O ADDITIONAL SERVICES · Revise median location to move 5C' as directed by Mike Martin. hours PLG 2.00 $ 154.00 RAC 3.00 hours $ 127.50 TOTAL AMOUNT DUE . Ulys Lane III, P.E., R.P.L.S. 4300 B(iI.TWAy PLACE:. SU,TI: t30 AimlLINQTDN. TIXAac 76018 lulC"rg(3 8171467-77QI3 FAX ML"TIII3 11'71467-7713 ! CITY OF COPP~J- CHANGE OR EXTRA WORK ORDER PROJECT: CONTRACTOR: OWNEP, J Denton Tap Road Projea # ST 94-01 Rebcon Inc. City of coppat CHANGE ORDER NO.: Add: New: Delete: 2 (Double Nonlt/Soutla turn lmu) Item Description 16 6' Lime Stab Subgrade 17 Lime 18 8' Reinf Conc Pvmt 21 Brick Pavers w/Cone Base 28 P15W 4 ' Pvmt Markers 32 3' Sched_~;.te 40 PVC Pipe 3 6' Sch 40 PVC Irrigation 81v 785 8Y 12 TON 719 SY 50 8Y 40 220 LF 10 LF Saw/RemExist. ConcCurb/Gut Butt Joint Earthwork 265 LF 265 LF 1 LS 26 4' Topsoil & Hydromulch 77O Total Revision to Contract Amount Previous contract amount Net increase in contract amount Revised contract amotmt Net increase in contract time of completion Revised Contract time of completion DATE: UnitPrke 5/28/99 Total 1.50 1,177.50 92.00 I, I04.00 30.00 21,570.00 70.00 3,500.00 5.80 232.00 4.00 880.00 5.00 50.00 ZSO 1,98Z50 4.00 1,060.00 4,900.00 4,900.00 1.00 (770.00) $35,691.00 $3,641,347.15 $ 35,691.00 $3,677,038.15 290 Working Days The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract Recommcnd~ b? City Engin~r A~,~Co for Approv at Dat~ /, h/ /~ q August 31, 1999 P.O. Box 478 Coppell. Texas 75019 972-462-0022 Mark Pulliam Beal Mortgage, Inc. 15770 N. Dallas Parkway, Suite 300 Dallas, TX 75248 RE: Hooded Left Turn Lane, Demon Tap Road south of SH 121 Bypass Dear Mr. Pulliam: As agreed, the common costs for the construction of both north/south hooded left turn lanes on Denton Tap Road is to be shared equally by Beal Mortgage, Inc. and Centex Development Company. Construction of the north/south hooded left turn lanes south of S.H. 121 bypass has been completed and the City of Coppell has made payment for the design and construction of the work. Therefore, this letter will serve as a request for payment of one-half the cost for the design and installation of the turn lanes. The shared costs include: Wier & Assoc., Inc. Rebcon, Inc. Design $1,127.66 Materials/Construction $35.691.00 Total $36,818.66 Please submit a check in the amount of $18,409.33 to the City of Copper and forward to Jennifer Armstrong, Finance Director, along with a copy of this letter. If you should have any questions concerning this issue please feel free to contact me at your convenience at 972/304-3679. Sincerely, Michael A. Martin, P.E. Asst. City Engineer cc: Jennifer Armstrong, Finance Director file/sO401Poea1899 /11 WI ER & ASSOCIATES, INC. June 21, 1999 Mr. Ken Griffin City of Coppell P.O. Box 478 Coppell, Texas 75019 Statement No. 4334 RE: W&A~ 94-093 Denton Tapp Road Reconstruction; Coppell, Texas STATEMENT For professional services provided from January 23, 1999 through May 28, 1999: BASIC SERVICES MEDIAN OPENING ADDITION TO PLANS Agreed Fee Not to Exceed $1,000.00 provided by City; Prepared quantity changes for hooded left turn lanes; Submitted Plan to City of Coppell. UTL 0.50 hours PLG 9.50 hours Courier Plotting Reproduction Prepared revised Contractor Plans for hooded left tum lane at station Subtotal $ $ $ $ $ $ 60.00 731.50 33.00 7.26 14.40 846.16 ADDITIONAL SERVICES ° Revise median location to move 50' as directed by Mike Martin. PLG 2.00 hours RAC 3.00 hours Subtotal TOTAL AMOUNT DUE BY JULY 21, 1999 410(X) 415CX3 154.00 127.50 281.50 $ 1~,127.66 / 1.073.00 54,66 4300 BELTWAY PLACE, SUITE 130 Thank you, Ulys Lane III, P.E., R.P.L.S. ARLINGTnN, TEXAS 76018 METRO S17/467-77C30 F~3( METRQ S171467-7713 ,/' ! CITY OF COPP~L CHANGE OR EXTRA WORK ORDER PROjrECT: CONI"P, ACTOR: OW'NER: Denton Tap Road Project # ST 94-01 Rebcon Inc. City of Coppert CHANGE ORDER NO.: 2 (Double North/South turn !atw) Item Description Quantity Add: I. New: Delete: 16 6' Lime Stab Subgrade 17 Lime 18 8' Reinf Conc Pvmt 21 Brick Pavers w/Conc Base 28 P15W 4 ' Pvmt Markers 32 3' Schedule 40 PVC Pipe 3 6" Sch 40 PVC Irrigation Sly 785 12 719 50 40 220 10 Saw /R emExist. ConcCurb /Gut Butt Joint Earthwork 265 265 1 26 4' Topsoil & Hydromulch 77O Unit TON EA LF LF DATE: UnitPrke 5/28/99 Total 1.50 1,177.50 92.00 1,104.00 30.00 21,570.00 70.00 3,500.00 5.80 232.00 4.00 ,880.00 5.00 50.00 ZSO 1,98Z50 4.00 1,060.00 4,900.00 4,900.00 1.00 (770.00) Total Revision to Contract Amount Previous contract amount Net increase in contract amount Revised contract amount Net increase in contract time of completion Revised Contract time of completion $35,691.00 $3,641,347.15 $ 35,691.00 $3,677,038.15 290 Working Days The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and sa#sfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract 7;~City En~gineer A~CO Approved b~ ~ Date /, /// q