Loading...
PA9702-LR 991201 CONCRETE COMP IVE STRENGTH TESC ENGI~aNG, INC. 89~1 Carpenter F~wy, Suite #100 Dallas, Texas 75247 Date of Service: 10/29/1999 Report No.: 9929192 Report Date 12/01/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Coppell Project: Coppell Aquatic/Recreation Ctr Attn: Brad Reid 300 Block of Parkway BIrd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. ~u36051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressire strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: N/A CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 10/29/1999 BATCH TIME: 1:35pm PLANT: 1 TI~4ESAMPLED: 2:00pro BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 71 F CONCRETE: 75 F SLtnVW: 5,0" Max TRUCK NO: 711 TICKET NO: 79487 AIR: N/A AIRCONX~rr(~): N/A UNITWEIGHT(pcf): N/A TEST METHOD: ASTM C- 143 PLACENIENT LOCATION: Pool bottom, mechanical pit floor ASTM C-172 ASTM C-39 SAMPLE LOCATION: Pool bottom REPORT OF TESTS Acct, c~ATsvE vAnns: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMp DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE 1 1 5.00 11/05/1999 7 91360 3230 I 2 5.00 11/05/1999 7 96960 3430 Average 3330 1 3 5.00 11/26/1999 28 123610 4370 1 4 5.00 11/26/1999 28 131950 4670 Average 4520 Sampled from truck. Technician: Greg Dimock Started: 12:30prn Finished: 3:00pro ~ EH 'g~ Report Distribution: (1) City of Coppell (1) City of Coppell - Engineering (1) BrinkIcy Sargent Architects (1) City ofCoppell - Bldg. lnsp. Eugene Harbour (1) Turner Engineers (1) City of Coppell - Leisure Serv Dept Vice President (1) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 1