Loading...
CF-Coppell Rd SC-LR020117Hooper Engineering Laboratories, Inc. Construction Materials Testing PROJECT: Field Service Offices & Maint. Fac., Coppell LOCATION OF POUR SET 1: Grade beam, line 3 & 5 @ Bldg. 2 LOCATION OF POUR SET 2: JOB NO.: 01.1054 DATE: 17 January 2002 SUPPLIER: Lattimore SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 1106 Cement Ticket No. 3139504 Flyash Time Batched 12:30pm Sand Time Sampled 1:30pm in. Concrete Temp. (ASTM C10641 60°F 1.0 in. Air Content (ASTM C231) Water Unit Weight (ASTM C138) Admix //1 Admix //2 AEA 54 COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Number inches Days Date (ASTM C143) 96 3.75 0~~7 J 1/24/02 97 3.75~02/I 4/02 98 3.75 02/14/02 Total Load Compressive Required Pounds Strength 28-Day psi Strength 106,400 ~ 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: CBC (1:00pm-2:30pm) (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REINFORCING STEEL PLACEMENT INSPECTION CLIENT: Texas Unified Constructors, Inc. DATE: 17 January 2002 PROJECT: Field Service Offices & Maintenance Facility Coppeil, TX JOB NO. 01.1054 TIME: 1.0 hour AREA INSPECTED: Grade beam, Bldg. 2, lines 3, 5 and 6 DATE OF INSPECTION: 1/17/02 (12:00 Noon-1:00pm) DEFICIENCIES NOTED: NUMBER LOCATION/ITEM DESCRIPTION CORRECTIONS OBSERVED None REMARKS: All items reviewed were present and placed according to project plans and specifications, at time of final inspection. TECHNICIAN: DISTRIBUTION: CBC (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148