Loading...
PA9702-LR 990930CONCRETE COMPREoSIVE STRENGTH TES',.. 8901 Carpent~ Frwy., Suite gl00 Dallas, Trams 75247 Date of Service: 09/22/1999 Report No.: 9925698 Report Date 09/30/1999 Client No.: COPPELL Project No.: 94991118 Client: City nfCoppcll Project: Coppell Aquatic/Recreation Ctr Attn: Brad Reid 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. ~)6051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast comprcssive strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: 6 CONCRETE SUPPLIER: Nelson Bros. PLACEMENTDATE: 09/22/1999 BATCH TIME: 10:lSam PLANT: Lewisville TIMESAMPLED: 10:45am BY: Steve Campbell SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 70 F CONCRETE: 75 F SLC~W: 5.0" Max TRUCK NO: 218 TICKET NO: 77930 AIR: 3-5% AIR CONTENT(%): N/A UNITWEIGHT(per): N/A TEST METHOD: ASTM C- 143 P~ACF~,~NT LOCATION: Outside Comp. swimmjng pool wall, Colunms R3, R4 and RS. ASTM C-172 ASTM SAMPLE LOCATION: See below for sample location REPORT OF TESTS ACC VE YAP, US: 30 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (k~ches) TESTED (days) (lbs. force) (psi) TYPE I 1 6.00 09/29/1999 7 96000 3390 1 2 6.00 09/29/1999 7 91020 3220 Average 3310 1 3 6.00 10/20/1999 28 1 4 6.00 10/20/! 999 28 Samp~.e v.ocatj. on: 0uts~.de comp. sw~_rcanj, ng pool wall_ axed 5 feet no~Tt:h ~OTE: px.Lrap, tOOk sainp].e Technician: Steve Campbell Started: 10:00am Fin/shed: 12:00pm ~( Englneerlng~ Inc. Report Distribution: ( 1 ) City of Coppell ( 1 ) City of Coppoll - Engineering (1) Bdnkley Sargent Architects (1) City of Coppeg - Bldg. lnsp. Eugene Harbour (1) Turner Engineers (1) City ofCoppell - Leisur~ Serv Dcpt Vice President (1) Hisaw & Associates This rcpo~ is exclusively for the use of the client inthcatcd above and shall not be reproduced except in full without the written approva/Of HBC Engineering, Inc. 01SJ Page I of I