Loading...
ST9401-CS 990511May 11, 1999 F'ENTEX DEVELOPI~IENT COMPANY 5T 4 ol P.O. Box 199000 Dallas, Texas 75219-9000 3100 McKinnon Street, Suite 370 Dallas, Texas 75201 Phone: 214 981-6770 Mr. Kenneth M. Griffin 255 Parkway Blvd. P.O. Box 478 Coppell, TX 75019-4409 Re: Proposed Free Left Turn Lane, Denton Tap Road south of SH 121 Bypass to the 9 acre Commercial Tract located on the southeast comer of the SH 121 Bypass and Denton Tap in Coppell, Texas Dear Mr. Griffin: The City of Coppell is hereby advised that Centex Development Company CCDC") will be financially responsible for the incremental costs of including the above referenced turn lane with the Denton Tap roadway improvements currently under construction by the city of Coppell or its contractors. I understand that the work will be included as a change order to the current contract. The change order cost (attached as Exhibit "A") provided by Rebcon, Inc. of $35,691 includes the above mentioned turn lane and the property across Denton Tap from CDC's site owned by Beal Mortgage, Inc. It is our understanding that CDC will be responsible for one-half of this cost or $17,845.50. Please call me if this letter is not sufficient for your requirements to approve the inclusion of this project in the Denton Tap construction. Sincerely, Daniel B. Anderson Vice President CO: Bill Anderson, Dowdey, Anderson & Associates, Inc. Mark Pulliarn, Beal Mortgage Mike Martin, City of Coppell 15:57 CITY OF COPPELL ENGIHEER[HG -+ Iur.. U,l,~q rFl KC. ClbUiq, B C O N J INC. 92149816888 I'H~ ~. ~,.~.~444~Z~4 NO. 705 ~2 P. 02/02 May 4, 1999 Mr. Cratteth Campbell · City ot' Coppert P.O. Box 478 Coppell, Texas 75019 Re: Denton Tap Road Cottonwood Creek to SJ, i. 121 Bypass · Following is the co,mr ~eimwle and change order request for the construelion of the double · North and South turn lane you requested: DESCRIP3'I__ON _UNIT Saw k Remove Exist Conc Curb & Cutter LF 265 BRU .roint LF 265 6" Lime Stab Subgrade SY 78S Lime TON 12 8" ReinfConc Pvmt SY 719 Brick Payera w/Coac Bas~ SY 50 4" Topsoil & Hydtomulch $Y <770> PISW 4" P,dnt Markers Elk 40 6" Sch 40 PVC tn'igation Sleeve LF ] 0 F. atthwotk LS l Tota/ ~' s~t,,/,.Ic 'Jd'VC PRICE TOTAKI,, $ 7.I0 $ !,987.50 $ 4.00 $ 1,0~0.00 $ 1,50 $ 1,177.50 $ 92.00 $ 1,104.00 $ 30.00 $21,~70.00 S 70.00 S 3,5O0.00 $ 1.00 <$ 770,O0> $ 5.80 $ 232.00 S 5.00 $ 50.00 $4,900.00 $ 4.900.Q0. Y $34,811,00 ,/ We ~ to know by Momiiy, May tO, if the lmxl owners wani us lo pedorm Lt~ work. because of out current paving schedule. Please call me if ~ have any questions about this requesL Sincerely, F,~CON, INC, Robert C. Bibby 1888 W. NORTHWEST H'WY- DALLAS, TEXAS 75~20 972/444-8230 .4