ST0001-CS011214 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To'- From: Date: RE: Kenneth M. Griff'm, P.E., Dir. of Engineering/Public Works Suzan Taylor, C.I.P. Coordinator December 14, 2001 Creekview Drive & Freeport Parkway ST 00-01 December 13, Site Meeting The biweekly site meeting was held on the above referenced project. Below is a summary of the items discussed with Schrickel Rollins & Associates, Inc., prior to the meeting. Relocation of steel and cable fence: · Contractor submitted a change order in the amount of $16,491 to remove existing fence, and install and paint 800 linear feet of fence. This averages out to be $20.61/L.F. · City Inspector obtained separate contractor price of $10.75/L.F. to install and paint fence. · Change order is not in line with current construction prices. SRA will contact Philip Bennett with isi to discuss the amount of the change order. Proposed sidewalk along Creekview Drive · The proposed sidewalk weaves in and out of the right-of-way. The sidewalk may conflict with any future fencing installed along the right-of-way by the Parks and Leisure Services Department. · The location of the future Phase III entrance to Wagon Wheel Park is shown on the construction plans and is within + 100 feet of where it will actually be located. · SRA will need to coordinate the construction of Creekview Drive with the future design of Wagon Wheel Park in order to avoid potential construction conflicts. 3. Tree removal from the stock pond area east of State Road · Contractor submitted a change order in the amount of $5000 for removing trees along the stock pond area that were not shown in the plans. · The right-of-way was not staked when the contractor cleared the area. · The change order amount is too high and SRA will contact isi to clarify the number of trees actually outside of the work area. Aerial photographs indicate that many of the trees cleared were within the right-of-way and the scope of work. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN" Rain days · City Inspector will tell the contractor to send a copy of the rain day approval requests to SRA. Installation of street lights and wiring by TXU · SRA will contact Philip Bennett with isi to discuss the deletion of the street lights and wiring from the contract. · City Inspector requested that we have this issue resolved by December 17Ih. Below is a summary of the items discussed during the meeting. 1. Traffic control plan · Contractor has prepared and will submit the traffic control plan for the Ruby Road and State Road/Freeport Parkway intersection. · City will review the plan and forward to SRA for comments then send it back to the contractor. Verizon and TXU facilities · Verizon has not relocated their facilities along the east side of Freeport Parkway yet. · They have indicated to isi that they are going to go underground with the facilities and need to wait until the compacted fill along Freeport Parkway is placed. · Contractor will pothole the location of the underground TXU facilities at the intersections of Freeport Parkway and Ruby and Freeport Parkway and Creekview Drive. Excavation · Contractor has indicated that the excavation is running more than 6000 C.Y. over the bid quantity of 6500 C.Y based on their cut and fill sheets. · Contractor provided SRA and City Inspector with a copy of the cut and fill sheets. · SRA will review the cut and fill sheets. 4. Next meeting is scheduled for Thursday, January 3, 2002 at 10:00 at the project site. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"