Loading...
PA9702-LR 991012CONCRETE COMPR 3IVE STRENGTH TES ENGINBERING, INC. 8901 Carpenter Frwy., Suite gl00 Dallas, Texas 75247 Date of Service: 10/01/1999 Report No.: 9926571 Report Date 10/12/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co pell Project: Coppell Aquatic/Recreation Ctr Attn: Bra~Reid 732 DeForest 300 Block of Parkway Blvd Coppell TX 75019 Coppell, Texas/Prj. 4~6051 Services: ~btainsamp~es~ffreshc~ncreteatthep~acement~ocati~ns~perf~rmrequired~e~dtestandcast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: N/A CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 10/01/1999 BATCH TIME: 7:10am PLANT: Lewisville TIME SAMPLED: 8:00am BY: Joey Gordon SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear, cool STRENGTH: 3000 psi @ 28 Days TEMPERATURE (~) - AIn 61 1~ CONCRETe: 73' r SLVMP: 5.0" Max TI~UCK NO: 207 TICKET NO: 78320 AIR: NA AreCONTENT(%): N/A UsrrWEmHT(pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: ASTM C-172 ASTM C-39 SAMPLE LOCATION: 13.8/H.6 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 6.50 10/08/1999 7 63940 2260 I 2 6.50 10/08/1999 7 70950 2510 Average 2390 1 3 6.50 10/29/1999 28 1 4 6.50 10/29/1999 28 Sampled from truck. Technician: loey Gordon Started: 6:00am Finished:10:00am t'~ ~ Engine ~ c. Report Distribution: ( 1 ) City of Coppell ( I ) City of Coppell - Engineering . (1) Brinkley Sargent Architects (1) City ofCoppell - Bldg. lnsp. Eugene Harbour ( 1 ) Turner Engineers ( I ) City of Coppoll - Leisure Serv Dept Vice President (1) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full witbout the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1